The following section provides a short overview by country (in alphabetical order).<br />

Belgium Focus<br />

Belgium operates seven pressurized-water reactors and, for many years, had the world’s second<br />

highest share of nuclear in its power mix, behind France. Due to technical issues described below,<br />

it dropped to 47.5 percent in 2014—less than 50 percent for the first time since 1983 693 —and to<br />

37.5 percent in 2015 (the maximum was 67.2 percent in 1986). The nuclear plants generated<br />

24.8 TWh in 2015, another drop of 22.6 percent over 2014, and almost half of their highest output<br />

of 46.7 TWh in 1999. Load factors of individual reactors were obviously particularly low for the<br />

two units plagued by pressure vessel issues (see hereunder) and restarts only towards the end of<br />

the year, Doel-3 with 0.7 percent and Tihange-2 with 4.4 percent (see Figure 48).<br />

Figure 48: Load Factors of Belgian Nuclear Reactors<br />

%<br />

100<br />

Load Factors of Belgian Reactors<br />

(annual 2015 and cumulative, in %)<br />

80<br />

60<br />

40<br />

20<br />

© Mycle Schneider Consulting<br />

0<br />

Doel-1 Doel-2 Doel-3 Doel-4 Tihange-1 Tihange-2 Tihange-3<br />

Load Factor 2015<br />

Load Factor Cumulative<br />

Sources: IAEA-PRIS, MSC, 2016<br />

Legally, the decision does not put into question the nuclear phase-out target of 2025: In January<br />

2003, nuclear phase-out legislation required the shutdown of all Belgium’s nuclear plants after<br />

40 years, so based on their start-up dates, plants would be shut down between 2015 and 2025<br />

(see Figure 49). Practically, however, the new shutdown dates mean that five of the seven reactors<br />

would go offline in the single year of 2025.<br />

Following Fukushima, the phase-out legislation was left in place even though GDF-Suez (now<br />

Engie), that operates all seven PWRs in Belgium through its subsidiary Electrabel, was lobbying<br />

to postpone it via an extension of “at least 10 years”. 694 In December 2013, the phase-out<br />

693 World Bank, quoted in Perspective Monde, see<br />

http://perspective.usherbrooke.ca/bilan/servlet/BMTendanceStatPays?langue=fr&codePays=BEL&codeStat=E<br />

G.ELC.NUCL.ZS&codeStat2=x, accessed 25 May 2015.<br />

694 Gérard Mestrallet, et al., “Nuclear in Belgium: recent developments”, GDF Suez, 4 November 2011.<br />

Mycle Schneider, Antony Froggatt et al. 172 World Nuclear Industry Status Report 2016