Sl.<br />
No.<br />
Project Details<br />
Bongaigaon TPS,<br />
Distt: Kokrajhar.<br />
(Assam) NTPC<br />
U#1<br />
U#2<br />
Cap.<br />
(MW)<br />
750<br />
250<br />
250<br />
U#3 250<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
Syn.<br />
Com<br />
11/10<br />
01/11<br />
03/11<br />
05/11<br />
07/11<br />
09/11<br />
now Expected<br />
COD Syn.<br />
Com<br />
COD<br />
- 06/11<br />
07/11<br />
- 10/11<br />
01/12<br />
- 02/12<br />
Date of approval : 30/01/2008<br />
Org.Est. cost : Rs.437535 Lakhs<br />
Latest cost : Rs.437535 Lakhs<br />
Exp. During 2007-08 : Rs. 23831 Lakhs<br />
Exp. During 2008-09 : Rs. 16046 lakhs<br />
Exp. During 2009-10 : Rs 67833 lakhs<br />
03/12*<br />
08/11<br />
02/12<br />
04/12<br />
Exp. During 2010-11<br />
(up to 5/10)<br />
: Rs 8647 lakhs<br />
Cumulative Exp<br />
(up to 5/10)<br />
: Rs 116327 lakhs<br />
Type of fuel : Coal<br />
Date of Main Plant : 05/02/08 , BHEL<br />
Order<br />
Coal Source and<br />
Source of Coal & Transportation :<br />
Transportation :<br />
2/3 of required Coal will be<br />
transported from Margarita-<br />
Makuma mines of NECL (Upper<br />
Assam). Rest 1/3 will be supplied<br />
by ECL mines in Raniganj area of<br />
West Bengal. Coal will be<br />
transported using Railway wagons<br />
by BOBR.<br />
Power Evacuation: 1. 400KV BTPS(NTPC)-<br />
Bongaigaon (PG) D/C Line<br />
2. 220 KV BTPS(NTPC)-<br />
Bongaigaon (Assam ) D/C Line<br />
*( Best Efforts )<br />
- 20 -<br />
Broad Status<br />
Chimney ( Gammon ) : Raft<br />
concreting work completed in 2/10.<br />
CHP ( McNelly Bharat) Order<br />
placed on 20.01.2010.<br />
Unit-1:<br />
• Boiler Erection started on<br />
27/02/09 and out of 13000 MT<br />
of boiler material 11735 MT<br />
have been erected upto 01/10.<br />
• Drum lifted on 25/01/2010.<br />
• Hydro test expected in 10/2010.<br />
• ESP erection commenced and<br />
out of 2900 MT of ESP material<br />
250 MT have been erected upto<br />
01/2010<br />
• Condenser erection started in<br />
02/2010<br />
• TG deck casting under progress.<br />
Erection expected to start in<br />
08/2010.<br />
Unit-2:<br />
• Boiler Erection started on 10 th<br />
March., 2010.<br />
• Drum lifting expected in<br />
08/2010.<br />
• Condenser erection expected to<br />
start by 10/2010.<br />
• TG pedestal completion is<br />
expected by 09/10.<br />
Unit-3:<br />
• Boiler Erection expected to start<br />
in 09/10.<br />
• Condenser erection expected to<br />
start by 02/11.<br />
• TG pedestal completion is<br />
expected by 01/11.<br />
Critical<br />
Areas<br />
i) Slow<br />
progress on<br />
civil front by<br />
M/s SMPL.<br />
ii) Local<br />
Law & Order<br />
problem.