Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Sl.<br />
No.<br />
1.<br />
2.<br />
PROJECT DETAILS<br />
PRIVATE SECTOR<br />
Bina TPP<br />
(Dist. Sagar)<br />
Bina Power Supply<br />
Co. Ltd.<br />
Capacity<br />
(MW)<br />
500<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
Syn.<br />
Comm<br />
now Expected<br />
COD Syn.<br />
Comm<br />
COD<br />
Unit-1 250 06/11 09/11 06/11 09/11<br />
08/11<br />
09/11<br />
Unit-2 250 09/11 12/11 09/11 12/11<br />
11/11<br />
12/11<br />
State Govt. approval : -<br />
Org Est. approved cost : Rs. 275000Lakhs<br />
Latest Cost : Rs. 275000 Lakhs<br />
Exp. 2008-09 : NA<br />
Cumulative Exp.<br />
03/10<br />
: Rs 65300 Lakhs<br />
Exp. 2010-11 (up to 6/10) : Rs 16300 Lakhs<br />
Cumulative Exp<br />
Till 6/10<br />
: Rs. 85600 lakhs<br />
Zero Date 09/2009<br />
Date of Main Plant Order : LOI placed on M/s BHEL on 20.09.08<br />
(BTG).<br />
Mahan TPP<br />
(Dist. Singrauli)<br />
Essar Power MP<br />
Ltd.<br />
1200<br />
Unit-1 600 02/11 05/11 02/11<br />
04/11<br />
04/11<br />
Unit-2 600 05/11 08/11 05/11<br />
07/11<br />
07/11<br />
State Govt. approval : -<br />
Org Est. approved cost : Rs. 486000Lakhs<br />
Latest Cost : Rs. 486000 Lakhs<br />
Cumulative Exp. 6/09 : Rs 74953 Lakhs<br />
05/11<br />
08/11<br />
Exp. 2010-11 (up to 5/10) : NA<br />
Cumulative Exp : NA<br />
Till 5/10<br />
Financial Closure 06/2009<br />
Date of Main Plant Order BTG order placed on M/s Harbin Power<br />
Co. Ltd , China on 24.08.07.<br />
- 71 -<br />
Broad Status<br />
• MOEF clearance obtained.<br />
• Main plant civil works started on<br />
27.11.09 by M/s Jaiprakash<br />
Associates Ltd..<br />
• Chimney and Cooling tower awarded<br />
to M/s Paharpur on 24.07.2009.<br />
• Order for CHP & AHP has been<br />
placed in 11/2009.<br />
• Coal linkage finalised.<br />
• CW system awarded to M/s Kirloskar<br />
in 10/09.<br />
• DM/PT plant awarded to M/s Driplex<br />
in 10/09.<br />
• Switchyard work is under progress<br />
since 10/09.<br />
Unit-1<br />
• Boiler erection started in 07/09.<br />
• Boiler drum lifted on 24.03.10.<br />
• HT is expected by 12/10.<br />
• TG erection is expected to start by<br />
09/10.<br />
• MOEF clearance obtained on 20.4.07.<br />
• Chimney shell completed in 4/10.<br />
Unit-1<br />
• Construction activity started in 1/08<br />
• Boiler erection started in 09/09.<br />
Critical<br />
Areas