09.08.2015 Views

On-Line BBCR User Guide - BT Wholesale

On-Line BBCR User Guide - BT Wholesale

On-Line BBCR User Guide - BT Wholesale

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Column Title<strong>Line</strong> Item SubStatus / <strong>Line</strong> ItemStatus (Cont‟d)ColumnAvailabilityBoth 20 and21 CNCircuitsPossible Entries Format ExplanationFor Combined Orders <strong>On</strong>lyAwaiting PSTN OrderNetwork Resource.In progress – Network resource is available,order under evaluationCombined Orders <strong>On</strong>ly:POINT OF NO RETURNThis status comes between submitted andacknowledged<strong>Line</strong> Test20 CNCircuitsBlankIt is possible to place orders for exchanges thatare planned as a result of the exchangeregistration scheme that are not yet enabled.Orders may be placed 150 days in advance ofthe exchange enablement date. The NetworkAvailability Date will give the date that thenetwork infrastructure will be in place to supportthe required service. Advanced orders will beheld while awaiting availability of the networkresource with an Order Status of 'AwaitingNetwork'. <strong>On</strong>ce the exchange is enabled, theorder is under evaluation and the <strong>Line</strong> ItemSubstatus is 'In Progress‟. The <strong>Line</strong> ItemSubstatus will change to 'Assigned' once thenetwork resource has been allocated, and theorder will then proceed as normal.Point of no return is for SDSL ordersGreen - <strong>Line</strong> test passed. <strong>Line</strong> length and qualitysuitable for DSLPAGE 153 OF 271

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!