Sl.<br />

No.<br />

1.<br />

2.<br />

PROJECT DETAILS<br />

Private Sector<br />

Under construction<br />

Mundra TPP, Ph-I<br />

(Distt:Kutch)<br />

M/s Adani Power Ltd.<br />

Unit-3<br />

Capacity<br />

(MW)<br />

660<br />

330<br />

Commissioning Schedule<br />

Original Actual(A) / As<br />

now Expected<br />

Syn. Com Syn. Com.<br />

01/10<br />

Unit-4 330 04/10<br />

04/10<br />

07/10<br />

07/10 09/10<br />

Date of TEC : Not Required<br />

Date of Approval by State Govt. : N.A.<br />

Org.Est. cost : Rs.207000 Lakhs<br />

Exp. upto 03/08<br />

: Rs.35173 lakhs<br />

Exp. During 08-09<br />

( Up to 11/08)<br />

: Rs. 41257Lakhs<br />

Financial Closure : Achieved on 25.07.07<br />

Type of fuel : Imported Coal<br />

Fuel Linkage :Imported coal from Indonesia<br />

Date of Main Plant Order BTG Contract awarded to<br />

(Boiler-Babcock, China) Kowa/SFPML<br />

(TG-BSTG,China)<br />

on 01.03.07<br />

Zero date of the project<br />

: 01.03.07<br />

Power Evacuation System: Progressing as per schedule<br />

Mundra TPP, Ph-II<br />

(Distt:Kutch)<br />

M/s Adani Power Ltd.<br />

Unit-1<br />

1320<br />

660 01/11<br />

Unit-2 660 06/11<br />

03/11 01/11<br />

08/11 06/11<br />

Date of TEC : Not Required<br />

Date of Approval by State Govt. : N.A.<br />

Org.Est. cost : Rs.579600 lakhs<br />

Exp. upto 03/08 : Rs.81286 lakhs<br />

Exp. During 08-09<br />

( Up to 11/08)<br />

: Rs. 72745 Lakhs<br />

Financial Closure : Achieved in 12/07<br />

Type of fuel : Imported Coal<br />

Fuel Linkage : Imported coal from Indonesia<br />

Date of Main Plant Order<br />

(Boiler-Harbin, China)<br />

(TG-Dong Fang)<br />

EPC Contract awarded to<br />

SEPCO III China<br />

on 06.09.07<br />

Zero date of the project : 06.09.07<br />

Power Evacuation System: Progressing as per schedule<br />

- 67 -<br />

08/10<br />

10/10<br />

03/11<br />

08/11<br />

Broad Status<br />

1. Zero date of the project is 01.03.07.<br />

2. The order for all the BOPs have<br />

already been placed and are<br />

progressing as per schedule.<br />

Unit-3<br />

Boiler<br />

1. Boiler erection started on 10.07.08.<br />

2. Drum lifting completed on 16.02.09.<br />

3. Boiler HT completed on 15.05.09.<br />

4. Boiler HT (Non-drainable)<br />

completed on 01.01.10.<br />

5. BLU completed on 01/ 05/10.<br />

6. SBO started on 15.05.10 and<br />

completed on 23.05.10.<br />

TG<br />

1. Condenser erection started in 01/09.<br />

2. TG erection started on 24.05.09.<br />

3. TG Box ed Up on 29.04.10.<br />

Unit-4<br />

Boiler<br />

1. Boiler erection started on 21.11.08.<br />

2. Boiler drum lifting completed on<br />

15.05.09.<br />

3. Boiler HT completed on 11.04.10.<br />

4. BLU is expected in 07/10.<br />

TG<br />

1. Condenser erection started on<br />

30.04.09.<br />

2. TG erection started in 05/09.<br />

3. TG box up is expected in 07/10.<br />

1. All clearances are available.<br />

2. Zero date of the project is 06.09.07.<br />

3. Design & Engineering is in<br />

progress.<br />

4. All the BOPs are included in EPC<br />

contract.<br />

Unit-1<br />

Boiler<br />

1. Boiler erection started on 17.10.08.<br />

2. Boiler HT expected in 05/10.<br />

TG<br />

1. Condenser erection started on<br />

21.09.09.<br />

2. TG box up is expected in 09/10.<br />

Unit-2<br />

Boiler<br />

1. Boiler erection started on 02.12.08.<br />

2. Boiler HT expected in 08/10.<br />

TG<br />

1. Condenser erection started on<br />

01.02.10<br />

2. TG box up is expected in 12/10.<br />

Critical<br />

Areas<br />

Work<br />

progress<br />

is<br />

affected<br />

due to<br />

nonavailabili<br />

ty of<br />

Visa for<br />

Chinese<br />

Experts.<br />

Completi<br />

on of<br />

GETCO’<br />

s<br />

transmiss<br />

ion<br />

system<br />

for the<br />

power<br />

evacuatio<br />

n from<br />

unit-4<br />

Readines<br />

s of<br />

GETCO’<br />

s<br />

transmiss<br />

ion lines.<br />

Work<br />

progress<br />

is<br />

affected<br />

due to<br />

nonavailabili<br />

ty of Visa<br />

for<br />

Chinese<br />

Experts.