Commissioning Schedule<br />
Sl. No. Project Details Capacity<br />
(MW)<br />
Original Actual (A)<br />
now expected<br />
/As<br />
Syn. COD Syn. COD<br />
comm comm<br />
11 Nabinagar TPP (JV of<br />
NTPC and Indian<br />
Railways) (PO.-<br />
Nabi Nagar<br />
,Distt.:Aurangabad,<br />
Bihar)<br />
U-1 250 12/10 04/11 07/12 10/12<br />
03/11<br />
09/12<br />
U-2 250 04/11 08/11 11/12 02/13<br />
07/11<br />
01/13<br />
U-3 250 08/11 12/11 03/13 06/13<br />
11/11<br />
05/13<br />
U-4 250 12/11 04/12 07/13 10/13<br />
03/12<br />
09/13<br />
Date of Sanction<br />
: -<br />
12<br />
Investment Approval :<br />
Sanctioning <strong>Authority</strong><br />
Orig. Est. Cost Rs.535200 (inclu. Of U-4)<br />
Latest.Est. Cost<br />
Exp.during 2005-06<br />
2006-07<br />
0.0 lakhs<br />
0.0 lakhs<br />
2007-08 25600 lakhs<br />
Cum. Exp. Upto 03/08 Rs.25600 lakhs.<br />
Exp.During 2008-09 Rs.28300 lakhs<br />
(up to 09/08)<br />
Type of fuel : Coal<br />
Funding<br />
Date of Main Plant Order Main Plant order placed on BHEL in Jan.’08.<br />
Barh Super Thermal<br />
Power Plant, Stage-II<br />
NTPC, (Distt. Patna,<br />
Bihar)<br />
2x660<br />
U#1 660 10/12<br />
10/12<br />
U#2 660 08/13<br />
08/13<br />
Date of approval :<br />
Date of Approval by State<br />
Govt.<br />
: N.A.<br />
Org.Est. cost : Rs.734104 lakhs<br />
Latest cost<br />
Exp.during 2007-08<br />
2008-09<br />
: Rs.734104 lakhs<br />
: Rs.6677 lakhs<br />
:Rs.42080 lakhs<br />
Exp. Up to 03/10 : Rs. 96100 lakhs<br />
Budget Estimate (10-11) : Rs.152900 lakhs<br />
Exp. During 10-11<br />
: Rs. 1600 lakhs<br />
(Up to 04/10)<br />
Type of fuel : Coal<br />
Date of Main Plant Order : SG & Aux. on BHEL in 03/08.<br />
: TG & Aux on BHEL in 10/8.<br />
08/12<br />
12/12<br />
06/13<br />
10/13<br />
01/13<br />
11/13<br />
- 23 -<br />
Broad Status<br />
Main Plant order placed on BHEL in Jan’08.<br />
Balance Bandobasti Land (68 Acres)<br />
acquisition to be carried out.<br />
Left Out Land (80 Acres)- Requisition Given.<br />
Sec-4 &6 approval from GoB awaited.<br />
Start of piling works delayed due to<br />
inadequate mobilisation. Test piling started.<br />
Boiler erection expected to start in Oct’10.<br />
Steam generator package awarded in<br />
March,2008 and Steam turbine generator<br />
package awarded in October,2008.<br />
Piling works have commenced in Sept,2008.<br />
Unit-1:<br />
Boiler erection started on 26.08.09 by<br />
BHEL. 3902 MT of boiler material erected<br />
till 05/10. M/s Powermac is boiler erection<br />
agency.<br />
TG: Raft casting completed in Dec,2009.<br />
Unit-2:<br />
Boiler erection started in 02/10. 335 MT of<br />
boiler material erected till 05/10.<br />
CHP: Order placed on M/s TRF.<br />
AHP: Order placed on M/s DCIPS, Kolkata.<br />
CT: Order placed on M/s Paharpur.<br />
Chimney: Order placed on M/s Gammon India<br />
Limited. Raft RCC works in progress.<br />
DM Plant: Order placed on M/s Driplex.<br />
PT Plant: Order placed on M/s Mc Nally<br />
Bharat.<br />
Critical<br />
Areas<br />
Acquisition<br />
of<br />
balance<br />
land<br />
Finalizatio<br />
n of zero<br />
date<br />
Supplies<br />
of U-4<br />
condenser<br />
from<br />
BHEL<br />
Hardwar<br />
to be<br />
expedited.<br />
Earlier<br />
Schedule-<br />
July’10.<br />
Now<br />
expected-<br />
Aug’10.<br />
Supply<br />
of TG<br />
pedestals<br />
for U-4<br />
critical<br />
from<br />
Siemens,<br />
German<br />
y for<br />
commen<br />
cement<br />
of TG<br />
erection.