Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Sl.<br />
No.<br />
PROJECT DETAILS<br />
BROAD STATUS OF NAMRUP REPLACEMENT POWER PROJECT<br />
Cap<br />
(MW)<br />
Syn.<br />
comm<br />
II PROJECT UNDER CONSTRUCTION<br />
1.<br />
Namrup<br />
Replacement Power<br />
Project<br />
Distt:Dibrugarh<br />
(Assam) APGCL<br />
100<br />
Date of sanction of the project<br />
GT 70 10/2011<br />
01/2012<br />
ST 30 11/2011<br />
01/2012<br />
17.03.2007<br />
Project sanctioning <strong>Authority</strong> Govt of Assam<br />
Date of Investment Approval 17.03.2007<br />
Org. Est. cost Rs 41100 Lakhs<br />
Latest cost Rs 69400 Lakhs<br />
Exp. During 2007-08 Rs 23 Lakhs<br />
Exp. During 2008-09 Rs 1816 Lakhs<br />
Exp. During 2009-10 Rs 1799 Lakhs<br />
Cumulative Expd up to 3/10<br />
Commissioning Schedule<br />
Original Actual(A) / As now<br />
Expected<br />
Rs 3638 Lakhs<br />
COD Syn.<br />
comm<br />
01/2012 01/2012<br />
04/2012<br />
01/2012 02/2012<br />
05/2012<br />
Date of Main Plant Order (LOI) : 09.02.2009 ( EPC ) on M/s BHEL<br />
Zero date of the project : 09.02.2009<br />
Type of fuel Natural Gas<br />
- 107 -<br />
COD<br />
04/2012<br />
05/2012<br />
Fuel Source Gas supply agreement made with Oil<br />
India Limited for 0.66 MMSCMD of<br />
natural gas. Gas Transportation<br />
agreement with Assam Gas Company Ltd.<br />
through existing Gas supply line to NTPS.<br />
Power Evacuation A LILO of about 1 KM will be<br />
constructed to connect with the existing<br />
Namrup – Tinsukia 220 kV D/C line.<br />
Broad Status<br />
- 30 Acres of land required for the<br />
project is available. Store sheds/<br />
Roads/ Township/ Misc building<br />
exists. Const power/ Water /<br />
boundry wall exists.<br />
- Work of total erection,<br />
commissioning, PG Test and all<br />
BOPs (ordering and execution)<br />
has been allotted to M/s NBPPL<br />
(Joint venture of NTPC & BHEL)<br />
on nomination basis with<br />
approval of APGCL.<br />
- NBPPL have awarded the<br />
contract for soil investigation to<br />
M/s CE Testing Co. Pvt. Ltd.<br />
Kolkata. Work commenced on<br />
22.08.2009 and completed on<br />
14.10.2009. Report awaited.<br />
- Main plant civil works started in<br />
4/10.<br />
Critical<br />
Areas