Sl.<br />

No.<br />

Project Details<br />

Commissioning Schedule<br />

Capacity<br />

(MW)<br />

Original Actual(A) / As<br />

now Expected<br />

Syn. COD Syn. COD<br />

(Com.) (Com.)<br />

C. PROJECTS WHERE CONTRUCTION IS YET TO START<br />

1.<br />

PRIVATE SECTOR<br />

Goindwal Sahib TPP<br />

M/s GVK Power<br />

(Goindwal Sahib) Ltd.<br />

540<br />

(Distt. TaranTaran)<br />

Unit-1<br />

Unit-2<br />

270<br />

270<br />

3/09 36/42 months from 3/09<br />

11/0 Financial Closure<br />

11/09<br />

Date of clearance by state Govt. State Cleared<br />

Est. approved cost (revised)<br />

Revised cost after approval of<br />

Appellate Tribunal order dated<br />

08.04.09<br />

Rs. 298786 Lakhs<br />

Rs.296381 Lakhs<br />

Exp. upto 11/2008 Rs. 29207 Lakhs<br />

Financial closure : 12 months from PPA approval<br />

by PSERC(Exptd by May’10)<br />

Type of fuel Coal<br />

Fuel linkage From SEREGARHA coal block<br />

in Jharkhand<br />

Date of main plant order : Aug’08 on M/s BHEL<br />

Power Evacuation Facility to be completed by<br />

PSEB<br />

7 months prior to COD.<br />

- 42 -<br />

Broad Status<br />

a) PPA was signed on 17.04.2000. Restated<br />

PPA initialed on 06.02.07.<br />

b) NOC from MOE&F was obtained on<br />

23.09.99 for 2x281 MW. Revised NOC from<br />

MOE&F obtained on 09 th May’08 for 2x300<br />

MW.<br />

c) Capacity further revised by the firm from<br />

300 MW to 270 MW.<br />

d) Out of the total land 1014 acres required for<br />

the project M/s GVK is in possession of 53<br />

acres, balance land acquisition is under<br />

progress as per the approval of PSERC and<br />

Govt.of Punjab.<br />

e) LOI issued on 18.5.98 by Govt. of Punjab<br />

has expired, IDBI have indicated that they<br />

will consider revalidation of LOI only after<br />

significant progress has been made by Govt.<br />

of Punjab/PSEB to establish Escrow capacity<br />

of PSEB to support the project.<br />

f) Orders for BTG package placed on M/s<br />

BHEL and for BOP package on M/s Punj<br />

Lloyd Ltd.<br />

g) Financial closure is expected to achieve by<br />

May’10.<br />

h) Civil works of leveling & grading has<br />

commenced.<br />

i) Engineering work in progress for both BTG<br />

package & BOP packages<br />

j) Leveling of land and construction of<br />

boundary wall commenced on 09.06.09<br />

k) Foundation for start of construction activity<br />

laid on 18.10.08.<br />

l) Coal requirement will be met from captive<br />

coal mine in Tokisud North sub block in<br />

Jharkhand. In order to supplement coal<br />

supply to Goindwal Sahib TPP GOI, Min. of<br />

Coal has allotted SEREGARHA coal block<br />

in Jharkhand vide lr.no. 38011/1/2007-CA-1<br />

of 09.01.08. The SEREGARHA coal block<br />

has to be jointly developed by GVK and M/s<br />

ARCELLOR MITTAL.<br />

m) GVK signed coal transport agreement with<br />

Indian railways on 11.12.08.<br />

Final MOU has been signed between M/s<br />

GVK and PSEB on 8.2.2006 for execution of<br />

the project. The validity of MOU has been<br />

extended upto 02.08.09. The amended and<br />

restated PPA signed on 26.05.09 by both<br />

GVK & PSEB after the Appellate<br />

Tribunal permitting on 19.05.09 for<br />

signing the PPA. However, the appeal was<br />

listed for hearing on 18.05.2010<br />

Critical<br />

Areas<br />

i.<br />

Approval<br />

of redrafted<br />

PPA by<br />

PSERC.<br />

ii.<br />

Achieving<br />

of<br />

financial<br />

closure.