On 22 December 2015, FANC authorized the lifetime extension and restart of Doel-1 and -2.<br />

Beyond the issues of lifetime extensions and restarts, FANC and his director Jan Bens made some<br />

headlines in Belgium over the past year. 713 An external, interview-based audit of FANC was carried<br />

out and the 70-page report leaked to the press in April 2016. The conclusions by the auditors of<br />

Whyte Corporate Affairs seriously undermine the credibility of the Belgian Safety Authority, as<br />

they identified a “toxic internal climate”, “lack of leadership”, “power struggles” and more. 714<br />

Finland operates four units that supplied a record 22.3 TWh or 33.7 percent of its electricity<br />

in 2015 (with a maximum of 38.4 percent in 1986). Finland has adopted different nuclear<br />

technologies and suppliers, as two of its operating reactors are PWRs built by Russian contractors<br />

at Loviisa, while two are BWRs built by ABB (Asea Brown Boveri) at Olkiluoto.<br />

In December 2003, Finland became the first country to order a new nuclear reactor in Western<br />

Europe in 15 years. AREVA NP, then a joint venture owned 66 percent by AREVA and 34 percent<br />

by Siemens 715 , is building a 1.6 GW EPR at Olkiluoto (OL3) under a fixed-price turn-key contract<br />

with the utility TVO. After the 2015 technical bankruptcy of AREVA Group, the majority<br />

shareholder, the French government, decided to integrate the reactor-building division into a<br />

subsidiary majority-owned by state utility EDF and open to third-party investment. However, EDF<br />

has made it clear repeatedly that it will not take over the billions of euros’ liabilities linked to the<br />

costly Finnish AREVA adventure. 716 Responsibility for those liabilities remains unclear. An<br />

attempt by French Economy Minister Emmanuel Macron to accelerate the resolution of the<br />

pending international conflict opposing AREVA and TVO ended without apparent progress.<br />

The OL3 project was financed essentially on the balance sheets of the Finland's leading firms and<br />

municipalities under a unique arrangement that makes them liable for the plant’s indefinite<br />

capital costs for an indefinite period, whether or not they get the electricity—a capex “take-or-pay<br />

contract”.<br />

Construction started in August 2005 at Olkiluoto on the west coast. The project is at least nine<br />

years behind schedule and is at least about three times over budget. In its 2015 Annual Report,<br />

TVO notes:<br />

According to an announcement of the OL3 turnkey supplier, the delivery will be delayed from the<br />

original schedule according to which the power plant unit should have been in production as of 30<br />

April 2009. In compliance with the supply contract the company is entitled to compensation in case<br />

the delay is due to the supplier. Additionally, because of the delay the company has incurred and will<br />

713 See for example a series of papers in Le Soir, “Prolongation du Nucléaire”, (in French), see<br />

http://www.lesoir.be/tag/prolongation-du-nucleaire?page=3, accessed 18 June 2016.<br />

714 Le Soir, 25 April 2016, extract quoted by Jean-Marc Nollet, “Un audit sème le doute sur la crédibilité de<br />

l'agence nucléaire”, Press Release, 25 April 2016, (in French), see http://www.nollet.info/actualites/unaudit-same-le-doute-sur-la-cradibilita-de-laagence-nuclaaire,<br />

accessed 18 June 2016.<br />

715 Siemens quit the consortium in March 2011 and announced in September 2011 that it was abandoning<br />

the nuclear sector entirely.<br />

716 Le Monde, “EDF pose ses conditions au rachat des réacteurs d’Areva”, 19 May 2015, see<br />

http://www.lemonde.fr/economie/article/2015/05/19/edf-pose-ses-conditions-au-rachat-des-reacteurs-dareva_4636164_3234.html,<br />

accessed 2 July 2016.<br />