Sl.<br />
No.<br />
Project Details<br />
Capacity<br />
(MW)<br />
II PROJECTS UNDER CONSTRUCTION<br />
9 Farakka STPS Stage-III<br />
(Distt Murshidabad, WB) 500<br />
Unit-6<br />
Investment Approval<br />
Sanctioning <strong>Authority</strong><br />
Estimated cost<br />
Exp.during 2005-06<br />
2006-07<br />
2007-08<br />
2008-09<br />
Expenditure (up to 03/10)<br />
Budget Estimate 10-11<br />
Exp. During 10-11<br />
(up to 04/10)<br />
Type of Fuel<br />
Date of Main Plant Order<br />
10 Barh STPP<br />
(Mega Power Project<br />
(Distt.Patna, Bihar)<br />
Unit-1<br />
Unit-2<br />
Unit-3<br />
Date of TEC<br />
Investment Approval<br />
Est. approved cost<br />
(Completed cost)<br />
Latest approved cost.<br />
Exp.during 2005-06<br />
2006-07<br />
2007-08<br />
2008-09<br />
Exp. upto 03/10<br />
Budget Estimate (10-11)<br />
Exp. During 10-11<br />
(up to 04/10)<br />
Type of Fuel<br />
Date of Main Plant Order<br />
500<br />
Commissioning Schedule<br />
Original Actual (A) /As<br />
Syn.<br />
comm<br />
08/10<br />
12/10<br />
: 31.07.2006<br />
: NTPC Board<br />
: Rs 257044 Lakhs<br />
: Rs. 0.0 lakhs<br />
: Rs.14464 lakhs<br />
: Rs.42695 lakhs<br />
: Rs.61675 lakhs<br />
: Rs 171900 Lakhs<br />
: Rs 52700 Lakhs<br />
: Rs 900 Lakhs<br />
now expected<br />
COD Syn.<br />
comm<br />
COD<br />
01/11<br />
: Coal<br />
: 30/10/2006 on M/S BHEL<br />
1980<br />
12/10<br />
02/11<br />
660 03/09 04/13<br />
08/09 07/13<br />
660 01/10 10/13<br />
06/10 01/14<br />
660 11/10 04/14*<br />
04/11 07/14<br />
: 28.9.2001<br />
: 21. 02.2005<br />
: US $ 1070.387 Mn + Rs.411563.2<br />
lakhs<br />
(Exchange rate 1 US$ = Rs.46.50)<br />
= Rs. 909293 lakhs<br />
: Rs 869297 lakhs<br />
: Rs.19575 lakhs<br />
:Rs.54738 lakhs<br />
:Rs.130360 lakhs<br />
:Rs.132139 lakhs<br />
: Rs.466200 lakhs<br />
: Rs. 73200 lakhs.<br />
: Rs 1800 lakhs<br />
: Coal<br />
: SG: 14/03/2005 on M/S<br />
Technopromexport Russia<br />
:TG: 14/03/2005 on M/S<br />
Powermachines, Russia.<br />
03/11<br />
* Based on SG erection start by 10//10 for<br />
Unit-1<br />
- 22 -<br />
Broad Status<br />
a. Environmental clearance accorded on<br />
07/02/2007. MOEF clearance obtained<br />
in 02/2007.<br />
b. Boiler erection started on 30/09/2007.<br />
Boiler drum lifting completed on<br />
04.02.09. Hydraulic test completed in<br />
03/10. BLU expected in 08/10.<br />
c. TG erection started in 02/09. TG box<br />
up completed on 27.02.10.<br />
d. Order for DM Plant placed on M/s<br />
Driplex.<br />
e. AHP: Civil works in progress.<br />
f. Chimney: Shell casting completed. Flue<br />
can erection is in progress.<br />
g. CT: civil works completed.<br />
a) An approx. 1300 acre of land is under<br />
legal possession. Approximately 1372<br />
acres of land has been physically<br />
acquired. Land filling and leveling is<br />
under progress at site.<br />
b) MOE&F clearance has been received<br />
on 03/08/2004<br />
c) Coal linkage is available. However<br />
FSA is under negotiations with<br />
CCL/CIL.<br />
d) Cooling Tower.: Excavation and<br />
concreting are in progress.<br />
e) Chimney. RCC shell concreting of<br />
chimney’s completed. Flue can<br />
erection is in progress.<br />
f) Coal Handling Plant: Excavation,<br />
concreting and erection are in progress.<br />
g) Off site Area Civil Works<br />
Concreting is in progress.<br />
h) Ash Dyke : Stripping, excavation,<br />
earth and embankment filling are in<br />
progress.<br />
Unit-1<br />
a) Boiler erection agency is yet to be<br />
finalized. Condenser parts supplied. TG<br />
deck concreting stage-I completed.<br />
Unit-2<br />
a) Boiler erection expected to start in<br />
10/2010.<br />
b) TG raft completed. Columns up to 12.2<br />
m completed. TG deck concreting state-<br />
I completed. Condenser material<br />
received at site.<br />
Unit – 3<br />
a) Boiler erection started in 1/08 by M/s<br />
NTPC.<br />
b) TG deck concreting state-I completed.<br />
Critical<br />
Areas<br />
Slow pace<br />
of boiler<br />
erection<br />
works by<br />
BHEL.<br />
supply of<br />
balance<br />
NMEJs ,<br />
fuel oil<br />
material,<br />
Balance<br />
Ducting<br />
and P-91<br />
joints<br />
Delay in<br />
Finalization<br />
of boiler<br />
erection<br />
Agency<br />
as TPE<br />
wants<br />
removal<br />
of ceiling<br />
on price<br />
variation<br />
s. MOP<br />
directed<br />
NTPC to<br />
carry on<br />
with the<br />
contract<br />
with<br />
TPE.<br />
Board of<br />
Directors<br />
of NTPC<br />
approved<br />
the<br />
proposal<br />
to go<br />
ahead<br />
with the<br />
contract<br />
with<br />
TPE.<br />
Delay in<br />
Supply of<br />
TG<br />
Embedmen<br />
t by Power<br />
Machines<br />
by M/s<br />
Power<br />
Machine,<br />
Russia.