Plant<br />

Grid Connection<br />

Extension<br />

Application<br />

Extension<br />

Granted<br />

Fermi 2 9/86 4/14<br />

LaSalle 1, 2 9/82, 4/84 12/14<br />

Waterford 3 3/85 3/16<br />

River Bend 1 12/85 Expected 1-3/17<br />

Comanche Peak 1, 2 4/90, 4/93 Expected 7-9/18<br />

Perry 1 12/86 Expected 10/19<br />

Clinton 1 4/87 Expected 1-3/21<br />

Sources:<br />

• For grid connection dates:<br />

https://www.iaea.org/PRIS/CountryStatistics/CountryDetails.aspx?current=US<br />

• For life extension dates: http://www.nrc.gov/reading-rm/doc-collections/fact-sheets/fs-reactor-licenserenewal.html,<br />

updated January 2016, accessed 16 June 2015 ; and<br />

http://www.nrc.gov/reactors/operating/licensing/renewal/applications.html, reviewed/updated<br />

14 April 2015, accessed 16 June 2015.<br />

Notes:<br />

(1) Pairs of reactors marked † have significantly different designs.<br />

(2) The STARS Alliance of nuclear power plant owners has informed the NRC it will submit applications for life<br />

extensions for two unnamed units in 2016 and 2018. The Comanche Peak reactors are the only ones owned by<br />

STARS members that have not already applied for life extension or have had it granted, so it is assumed the<br />

application refers to these two units.<br />

(3) Nine Mile Point 2 applied for and received a license extension before its 20 th birthday.<br />

(4) Kewaunee and Vermont Yankee facilities both applied for Lifetime Extensions which were granted in<br />

February 2011 and June 2011, before Kewaunee was shut down on 7 May 2013 and Vermont Yankee on<br />

29 December 2014.<br />

(5) Crystal River’s Unit 3 was first connected to the grid January 1977. An application for a lifetime extension<br />

was submitted in December 2008, then withdrawn on 6 February 2013. Crystal River-3 was permanently shut<br />

down on 20 February 2013.<br />

Mycle Schneider, Antony Froggatt et al. 222 World Nuclear Industry Status Report 2016

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!