Sl.<br />

No.<br />

1.<br />

2.<br />

PROJECT DETAILS<br />

PRIVATE SECTOR<br />

Bina TPP<br />

(Dist. Sagar)<br />

Bina Power Supply<br />

Co. Ltd.<br />

Capacity<br />

(MW)<br />

500<br />

Commissioning Schedule<br />

Original Actual(A) / As<br />

Syn.<br />

Comm<br />

now Expected<br />

COD Syn.<br />

Comm<br />

COD<br />

Unit-1 250 06/11 09/11 06/11 09/11<br />

08/11<br />

09/11<br />

Unit-2 250 09/11 12/11 09/11 12/11<br />

11/11<br />

12/11<br />

State Govt. approval : -<br />

Org Est. approved cost : Rs. 275000Lakhs<br />

Latest Cost : Rs. 275000 Lakhs<br />

Exp. 2008-09 : NA<br />

Cumulative Exp.<br />

03/10<br />

: Rs 65300 Lakhs<br />

Exp. 2010-11 (up to 6/10) : Rs 16300 Lakhs<br />

Cumulative Exp<br />

Till 6/10<br />

: Rs. 85600 lakhs<br />

Zero Date 09/2009<br />

Date of Main Plant Order : LOI placed on M/s BHEL on 20.09.08<br />

(BTG).<br />

Mahan TPP<br />

(Dist. Singrauli)<br />

Essar Power MP<br />

Ltd.<br />

1200<br />

Unit-1 600 02/11 05/11 02/11<br />

04/11<br />

04/11<br />

Unit-2 600 05/11 08/11 05/11<br />

07/11<br />

07/11<br />

State Govt. approval : -<br />

Org Est. approved cost : Rs. 486000Lakhs<br />

Latest Cost : Rs. 486000 Lakhs<br />

Cumulative Exp. 6/09 : Rs 74953 Lakhs<br />

05/11<br />

08/11<br />

Exp. 2010-11 (up to 5/10) : NA<br />

Cumulative Exp : NA<br />

Till 5/10<br />

Financial Closure 06/2009<br />

Date of Main Plant Order BTG order placed on M/s Harbin Power<br />

Co. Ltd , China on 24.08.07.<br />

- 71 -<br />

Broad Status<br />

• MOEF clearance obtained.<br />

• Main plant civil works started on<br />

27.11.09 by M/s Jaiprakash<br />

Associates Ltd..<br />

• Chimney and Cooling tower awarded<br />

to M/s Paharpur on 24.07.2009.<br />

• Order for CHP & AHP has been<br />

placed in 11/2009.<br />

• Coal linkage finalised.<br />

• CW system awarded to M/s Kirloskar<br />

in 10/09.<br />

• DM/PT plant awarded to M/s Driplex<br />

in 10/09.<br />

• Switchyard work is under progress<br />

since 10/09.<br />

Unit-1<br />

• Boiler erection started in 07/09.<br />

• Boiler drum lifted on 24.03.10.<br />

• HT is expected by 12/10.<br />

• TG erection is expected to start by<br />

09/10.<br />

• MOEF clearance obtained on 20.4.07.<br />

• Chimney shell completed in 4/10.<br />

Unit-1<br />

• Construction activity started in 1/08<br />

• Boiler erection started in 09/09.<br />

Critical<br />