Sl.<br />
No.<br />
Project Details<br />
2. Kamalanga TPP<br />
(GMR Kamalanga Energy<br />
Ltd.)<br />
Distt: Dhenkenal, Orissa<br />
Unit-1<br />
3.<br />
4.<br />
5.<br />
Unit-2<br />
Unit-3<br />
Dated of Main Plant Order :<br />
Zero Date or FC date:<br />
Original Approved cost:<br />
Latest cost:<br />
Expenditure(up to 31.03.09)<br />
Expenditure during 2009-10<br />
(up to 11/09)<br />
Derang TPP<br />
(JITPL)<br />
Distt: Angul, Orissa<br />
Unit-1<br />
Unit-2<br />
Date of Main Plant Order:<br />
Original approved cost:<br />
Malaxmi TPP<br />
Distt: Dhenkenal, Orissa<br />
Unit-1<br />
Unit-2<br />
Unit-3<br />
Date of Main Plant Order:<br />
Zero Date:<br />
Ind.Bharat Energy TPP<br />
Distt: Jharsuguda,<br />
Orissa<br />
Unit-1<br />
Unit-2<br />
Date of Main Plant Order<br />
Capacity<br />
(MW)<br />
1050<br />
Syn.<br />
Comm<br />
Commissioning Schedule<br />
Original Actual(A)/ As<br />
now Expected<br />
COD Syn.<br />
Comm<br />
COD<br />
350 11/11 04/12<br />
350 01/12 06/12<br />
350 03/12 08/12<br />
27.08.08 on SEPCo.I, China<br />
27.05.2009<br />
Rs 454000 lakhs<br />
Rs 454000 lakhs<br />
Rs 18741 lakhs<br />
Rs 65144 lakhs<br />
1200<br />
600 12/11 12/11<br />
600 02/12 03/12<br />
26.06.09<br />
Rs 596100 lakhs<br />
Zero Date: 26.06.09<br />
1040<br />
350<br />
350<br />
350<br />
700<br />
350 12/11<br />
350 02/12<br />
Boiler – 16.05.09<br />
TG – 01.10.09 Cethar vessels<br />
- 101 -<br />
Broad Status<br />
Order placed on SEPCO, China as EPC<br />
contractor on 27.08.08. M/s Harbin,<br />
China is Boiler supplier, M/s<br />
Dongfang Turbine,, China is Turbine<br />
supplier and M/s Dongfang Electric<br />
machinery is Generator supplier.<br />
Soil investigation completed. Boundary<br />
wall construction in progress. Boiler<br />
foundation work will start in Jul’10.<br />
Boiler erection is expected to start in<br />
09/10.<br />
TG erection expected to start in 11/10.<br />
Order for main plant placed on M/s<br />
BHEL on 26.06.09. Boundary wall<br />
construction in progress. PPA signed<br />
with a power trader (500 MW).<br />
Order for Cooling tower is placed on<br />
Paharpur Cooling Towers.<br />
Order for chimney placed on Gammon<br />
India.<br />
Foundations in boiler area is in progress.<br />
Boiler erection expected to start in<br />
Sep’10.<br />
EPC contract placed on M/s Indure<br />
limited. M/s Harbin, China is BTG<br />
supplier. PPA signed with GRIDCO &<br />
PTC. Financial closure achieved<br />
Order for boiler, TG placed on M/s<br />
cethar vessels on 16.05.09 and 01.10.09<br />
respectively.<br />
Order for cooling tower placed on<br />
08.05.10 on M/s Spig Cooling Towers.<br />
Excavation and concerting in Main<br />
building, Boiler, Boiler Auxiliaries, TG<br />
area is in progress.<br />
Critical<br />
Areas