Sl.<br />

No.<br />

1.<br />

Project Details<br />

PRIVATE SECTOR<br />

Lanco Kondapalli<br />

CCPP Expn. St-III<br />

(M/s Lanco<br />

Kondapalli Power<br />

Pvt. Ltd.)<br />

Distt.: Krishna<br />

Module-I(GT&ST)<br />

GT-1<br />

ST-1<br />

Module-II<br />

(GT&ST)<br />

GT-2<br />

ST-2<br />

2x371<br />

241<br />

130<br />

241<br />

130<br />

Origi. Est. Cost :<br />

Latest Est.Cost :<br />

Expediture During 2009-10 :<br />

Financial Closure :<br />

Date of Main Plant Order :<br />

Fuel :<br />

Commissioning Schedule<br />

Cap. Orig. Act.(A)/As Now exp.<br />

(MW) Syn. COD Syn. COD<br />

Com<br />

Com<br />

06/11<br />

06/11<br />

12/1112/11<br />

08/11<br />

08/11<br />

02/12<br />

02/12<br />

Rs 261000 lakhs<br />

Rs 261000 lakhs.<br />

06/11<br />

06/11<br />

12/11<br />

12/11<br />

08/11<br />

08/11<br />

02/12<br />

02/12<br />

Expected by June’10.<br />

(EPC contract on M/s Lanco<br />

Infratech Ltd.) GTG on GE, USA<br />

on 15 th Jan’10.,RSG on Thermax<br />

India Ltd. on 27 th Jan’10 & STG on<br />

M/s Harbin,China on 20 th Jan’10.<br />

Fuel supply is to be allocated from<br />

Reliance KG basin. For transporttation<br />

of gas, pipe line of St-II will<br />

be utilized.<br />

- 92 -<br />

Broad Status<br />

• GTG ordered on GE, USA on 15 th<br />

Jan’10.HRSG ordered on Thermax<br />

India Ltd. on 27 th Jan’10.<br />

• STG ordered on M/s Harbin,China on<br />

20 th Jan’10.<br />

• Notice to proceed to EPC contractor<br />

M/s Lanco Infratech Ltd.has been<br />

issued effecting from 01 st Jan’10.<br />

• Excavation and PCC of Raw water<br />

pump house completed.<br />

• GTG-1&2 inspection completed and<br />

are ready for dispatch.<br />

• Final inspection of GT-1&2 is<br />

scheduled in Aug’10 & Sept’10<br />

respectively.<br />

Module-1:<br />

• GT-1 foundation raft completed.<br />

• HRSG: RCC for rafts completed.<br />

Pedestal work in progress.<br />

• Excavation for inlet duct in progress.<br />

• Main Stack ready for casting raft.<br />

• Excavation for STG foundation in<br />

progress.<br />

• Excavation of Station Transformer<br />

foundation & Raft of Generator<br />

Transformer completed.<br />

Module-II:<br />

• GT foundation: Raft completed.<br />

Pedestals in progress.<br />

• Excavation & raft RCC completed for<br />

Generator transformer foundation.<br />

• Raft for 2 nos footings in STG building<br />

completed.<br />

Critical<br />

Areas<br />

Alloca-tion<br />

& availability<br />

of 3.5<br />

MMSCMD<br />

of Gas<br />

from KG<br />

basin.<br />

Ordering<br />

of all<br />

associate<br />

equip-ment<br />

& BOPs.