Sl.<br />

No.<br />

3.<br />

4.<br />

PROJECT DETAILS<br />

Capacity<br />

(MW)<br />

Chandrapur TPS 1000<br />

Expansion<br />

(Distt.Chandrapur)<br />

MSPGCL<br />

Uni-8 500<br />

Uni-9 500<br />

Commissioning Schedule<br />

Original Actual(A) /<br />

As now<br />

Expected<br />

Syn. Com. Syn. Com.<br />

04/12<br />

07/12<br />

05/12<br />

08/12<br />

Date of TEC : Not Required<br />

Approval by State Govt. :05.03.08<br />

Est.Proj. cost. : Rs. 550000 Lakhs<br />

Exp. During 08-09 : Rs 15870 Lakhs<br />

Exp. During 09-10 (Upto<br />

02/10)<br />

: Rs 59156 Lakhs<br />

Total Exp.(Upto 02/10) : Rs 75026Lakhs<br />

Type of fuel :Coal<br />

04/12<br />

07/12<br />

Fuel Linkage : From Machhakata captive<br />

coal mines Orissa.<br />

Financial closure<br />

Date of Main Plant Order<br />

: M/S BHEL on 25.07.08<br />

(BTG + C&I, Electrical<br />

&Aux.Equip.)<br />

Power Evacuation System: Existing 400kV/220 kV<br />

Chandrapur-II s/s along with switching station.<br />

Koradi TPP 1980<br />

,Expn. Project<br />

(Distt. Nagpur)<br />

MSPGCL<br />

Uni-8 660<br />

Uni-9 660<br />

09/13<br />

03/14<br />

Unit-10 660 09/14<br />

12/13<br />

Date of TEC : Not Required<br />

Date of Approval by State<br />

Govt.<br />

: N.A<br />

Est.Proj. cost. :<br />

Exp. Upto 03/09 : Rs. Lakhs<br />

Cumulative Exp.(Upto 12/09) : Rs Lakhs<br />

Type of fuel :Coal<br />

Fuel Linkage :<br />

Financial closure :<br />

Date of Main Plant<br />

Order(LOA)<br />

Power Evacuation System:<br />

09/13<br />

06/14 03/14<br />

12/14 09/14<br />

: M/S L&T on 23.09.09<br />

(BTG)<br />

05/12<br />

08/12<br />

12/13<br />

06/14<br />

12/14<br />

- 76 -<br />

Broad Status<br />

1. MOE&F clearance received in 01/09.<br />

2. Zero date of the project is 09.02.09<br />

(Zero date shifted due to late release of<br />

initial advance to M/s BHEL).<br />

3. NIT issued for BOP packages on<br />

7.11.08.<br />

4. Order for all the BOPs on EPC basis<br />

placed on M/s BGR , Chennai on<br />

12.06.09. Zero date for BOP package is<br />

10.07.09.<br />

Unit-1<br />

Boiler<br />

1. Boiler foundations handed over to M/s<br />

BHEL on 11.05.10 for starting erection<br />

work.<br />

2. BHEL have already supplied 10609MT<br />

of Boiler material.<br />

3. Boiler erection started on 012.06.10.<br />

4. Drum lifting expected in 10/10.<br />

TG<br />

1. TG erection start is expected in12/10.<br />

1. Zero date of the project is 23.09.09.<br />

2. All required clearances are available.<br />

3. Orders for all BOPs is yet to be placed.<br />

4. Soil investigation is in progress.<br />

Critical<br />

Areas<br />

Delay in<br />

finalisatio<br />

n of BOP<br />

agency.<br />

Release of<br />

drawings<br />

for Boiler<br />

&ESP<br />

foundation<br />

Constructi<br />

on power<br />

supply.<br />

Vacation<br />

of CPRI<br />

premises.