announced in April 2004 that his government would “gradually abandon” nuclear energy, while<br />

increasing funding for renewable energy. The first unit (José Cabrera) was shut down at the end<br />

of 2006. Zapatero confirmed the nuclear phase-out goal following his reelection in 2008, and then<br />

Industry Minister Miguel Sebastian has stated that “there will be no new nuclear plants”. 790 As of<br />

mid-June 2016, in the absence of an established new government, there is no clear visibility of<br />

national energy policy in Spain.<br />

Spanish nuclear operators have been implementing both upratings and life extensions for existing<br />

facilities that increased nominal capacity by around 10 percent. Further minor upratings are<br />

planned. 791 The nuclear lobby organization Foro Nuclear claims that over 80 percent under the<br />

post-Fukushima National Action Plan scheduled safety measures had been implemented by<br />

March 2016. 792 In February 2011, the Spanish parliament amended the Sustainable Energy Law,<br />

deleting from the text a reference to a 40-year lifetime limitation and leaving nuclear share and<br />

lifetime to be determined by the government. 793 Nevertheless, on 16 December 2012, Garoña was<br />

shut down permanently. The operator Nuclenor had calculated that further operation of the<br />

446 MW plant would not be economic. The Cabinet of the Government elected in November 2011<br />

approved in February 2014 a Royal Decree that would enable any recently shut reactors, in this<br />

case Garoña, to re-apply for their operating reactors within the next 12 months. In May 2014,<br />

Nuclenor applied for a new license to operate until 2031. 794 However, there is still no official time<br />

schedule for restart. The Spanish parliament, with the support of most of the represented parties,<br />

including PSOE and Podemos, passed a motion against Garoña restart. 795 Eleven mayors of towns<br />

in the vicinity of the plant have protested against the proposed restart and called for the closure<br />

of the unit to be confirmed. 796<br />

More recently, opposition has also been voiced in neighboring Portugal against the continued<br />

operation of the two aging 35- and 33-year-old reactors at Almaraz. According to two Members of<br />

the European Parliament (MEP), in a written question to the European Commission, on<br />

29 April 2016, the Portuguese Parliament adopted a resolution “recommending that the<br />

government take all the necessary initiatives vis-à-vis the Spanish State and European institutions<br />

with the aim of ensuring that the Almaraz power plant is closed down”. 797 The Portuguese<br />

790 Reuters, “Spain Insists on Energy Saving, Not Nuclear Plants”, 21 January 2009.<br />

791 IEA, “Energy Policies of IEA Countries—Spain 2015 Review”, 2015.<br />

792 Foro Nuclear, “Spanish nuclear plants 5 years after Fukushima”, 4 March 2016,<br />

see http://www.foronuclear.org/en/news/latest-news/122104-spanish-nuclear-power-plants-5-years-afterfukushima,<br />

accessed 2 July 2016.<br />

793 WNN, “No Limits for Spanish Reactors”, 17 February 2011, see http://www.world-nuclear-news.org/NP-<br />

No_limits_for_Spanish_reactors-1702117.html, accessed 2 July 2016.<br />

794 Nuclenor, “Nuclenor submits application to renew the operating licence of the plant Garoña”, Press<br />

Release, 27 May 2014.<br />

795 Spanish News Today, “Greenpeace activists protest at Burgos nuclear power plant reopening plans”,<br />

17 February 2016, see http://spanishnewstoday.com/greenpeace-activists-protest-at-burgos-nuclear-powerplant-reopening-plans_62450-a.html,<br />

accessed 2 July 2016.<br />

796 EITB, “Mayors urge EU to monitor the possible re-opening of Garoña”, 17 June 2014.<br />

797 Ana Gomes (S&D), Marisa Matias (GUE/NGL), “Subject: Almaraz nuclear power plant”, Parliamentary<br />

Questions, Question for written answer to the Commission, Rule 130, European Parliament, 12 May 2016,<br />

Updated 24 May 2016, see http://www.europarl.europa.eu/sides/getDoc.do?pubRef=-//EP//TEXT+WQ+E-<br />

2016-003944+0+DOC+XML+V0//EN, accessed 2 July 2016.<br />

Mycle Schneider, Antony Froggatt et al. 190 World Nuclear Industry Status Report 2016