Sl.<br />

No.<br />

PROJECT DETAILS<br />

BROAD STATUS OF NAMRUP REPLACEMENT POWER PROJECT<br />

Cap<br />

(MW)<br />

Syn.<br />

comm<br />

II PROJECT UNDER CONSTRUCTION<br />

1.<br />

Namrup<br />

Replacement Power<br />

Project<br />

Distt:Dibrugarh<br />

(Assam) APGCL<br />

100<br />

Date of sanction of the project<br />

GT 70 10/2011<br />

01/2012<br />

ST 30 11/2011<br />

01/2012<br />

17.03.2007<br />

Project sanctioning <strong>Authority</strong> Govt of Assam<br />

Date of Investment Approval 17.03.2007<br />

Org. Est. cost Rs 41100 Lakhs<br />

Latest cost Rs 69400 Lakhs<br />

Exp. During 2007-08 Rs 23 Lakhs<br />

Exp. During 2008-09 Rs 1816 Lakhs<br />

Exp. During 2009-10 Rs 1799 Lakhs<br />

Cumulative Expd up to 3/10<br />

Commissioning Schedule<br />

Original Actual(A) / As now<br />

Expected<br />

Rs 3638 Lakhs<br />

COD Syn.<br />

comm<br />

01/2012 01/2012<br />

04/2012<br />

01/2012 02/2012<br />

05/2012<br />

Date of Main Plant Order (LOI) : 09.02.2009 ( EPC ) on M/s BHEL<br />

Zero date of the project : 09.02.2009<br />

Type of fuel Natural Gas<br />

- 107 -<br />

COD<br />

04/2012<br />

05/2012<br />

Fuel Source Gas supply agreement made with Oil<br />

India Limited for 0.66 MMSCMD of<br />

natural gas. Gas Transportation<br />

agreement with Assam Gas Company Ltd.<br />

through existing Gas supply line to NTPS.<br />

Power Evacuation A LILO of about 1 KM will be<br />

constructed to connect with the existing<br />

Namrup – Tinsukia 220 kV D/C line.<br />

Broad Status<br />

- 30 Acres of land required for the<br />

project is available. Store sheds/<br />

Roads/ Township/ Misc building<br />

exists. Const power/ Water /<br />

boundry wall exists.<br />

- Work of total erection,<br />

commissioning, PG Test and all<br />

BOPs (ordering and execution)<br />

has been allotted to M/s NBPPL<br />

(Joint venture of NTPC & BHEL)<br />

on nomination basis with<br />

approval of APGCL.<br />

- NBPPL have awarded the<br />

contract for soil investigation to<br />

M/s CE Testing Co. Pvt. Ltd.<br />

Kolkata. Work commenced on<br />

22.08.2009 and completed on<br />

14.10.2009. Report awaited.<br />

- Main plant civil works started in<br />

4/10.<br />

Critical<br />

Areas