directed by government planners to do so, the two organizations jointly developed the Hualong<br />

One, which was certified by the National Nuclear Safety Administration in 2014. 519 However,<br />

CNNC and CGN are apparently promoting two slightly different designs, with separate supply<br />

chains, under the same name. In March 2016, the two companies set up a 50-50 joint venture to<br />

promote this design in overseas markets. 520<br />

Construction of the Hualong design started domestically in China with units 5 and 6 of the Fuqing<br />

plant in May and December 2015, as well as unit 3 of Fangchenggang in December 2015. The first<br />

of these units “is expected to be completed by around June 2020”. 521 However, as these projects<br />

proceed, construction of the Hualong at the Fuqing plant might be delayed, again because the RCPs<br />

to be used in the design are already “falling behind schedule for (sic!) five months”. 522 Unlike the<br />

AP1000 project that sourced its RCPs from the Curtiss-Wright company, for the Hualong design,<br />

CNNC signed a supply contact with China’s Harbin Electric Power Equipment Corporation and the<br />

Austrian manufacturer Andritz, who in turn have subcontracted with firms such as Italy’s<br />

Foriatura to supply key components. 523 Other construction starts since July 2015, when the last<br />

WNISR was published, include Tianwan-5, Hongyanhe-6, and Changjiang-2.<br />

All these reactor construction starts and targets should be viewed in the context of a slowdown of<br />

energy demand growth in China. According to data from the China Electricity Council, the 2015<br />

power-generation level of 5,604.5 TWh was only 0.6 percent more than the figure for 2014. 524<br />

Looking further out, in its 2016 Energy Outlook, the oil and gas firm ExxonMobil “lowered its<br />

forecast for China’s annual energy demand growth to 2.2 percent through 2025. The report<br />

predicted that the country’s energy demand would plateau around 2030”. 525 The slowdown of<br />

energy demand, in turn, is a result of falling rate of increase of the Gross Domestic Product (GDP),<br />

increased energy efficiency, and a change in the relative distribution of different sectors of the<br />

economy, in particular a decline in the share of industry. 526 China also has a significant<br />

overcapacity of coal-fired power plants, with average annual operating hours and capacity factors<br />

declining steadily over the past five years. 527 One effect of this decline in demand and coal plant<br />

overcapacity on the nuclear sector might be the 10 percent stake sold to Thailand’s Ratchaburi<br />

Electricity Generating Holding Public Co. by CGN for its first Hualong project at Fangchenggang II,<br />

519 WNN, “China’s new nuclear baby”, 2 September 2014, see http://www.world-nuclear-news.org/E-Chinasnew-nuclear-baby-0209141.html,<br />

accessed 24 June 2016.<br />

520 WNN, “Hualong One joint venture officially launched”, 17 March 2016, see http://www.world-nuclearnews.org/C-Hualong-One-joint-venture-officially-launched-1703164.html,<br />

accessed 1 July 2016.<br />

521 Reuters, “China’s debut Westinghouse reactor delayed until June 2017: exec”, Reuters, 9 March 2016,<br />

see http://www.reuters.com/article/us-china-parliament-nuclear-idUSKCN0WB09F, accessed 16 June 2016.<br />

522 C. F. Yu, “RCPs Pose Problems Again—This Time for Hualong”, NIW, 2016.<br />

523 Ibidem.<br />

524 China Electricity Council, Press Release, 3 February 2016, see<br />

http://www.cec.org.cn/yaowenkuaidi/2016-02-03/148763.html, accessed 2 June 2016.<br />

525 Claire Groden, “Exxon Cuts China Energy Demand Growth forecast”, Fortune, 26 January 2016, see<br />

http://fortune.com/2016/01/26/china-energy-demand/, accessed 16 June 2016.<br />

526 Fergus Green, Nicholas Stern, “China’s changing economy: implications for its carbon dioxide<br />

emissions”, Climate Policy, 7 March 2016.<br />

527 Fredrich Kahrl, “Coal-Fired Generation Overcapacity in China”, Regulatory Assistance Project, Beijing<br />

(China), February 2016, see http://www.raponline.org/document/download/id/8038, accessed 9 July 2016.<br />

Mycle Schneider, Antony Froggatt et al. 143 World Nuclear Industry Status Report 2016