Sl.<br />
No.<br />
Project Details<br />
Capacity<br />
(MW)<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
now Expected<br />
Syn. COD Syn. COD<br />
(Com.) (Com.)<br />
B. PROJECT UNDER CONSTRUCTION<br />
PRIVATE SECTOR<br />
1. Jhajjar TPP<br />
CLP Power India Ltd.<br />
(Distt-Hissar)<br />
1320<br />
U-1 660 11/11 01/12 11/11 01/12<br />
(12/11) (12/11)<br />
U-2 660 03/12 07/12 03/12 05/12<br />
Date of Sanction /<br />
Investment Decision<br />
(04/12)<br />
(04/12)<br />
Sanctioning <strong>Authority</strong> Govt. of Haryana<br />
Est.approved cost Rs.600000 Lakhs<br />
Expenditure (upto 3/08) Nil<br />
Cum. Expenditure (upto 1/09) Rs. --- lakhs<br />
Type of fuel Coal<br />
Fuel Linkage A long term coal linkage has been<br />
awarded by the standing committee<br />
(SC(LT)) under Ministry of Coal, Govt.<br />
of India.<br />
Order main plant<br />
Power Evacuation system<br />
M/s SEPCOIII, China.<br />
- 40 -<br />
Broad Status<br />
a) M/s SEPCOIII, China is Main plant<br />
suppler.<br />
b) MOE&F clearance obtained on 24.4.08.<br />
c) Boiler will be sourced from Harbin<br />
boiler co Ltd.<br />
d) Turbine & Auxiliaries will be sourced<br />
from Dongfang Turbine Corporation<br />
Limited, China.<br />
e) Generator will be sourced from<br />
Dongfang Electric Machinery co Ltd.,<br />
China.<br />
f) Foundation construction for chimney is<br />
in progress.<br />
g) NDCT diagonal column 80% completed.<br />
h) Excavation for coal handling plant and<br />
wagon tippler is in progress.<br />
i) Casting of racker column of cooling<br />
tower #1 started.<br />
Unit-1<br />
a. Foundation work for main power house<br />
and boiler area for Unit-1 completed.<br />
b. Coal bunker erection is in progress.<br />
c. 6 out of 7 layers of boiler erection<br />
completed.<br />
d. ESP structural erection work is in<br />
progress.<br />
Unit-2<br />
a. Structural steel erection is in progress.<br />
Column erection of 3 rd row is in<br />
progress.<br />
Critical<br />
Areas