what remains probably the largest single contract in the history of the world nuclear industry for<br />

the construction of eight 1.3 GW reactors over a 15-year period. However, due to an everincreasing<br />

debt burden and obvious interest in nuclear weapons by the Brazilian military,<br />

practically the entire program was abandoned. Only the first reactor, Angra-2, was finally<br />

connected to the grid in July 2000, 24 years after construction started.<br />

The construction of Angra-3 was started in 1984 but abandoned in June 1991. However, in<br />

May 2010, Brazil’s Nuclear Energy Commission issued a construction license and the IAEA noted<br />

that a “new” construction started on 1 June 2010. In early 2011, the Brazilian national<br />

development bank (BNDES) approved a 6.1 billion Reais (US$3.6 billion) loan for work on the<br />

reactor. 383 Reportedly, in November 2013, Eletrobras Eletronuclear signed a €1.25 billion<br />

(US$1.425 billion) contract with French builder AREVA for the completion of the plant. 384<br />

According to AREVA, in the first quarter of 2015, 13 percent of the “work packages” had been<br />

approved for delivery to Brazil. “Progress on the project is dependent on the securing of project<br />

financing by the customer”, AREVA added. 385 Commissioning was previously planned for<br />

July 2016 but has been delayed to May 2018. No reasons were given for the new delays. 386<br />

The position on nuclear power of the incoming government under President Mauricio Macri<br />

remains unclear. The issue did not play any role in the December 2015 election.<br />

Canada operates 19 reactors, all of which are CANDU (CANadian Deuterium Uranium),<br />

providing 95.6 TWh or 16.6 percent of the country’s electricity in 2015 (down from a maximum<br />

of 19.1 percent in 1994), but 60 percent of the Province of Ontario’s provincial power supply.<br />

However, in Ontario, the role of wind power is rapidly expanding and already represents<br />

10 percent of the Province's installed capacity—versus 36 percent for nuclear—and has doubled<br />

its share in the generation mix from 3 to 6 percent in just two years. 387<br />

The Canadian CANDU reactor design typically requires extensive repair and upgrading work to<br />

operate beyond 25 years. This work—often referred to as re-tubing or refurbishment—involves<br />

the removal and replacement of hundreds of highly radioactive pressure tubes from the reactor<br />

core, as well as the replacement of other life-limiting components, such as steam generators, and<br />

the upgrading of plant systems to meet modern regulatory requirements.<br />

The estimated cost of extending the life of a CANDU reactor has tripled over the past fifteen years.<br />

In 2002, the cost of refurbishing New Brunswick’s single unit Point Lepreau nuclear station was<br />

estimated at CAD840 million (US$533 million). 388 In 2012, Hydro-Quebec estimated the cost of<br />

383 However, it is surprising to note that AREVA’s 400-page Reference Document 2012 does not even<br />

contain the word “Angra”.<br />

384 NucNet, “Brazil Releases Production Figures For Angra Nuclear Station”, 20 January 2014, see<br />

http://www.nucnet.org/all-the-news/2014/01/20/brazil-releases-production-figures-for-angra-nuclear-station;<br />

and WNN, “Areva contracted to complete Angra 3”, 8 November 2013, see http://www.world-nuclearnews.org/C-Areva-contracted-to-complete-Angra-3-081134.html;<br />

both accessed 16 June 2016.<br />

385 AREVA, Press Release, 29 April 2015.<br />

386 NIW, “Briefs—Brazil”, 9 January 2015.<br />

387 IESO (Independent Electricity System Operator), “Supply Overview”, see<br />

http://www.ieso.ca/Pages/Power-Data/supply.aspx, accessed 5 June 2016.<br />

388 NB Power, “Project Execution Plan—Appendix A-4, Table 1-1”, February 2002.<br />

Mycle Schneider, Antony Froggatt et al. 121 World Nuclear Industry Status Report 2016