Sl.<br />

No.<br />

Project Details<br />

Bongaigaon TPS,<br />

Distt: Kokrajhar.<br />

(Assam) NTPC<br />

U#1<br />

U#2<br />

Cap.<br />

(MW)<br />

750<br />

250<br />

250<br />

U#3 250<br />

Commissioning Schedule<br />

Original Actual(A) / As<br />

Syn.<br />

Com<br />

11/10<br />

01/11<br />

03/11<br />

05/11<br />

07/11<br />

09/11<br />

now Expected<br />

COD Syn.<br />

Com<br />

COD<br />

- 06/11<br />

07/11<br />

- 10/11<br />

01/12<br />

- 02/12<br />

Date of approval : 30/01/2008<br />

Org.Est. cost : Rs.437535 Lakhs<br />

Latest cost : Rs.437535 Lakhs<br />

Exp. During 2007-08 : Rs. 23831 Lakhs<br />

Exp. During 2008-09 : Rs. 16046 lakhs<br />

Exp. During 2009-10 : Rs 67833 lakhs<br />

03/12*<br />

08/11<br />

02/12<br />

04/12<br />

Exp. During 2010-11<br />

(up to 5/10)<br />

: Rs 8647 lakhs<br />

Cumulative Exp<br />

(up to 5/10)<br />

: Rs 116327 lakhs<br />

Type of fuel : Coal<br />

Date of Main Plant : 05/02/08 , BHEL<br />

Order<br />

Coal Source and<br />

Source of Coal & Transportation :<br />

Transportation :<br />

2/3 of required Coal will be<br />

transported from Margarita-<br />

Makuma mines of NECL (Upper<br />

Assam). Rest 1/3 will be supplied<br />

by ECL mines in Raniganj area of<br />

West Bengal. Coal will be<br />

transported using Railway wagons<br />

by BOBR.<br />

Power Evacuation: 1. 400KV BTPS(NTPC)-<br />

Bongaigaon (PG) D/C Line<br />

2. 220 KV BTPS(NTPC)-<br />

Bongaigaon (Assam ) D/C Line<br />

*( Best Efforts )<br />

- 20 -<br />

Broad Status<br />

Chimney ( Gammon ) : Raft<br />

concreting work completed in 2/10.<br />

CHP ( McNelly Bharat) Order<br />

placed on 20.01.2010.<br />

Unit-1:<br />

• Boiler Erection started on<br />

27/02/09 and out of 13000 MT<br />

of boiler material 11735 MT<br />

have been erected upto 01/10.<br />

• Drum lifted on 25/01/2010.<br />

• Hydro test expected in 10/2010.<br />

• ESP erection commenced and<br />

out of 2900 MT of ESP material<br />

250 MT have been erected upto<br />

01/2010<br />

• Condenser erection started in<br />

02/2010<br />

• TG deck casting under progress.<br />

Erection expected to start in<br />

08/2010.<br />

Unit-2:<br />

• Boiler Erection started on 10 th<br />

March., 2010.<br />

• Drum lifting expected in<br />

08/2010.<br />

• Condenser erection expected to<br />

start by 10/2010.<br />

• TG pedestal completion is<br />

expected by 09/10.<br />

Unit-3:<br />

• Boiler Erection expected to start<br />

in 09/10.<br />

• Condenser erection expected to<br />

start by 02/11.<br />

• TG pedestal completion is<br />

expected by 01/11.<br />

Critical<br />

Areas<br />

i) Slow<br />

progress on<br />

civil front by<br />

M/s SMPL.<br />

ii) Local<br />

Law & Order<br />

problem.