Sl.<br />

No.<br />

Project Details<br />

2. Kamalanga TPP<br />

(GMR Kamalanga Energy<br />

Ltd.)<br />

Distt: Dhenkenal, Orissa<br />

Unit-1<br />

3.<br />

4.<br />

5.<br />

Unit-2<br />

Unit-3<br />

Dated of Main Plant Order :<br />

Zero Date or FC date:<br />

Original Approved cost:<br />

Latest cost:<br />

Expenditure(up to 31.03.09)<br />

Expenditure during 2009-10<br />

(up to 11/09)<br />

Derang TPP<br />

(JITPL)<br />

Distt: Angul, Orissa<br />

Unit-1<br />

Unit-2<br />

Date of Main Plant Order:<br />

Original approved cost:<br />

Malaxmi TPP<br />

Distt: Dhenkenal, Orissa<br />

Unit-1<br />

Unit-2<br />

Unit-3<br />

Date of Main Plant Order:<br />

Zero Date:<br />

Ind.Bharat Energy TPP<br />

Distt: Jharsuguda,<br />

Orissa<br />

Unit-1<br />

Unit-2<br />

Date of Main Plant Order<br />

Capacity<br />

(MW)<br />

1050<br />

Syn.<br />

Comm<br />

Commissioning Schedule<br />

Original Actual(A)/ As<br />

now Expected<br />

COD Syn.<br />

Comm<br />

COD<br />

350 11/11 04/12<br />

350 01/12 06/12<br />

350 03/12 08/12<br />

27.08.08 on SEPCo.I, China<br />

27.05.2009<br />

Rs 454000 lakhs<br />

Rs 454000 lakhs<br />

Rs 18741 lakhs<br />

Rs 65144 lakhs<br />

1200<br />

600 12/11 12/11<br />

600 02/12 03/12<br />

26.06.09<br />

Rs 596100 lakhs<br />

Zero Date: 26.06.09<br />

1040<br />

350<br />

350<br />

350<br />

700<br />

350 12/11<br />

350 02/12<br />

Boiler – 16.05.09<br />

TG – 01.10.09 Cethar vessels<br />

- 101 -<br />

Broad Status<br />

Order placed on SEPCO, China as EPC<br />

contractor on 27.08.08. M/s Harbin,<br />

China is Boiler supplier, M/s<br />

Dongfang Turbine,, China is Turbine<br />

supplier and M/s Dongfang Electric<br />

machinery is Generator supplier.<br />

Soil investigation completed. Boundary<br />

wall construction in progress. Boiler<br />

foundation work will start in Jul’10.<br />

Boiler erection is expected to start in<br />

09/10.<br />

TG erection expected to start in 11/10.<br />

Order for main plant placed on M/s<br />

BHEL on 26.06.09. Boundary wall<br />

construction in progress. PPA signed<br />

with a power trader (500 MW).<br />

Order for Cooling tower is placed on<br />

Paharpur Cooling Towers.<br />

Order for chimney placed on Gammon<br />

India.<br />

Foundations in boiler area is in progress.<br />

Boiler erection expected to start in<br />

Sep’10.<br />

EPC contract placed on M/s Indure<br />

limited. M/s Harbin, China is BTG<br />

supplier. PPA signed with GRIDCO &<br />

PTC. Financial closure achieved<br />

Order for boiler, TG placed on M/s<br />

cethar vessels on 16.05.09 and 01.10.09<br />

respectively.<br />

Order for cooling tower placed on<br />

08.05.10 on M/s Spig Cooling Towers.<br />

Excavation and concerting in Main<br />

building, Boiler, Boiler Auxiliaries, TG<br />

area is in progress.<br />

Critical<br />

Areas