Commissioning Schedule<br />

Sl. No. Project Details Capacity<br />

(MW)<br />

Original Actual (A)<br />

now expected<br />

/As<br />

Syn. COD Syn. COD<br />

comm comm<br />

11 Nabinagar TPP (JV of<br />

NTPC and Indian<br />

Railways) (PO.-<br />

Nabi Nagar<br />

,Distt.:Aurangabad,<br />

Bihar)<br />

U-1 250 12/10 04/11 07/12 10/12<br />

03/11<br />

09/12<br />

U-2 250 04/11 08/11 11/12 02/13<br />

07/11<br />

01/13<br />

U-3 250 08/11 12/11 03/13 06/13<br />

11/11<br />

05/13<br />

U-4 250 12/11 04/12 07/13 10/13<br />

03/12<br />

09/13<br />

Date of Sanction<br />

: -<br />

12<br />

Investment Approval :<br />

Sanctioning <strong>Authority</strong><br />

Orig. Est. Cost Rs.535200 (inclu. Of U-4)<br />

Latest.Est. Cost<br />

Exp.during 2005-06<br />

2006-07<br />

0.0 lakhs<br />

0.0 lakhs<br />

2007-08 25600 lakhs<br />

Cum. Exp. Upto 03/08 Rs.25600 lakhs.<br />

Exp.During 2008-09 Rs.28300 lakhs<br />

(up to 09/08)<br />

Type of fuel : Coal<br />

Funding<br />

Date of Main Plant Order Main Plant order placed on BHEL in Jan.’08.<br />

Barh Super Thermal<br />

Power Plant, Stage-II<br />

NTPC, (Distt. Patna,<br />

Bihar)<br />

2x660<br />

U#1 660 10/12<br />

10/12<br />

U#2 660 08/13<br />

08/13<br />

Date of approval :<br />

Date of Approval by State<br />

Govt.<br />

: N.A.<br />

Org.Est. cost : Rs.734104 lakhs<br />

Latest cost<br />

Exp.during 2007-08<br />

2008-09<br />

: Rs.734104 lakhs<br />

: Rs.6677 lakhs<br />

:Rs.42080 lakhs<br />

Exp. Up to 03/10 : Rs. 96100 lakhs<br />

Budget Estimate (10-11) : Rs.152900 lakhs<br />

Exp. During 10-11<br />

: Rs. 1600 lakhs<br />

(Up to 04/10)<br />

Type of fuel : Coal<br />

Date of Main Plant Order : SG & Aux. on BHEL in 03/08.<br />

: TG & Aux on BHEL in 10/8.<br />

08/12<br />

12/12<br />

06/13<br />

10/13<br />

01/13<br />

11/13<br />

- 23 -<br />

Broad Status<br />

Main Plant order placed on BHEL in Jan’08.<br />

Balance Bandobasti Land (68 Acres)<br />

acquisition to be carried out.<br />

Left Out Land (80 Acres)- Requisition Given.<br />

Sec-4 &6 approval from GoB awaited.<br />

Start of piling works delayed due to<br />

inadequate mobilisation. Test piling started.<br />

Boiler erection expected to start in Oct’10.<br />

Steam generator package awarded in<br />

March,2008 and Steam turbine generator<br />

package awarded in October,2008.<br />

Piling works have commenced in Sept,2008.<br />

Unit-1:<br />

Boiler erection started on 26.08.09 by<br />

BHEL. 3902 MT of boiler material erected<br />

till 05/10. M/s Powermac is boiler erection<br />

agency.<br />

TG: Raft casting completed in Dec,2009.<br />

Unit-2:<br />

Boiler erection started in 02/10. 335 MT of<br />

boiler material erected till 05/10.<br />

CHP: Order placed on M/s TRF.<br />

AHP: Order placed on M/s DCIPS, Kolkata.<br />

CT: Order placed on M/s Paharpur.<br />

Chimney: Order placed on M/s Gammon India<br />

Limited. Raft RCC works in progress.<br />

DM Plant: Order placed on M/s Driplex.<br />

PT Plant: Order placed on M/s Mc Nally<br />

Bharat.<br />

Critical<br />

Areas<br />

Acquisition<br />

of<br />

balance<br />

land<br />

Finalizatio<br />

n of zero<br />

date<br />

Supplies<br />

of U-4<br />

condenser<br />

from<br />

BHEL<br />

Hardwar<br />

to be<br />

expedited.<br />

Earlier<br />

Schedule-<br />

July’10.<br />

Now<br />

expected-<br />

Aug’10.<br />

Supply<br />

of TG<br />

pedestals<br />

for U-4<br />

critical<br />

from<br />

Siemens,<br />

German<br />

y for<br />

commen<br />

cement<br />

of TG<br />

erection.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!