BROAD STATUS OF THERMAL POWER PROJECTS IN TAMIL NADU<br />
Project Details<br />
Capacity<br />
(MW)<br />
A PROJECTS INCLUDED IN 11 th PLAN<br />
Commissioning Schedule<br />
Original Actual(A)/ As<br />
now Expected<br />
Syn. COD Syn. COD<br />
Com Comm<br />
- 96 -<br />
Broad Status<br />
I. PROJECTS COMMISSISONED - STATE SECTOR<br />
1. Valuthur GTPP, Phase- 92.2<br />
GT<br />
II TNEB (Distt.<br />
i) Gas turbine synchronized on<br />
Ramanathapuram )<br />
06.05.2008.<br />
GT 59.8 11/07 12/07 05/08(A) 02/09 (A) ii) Full load achieved on 18.05.2008.<br />
ST<br />
Date of TEC<br />
32.4 02/08 03/08 08/08(A) 02/09(A) ST<br />
NA<br />
STG synchronized on 31.08.2008.<br />
Date of Sanction 05.04.2004<br />
Sanctioning <strong>Authority</strong> TNEB<br />
Est. cost Rs.35550 Lakhs<br />
Expd.during 2006-2007 Rs 3550 Lakhs<br />
Trial operation commenced on<br />
01.02.2009 and completed on<br />
16.02.2009.<br />
Expd.during 2007-2008 Rs.20700 Lakhs<br />
Expd.during 2008-2009 Rs 7100 Lakhs<br />
Unit declared on commercial<br />
operation ( COD ) in combined cycle<br />
Comm.Exp.upto 03/09 Rs 31350 Lakhs -<br />
mode wef. 17.02.2009.<br />
Exp. during 2009-10<br />
(upto 11/2009)<br />
Rs. 278 Lakhs<br />
Type of fuel Natural Gas<br />
Date of Main Plant 29.05.2006 ( EPC ) on M/s BGR Energy<br />
Order<br />
Systems.<br />
Critical<br />
Areas