Sl.<br />

No.<br />

2<br />

Project Details<br />

Tuticorin TPP<br />

TN joint venture with<br />

NLC ( NTPL )<br />

Distt. Tuticorin, TN.<br />

U-1<br />

U-2<br />

Capacity<br />

(MW)<br />

1000<br />

500<br />

500<br />

Commissioning Schedule<br />

Original Actual(A)/ As<br />

now Expected<br />

Syn. COD Syn. COD<br />

01/12<br />

03/12<br />

06/12<br />

08/12<br />

Date of Sanction : 12.05.2008.<br />

Sanctioning <strong>Authority</strong> CCEA<br />

Date of Inv. Approval. 12.05.2008.<br />

Est. cost Rs 490954 Lakh<br />

Latest Est. Cost Rs 490954 Lakh<br />

Exp. during 2007-2008 Rs 827 Lakh<br />

Exp.during 2008-2009 Rs 22042 Lakh<br />

Exp. during 2009-10 Rs 50146 Lakh<br />

Exp. during 2010-11<br />

( upto 04/2010)<br />

Rs 15750 Lakh<br />

Type of fuel<br />

Date of Main Plant<br />

Order<br />

: COAL<br />

Zero Date<br />

: 28.01.2009.<br />

Fuel Linkage<br />

04/12<br />

09/12<br />

01/12<br />

03/12<br />

06/12<br />

08/12<br />

: 28.01.2009 ( BTG) on M/s BHEL.<br />

: Long term coal linkage for 4.624<br />

MTPA of coal is available from<br />

Talcher coal fields.<br />

- 28 -<br />

04/12<br />

09/12<br />

Broad Status<br />

• 108 hectares of Land is available.<br />

• Sea water after treatment.<br />

• MOE&F clearance accorded on<br />

13.06.2007.<br />

• M/s MECON appointed consultant<br />

for the project .<br />

• Funding is arranged with RECL.<br />

• PPA signed with TNEB, ESCOMs<br />

of Karnataka, PED Puducherry and<br />

KSEB.<br />

• CHP order placed on 31.07.09 (M/S<br />

L&T). Piling works started in<br />

Dec’09. 1561 piles completed by<br />

6/10<br />

• AHP order placed 08.04.10 (Energo)<br />

• CW pumps order placed on 31.10.09<br />

(M/s KBL)<br />

• CT order placed on 12.03.10 (M/s<br />

Gammon). Soil investigation I/p<br />

• CW system: Soil investigation is<br />

conducted.<br />

• Order for AHP placed on 08.04.10<br />

(M/s Energo)<br />

• Chimney Order placed on 29.01.10<br />

(M/s Gamon). Soil investigation<br />

completed.<br />

• Order for Boiler placed on 28.01.09<br />

(M/s BHEL). Excavation for boiler<br />

foundations commenced on 06.01.10<br />

• Piling work in ESP area commenced<br />

in 01/10. 1247 piles completed by<br />

6/10<br />

• Order for Switchyard placed on<br />

29.01.10 (M/s L&T).<br />

Critical<br />

Areas