BROAD STATUS OF THERMAL POWER PROJECTS IN WEST BENGAL<br />
Capacity<br />
(MW)<br />
PROJECTS COMMISSIONED<br />
STATE SECTOR<br />
Santaldih TPP<br />
250<br />
(West Bengal Power<br />
Development Corpn. Ltd.)<br />
Distt.Purulia<br />
Cumulative expenditure (upto<br />
April’08) since inception<br />
Syn.<br />
Commn.<br />
: Rs128400 lakhs<br />
Commissioning Schedule<br />
Original Actual(A)/As<br />
now expected<br />
COD Syn.<br />
Commn .<br />
COD<br />
Unit-5* 250 01/07 04/07 11/07<br />
03/07<br />
(A)<br />
Date of TEC : Not Required<br />
Sanctioning <strong>Authority</strong> : State Govt, West Bengal<br />
Original Cost : Rs. 106170 lakhs<br />
Latest Est. Cost : Rs. 143000 lakhs<br />
Expnd.Upto Mar’07 : Rs.86100 Lakhs<br />
Expenditure During 2007-08<br />
Rs.23000 lakhs.<br />
During 2008-09 (upto 25.07.08) : Rs.3000 Lakhs.<br />
Type of Fuel : Coal<br />
Funding : REC<br />
Date of Main Plant Order :<br />
* Unit slipped from 10 th plan.<br />
27/07/04 (Turnkey) on BHEL<br />
2 Durgapur TPS Extn.<br />
(The Durgapur<br />
Projects Ltd)<br />
Distt. Burdwan<br />
300<br />
Unit-7*<br />
300 01/07 11/07<br />
(A)<br />
Est. Completed Cost : Rs.114133.55 Lakhs<br />
Latest Est. Cost : Rs 135000 Lakhs<br />
Expnd. Upto Mar’06 : Rs.34678 Lakhs<br />
Expenditure during 2006-07 (upto<br />
Mar’07)<br />
: Rs. 64722 lakhs<br />
Expenditure during 2007-08 (upto<br />
Nov,2007)<br />
: Rs. 16000 lakhs<br />
3<br />
Type of Fuel :Coal<br />
Funding :PFC<br />
Date of Main Plant Order<br />
Sagardighi TPP<br />
(West Bengal Power<br />
:27/07/04 on M/s Dong Fang<br />
Electric Corporation, China.<br />
Development Corpn. Ltd.)<br />
Distt. Murshidabad<br />
600<br />
Unit-1*<br />
300 01/07 - 12/07 (A)<br />
Unit-2<br />
300 04/07 - 7/08(A)<br />
Date of TEC : 26.03.03<br />
Sanctioning <strong>Authority</strong> : West Bengal Govt.<br />
Orig. Cost of the Project : Rs. 205710 Lakhs<br />
Latest Est. Cost : Rs.275000 Lakhs<br />
Expnd. Up to March’07 : Rs.170000 Lakhs<br />
Total Expenditure during 2007-08 Rs 45000 lakhs<br />
during 2008-09(upto 25.07.08.) Rs.15000 lakhs.<br />
Type of Fuel :<br />
Funding : Date of<br />
Main Plant Order :<br />
- 103 -<br />
4/09(A)<br />
04/08<br />
(A)<br />
09/08(A)<br />
11/08(A)<br />
Coal<br />
PFC<br />
27.07.04 (Main Plant-Turn Key Package) on<br />
M/s Dong Fang Electric Corporation, China.<br />
Broad Status<br />
a) Unit Synchronised on 7 th Nov’07.<br />
Coal firing achieved on 01.04.2008.<br />
b) Unit declared on COD w.e.f<br />
01.04.09.<br />
Unit Synchronised on 24.11.07 .Coal<br />
firing started on 29.12.07. The full load<br />
achieved in April’08.Unit was declared on<br />
commercial operation w.e.f 30 th April<br />
2008.<br />
Unit-1: Synchronization with oil on 21 st<br />
Dec’07. Coal firing completed on 07.03.08.<br />
Full load achieved on 07.03.2008. COD<br />
achieved w.e.f 01.09.08.<br />
Unit-2:Synchronization completed on<br />
20.07.08. Coal firing completed on<br />
20.07.08. Trial run completed on<br />
18.10.2008. Unit declared on COD w.e.f 4 th<br />
Nov’08.<br />
Critical<br />
Areas