Sl.<br />

No.<br />

BROAD STATUS OF THERMAL POWER PROJECTS IN TAMIL NADU<br />

Project Details<br />

Capacity<br />

(MW)<br />

A PROJECTS INCLUDED IN 11 th PLAN<br />

Commissioning Schedule<br />

Original Actual(A)/ As<br />

now Expected<br />

Syn. COD Syn. COD<br />

Com Comm<br />

- 96 -<br />

Broad Status<br />

I. PROJECTS COMMISSISONED - STATE SECTOR<br />

1. Valuthur GTPP, Phase- 92.2<br />

GT<br />

II TNEB (Distt.<br />

i) Gas turbine synchronized on<br />

Ramanathapuram )<br />

06.05.2008.<br />

GT 59.8 11/07 12/07 05/08(A) 02/09 (A) ii) Full load achieved on 18.05.2008.<br />

ST<br />

Date of TEC<br />

32.4 02/08 03/08 08/08(A) 02/09(A) ST<br />

NA<br />

STG synchronized on 31.08.2008.<br />

Date of Sanction 05.04.2004<br />

Sanctioning <strong>Authority</strong> TNEB<br />

Est. cost Rs.35550 Lakhs<br />

Expd.during 2006-2007 Rs 3550 Lakhs<br />

Trial operation commenced on<br />

01.02.2009 and completed on<br />

16.02.2009.<br />

Expd.during 2007-2008 Rs.20700 Lakhs<br />

Expd.during 2008-2009 Rs 7100 Lakhs<br />

Unit declared on commercial<br />

operation ( COD ) in combined cycle<br />

Comm.Exp.upto 03/09 Rs 31350 Lakhs -<br />

mode wef. 17.02.2009.<br />

Exp. during 2009-10<br />

(upto 11/2009)<br />

Rs. 278 Lakhs<br />

Type of fuel Natural Gas<br />

Date of Main Plant 29.05.2006 ( EPC ) on M/s BGR Energy<br />

Order<br />

Systems.<br />

Critical<br />

Areas