Sl.<br />

No.<br />

1<br />

Project Details<br />

BROAD STATUS OF THERMAL POWER PROJECTS IN WEST BENGAL<br />

Capacity<br />

(MW)<br />

PROJECTS COMMISSIONED<br />

STATE SECTOR<br />

Santaldih TPP<br />

250<br />

(West Bengal Power<br />

Development Corpn. Ltd.)<br />

Distt.Purulia<br />

Cumulative expenditure (upto<br />

April’08) since inception<br />

Syn.<br />

Commn.<br />

: Rs128400 lakhs<br />

Commissioning Schedule<br />

Original Actual(A)/As<br />

now expected<br />

COD Syn.<br />

Commn .<br />

COD<br />

Unit-5* 250 01/07 04/07 11/07<br />

03/07<br />

(A)<br />

Date of TEC : Not Required<br />

Sanctioning <strong>Authority</strong> : State Govt, West Bengal<br />

Original Cost : Rs. 106170 lakhs<br />

Latest Est. Cost : Rs. 143000 lakhs<br />

Expnd.Upto Mar’07 : Rs.86100 Lakhs<br />

Expenditure During 2007-08<br />

Rs.23000 lakhs.<br />

During 2008-09 (upto 25.07.08) : Rs.3000 Lakhs.<br />

Type of Fuel : Coal<br />

Funding : REC<br />

Date of Main Plant Order :<br />

* Unit slipped from 10 th plan.<br />

27/07/04 (Turnkey) on BHEL<br />

2 Durgapur TPS Extn.<br />

(The Durgapur<br />

Projects Ltd)<br />

Distt. Burdwan<br />

300<br />

Unit-7*<br />

300 01/07 11/07<br />

(A)<br />

Est. Completed Cost : Rs.114133.55 Lakhs<br />

Latest Est. Cost : Rs 135000 Lakhs<br />

Expnd. Upto Mar’06 : Rs.34678 Lakhs<br />

Expenditure during 2006-07 (upto<br />

Mar’07)<br />

: Rs. 64722 lakhs<br />

Expenditure during 2007-08 (upto<br />

Nov,2007)<br />

: Rs. 16000 lakhs<br />

3<br />

Type of Fuel :Coal<br />

Funding :PFC<br />

Date of Main Plant Order<br />

Sagardighi TPP<br />

(West Bengal Power<br />

:27/07/04 on M/s Dong Fang<br />

Electric Corporation, China.<br />

Development Corpn. Ltd.)<br />

Distt. Murshidabad<br />

600<br />

Unit-1*<br />

300 01/07 - 12/07 (A)<br />

Unit-2<br />

300 04/07 - 7/08(A)<br />

Date of TEC : 26.03.03<br />

Sanctioning <strong>Authority</strong> : West Bengal Govt.<br />

Orig. Cost of the Project : Rs. 205710 Lakhs<br />

Latest Est. Cost : Rs.275000 Lakhs<br />

Expnd. Up to March’07 : Rs.170000 Lakhs<br />

Total Expenditure during 2007-08 Rs 45000 lakhs<br />

during 2008-09(upto 25.07.08.) Rs.15000 lakhs.<br />

Type of Fuel :<br />

Funding : Date of<br />

Main Plant Order :<br />

- 103 -<br />

4/09(A)<br />

04/08<br />

(A)<br />

09/08(A)<br />

11/08(A)<br />

Coal<br />

PFC<br />

27.07.04 (Main Plant-Turn Key Package) on<br />

M/s Dong Fang Electric Corporation, China.<br />

Broad Status<br />

a) Unit Synchronised on 7 th Nov’07.<br />

Coal firing achieved on 01.04.2008.<br />

b) Unit declared on COD w.e.f<br />

01.04.09.<br />

Unit Synchronised on 24.11.07 .Coal<br />

firing started on 29.12.07. The full load<br />

achieved in April’08.Unit was declared on<br />

commercial operation w.e.f 30 th April<br />

2008.<br />

Unit-1: Synchronization with oil on 21 st<br />

Dec’07. Coal firing completed on 07.03.08.<br />

Full load achieved on 07.03.2008. COD<br />

achieved w.e.f 01.09.08.<br />

Unit-2:Synchronization completed on<br />

20.07.08. Coal firing completed on<br />

20.07.08. Trial run completed on<br />

18.10.2008. Unit declared on COD w.e.f 4 th<br />

Nov’08.<br />

Critical<br />