Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Sl.<br />
No.<br />
1.<br />
2.<br />
PROJECT DETAILS<br />
Private Sector<br />
Under construction<br />
Mundra TPP, Ph-I<br />
(Distt:Kutch)<br />
M/s Adani Power Ltd.<br />
Unit-3<br />
Capacity<br />
(MW)<br />
660<br />
330<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
now Expected<br />
Syn. Com Syn. Com.<br />
01/10<br />
Unit-4 330 04/10<br />
04/10<br />
07/10<br />
07/10 09/10<br />
Date of TEC : Not Required<br />
Date of Approval by State Govt. : N.A.<br />
Org.Est. cost : Rs.207000 Lakhs<br />
Exp. upto 03/08<br />
: Rs.35173 lakhs<br />
Exp. During 08-09<br />
( Up to 11/08)<br />
: Rs. 41257Lakhs<br />
Financial Closure : Achieved on 25.07.07<br />
Type of fuel : Imported Coal<br />
Fuel Linkage :Imported coal from Indonesia<br />
Date of Main Plant Order BTG Contract awarded to<br />
(Boiler-Babcock, China) Kowa/SFPML<br />
(TG-BSTG,China)<br />
on 01.03.07<br />
Zero date of the project<br />
: 01.03.07<br />
Power Evacuation System: Progressing as per schedule<br />
Mundra TPP, Ph-II<br />
(Distt:Kutch)<br />
M/s Adani Power Ltd.<br />
Unit-1<br />
1320<br />
660 01/11<br />
Unit-2 660 06/11<br />
03/11 01/11<br />
08/11 06/11<br />
Date of TEC : Not Required<br />
Date of Approval by State Govt. : N.A.<br />
Org.Est. cost : Rs.579600 lakhs<br />
Exp. upto 03/08 : Rs.81286 lakhs<br />
Exp. During 08-09<br />
( Up to 11/08)<br />
: Rs. 72745 Lakhs<br />
Financial Closure : Achieved in 12/07<br />
Type of fuel : Imported Coal<br />
Fuel Linkage : Imported coal from Indonesia<br />
Date of Main Plant Order<br />
(Boiler-Harbin, China)<br />
(TG-Dong Fang)<br />
EPC Contract awarded to<br />
SEPCO III China<br />
on 06.09.07<br />
Zero date of the project : 06.09.07<br />
Power Evacuation System: Progressing as per schedule<br />
- 67 -<br />
08/10<br />
10/10<br />
03/11<br />
08/11<br />
Broad Status<br />
1. Zero date of the project is 01.03.07.<br />
2. The order for all the BOPs have<br />
already been placed and are<br />
progressing as per schedule.<br />
Unit-3<br />
Boiler<br />
1. Boiler erection started on 10.07.08.<br />
2. Drum lifting completed on 16.02.09.<br />
3. Boiler HT completed on 15.05.09.<br />
4. Boiler HT (Non-drainable)<br />
completed on 01.01.10.<br />
5. BLU completed on 01/ 05/10.<br />
6. SBO started on 15.05.10 and<br />
completed on 23.05.10.<br />
TG<br />
1. Condenser erection started in 01/09.<br />
2. TG erection started on 24.05.09.<br />
3. TG Box ed Up on 29.04.10.<br />
Unit-4<br />
Boiler<br />
1. Boiler erection started on 21.11.08.<br />
2. Boiler drum lifting completed on<br />
15.05.09.<br />
3. Boiler HT completed on 11.04.10.<br />
4. BLU is expected in 07/10.<br />
TG<br />
1. Condenser erection started on<br />
30.04.09.<br />
2. TG erection started in 05/09.<br />
3. TG box up is expected in 07/10.<br />
1. All clearances are available.<br />
2. Zero date of the project is 06.09.07.<br />
3. Design & Engineering is in<br />
progress.<br />
4. All the BOPs are included in EPC<br />
contract.<br />
Unit-1<br />
Boiler<br />
1. Boiler erection started on 17.10.08.<br />
2. Boiler HT expected in 05/10.<br />
TG<br />
1. Condenser erection started on<br />
21.09.09.<br />
2. TG box up is expected in 09/10.<br />
Unit-2<br />
Boiler<br />
1. Boiler erection started on 02.12.08.<br />
2. Boiler HT expected in 08/10.<br />
TG<br />
1. Condenser erection started on<br />
01.02.10<br />
2. TG box up is expected in 12/10.<br />
Critical<br />
Areas<br />
Work<br />
progress<br />
is<br />
affected<br />
due to<br />
nonavailabili<br />
ty of<br />
Visa for<br />
Chinese<br />
Experts.<br />
Completi<br />
on of<br />
GETCO’<br />
s<br />
transmiss<br />
ion<br />
system<br />
for the<br />
power<br />
evacuatio<br />
n from<br />
unit-4<br />
Readines<br />
s of<br />
GETCO’<br />
s<br />
transmiss<br />
ion lines.<br />
Work<br />
progress<br />
is<br />
affected<br />
due to<br />
nonavailabili<br />
ty of Visa<br />
for<br />
Chinese<br />
Experts.