Sl.<br />

No.<br />

4.<br />

5.<br />

Project Details<br />

Giral Lignite TPS<br />

Stage-II,<br />

RRVUNL<br />

Distt. Barmer<br />

U-2<br />

Capacity<br />

(MW)<br />

125<br />

Commissioning Schedule<br />

Original Actual (A) /As<br />

Syn.<br />

(Com.)<br />

125 6/08<br />

(8/08)<br />

Date of approval by State Govt. 05.01.2006<br />

Original Est. cost Rs. 61800 Lakhs<br />

Latest Est. Cost Rs. 65000 lakhs<br />

now expected<br />

COD Syn.<br />

(Com.)<br />

COD<br />

09/08 12/08(A)<br />

11/09(A)<br />

- 44 -<br />

09/09<br />

Exp. Upto 3/2009 Rs. 70388 Lakhs<br />

Exp. During 2009-10(upto 8/09) Rs. 3094 Lakhs<br />

Type of fuel Lignite<br />

Fuel Linkage<br />

Date of main plant order 30.11.2005 on BHEL (BTG) at Rs.<br />

531.30 Crs.<br />

Power Evacuation system 220 KV Giral TPS- Barmer-<br />

Dhorimanna- Bhinmal S/C, LILO of<br />

Chhabra TPP<br />

RRVUNL (Distt. Baran)<br />

U-1<br />

Mada<br />

500<br />

250<br />

09/08<br />

(11/08)<br />

12/08 4/09(A)<br />

10/09(A)<br />

12/09<br />

U-2<br />

250 12/08 03/09 03/10(A) 06/10<br />

(2/09) 5/10(A)<br />

Date of approval by State Cleared<br />

Original Est. cost Rs. 175000 lakhs<br />

Latest Est. cost Rs. 235000 lakhs<br />

Exp. Upto 3/2009 Rs. 217188 lakhs<br />

Exp.During 2009-10 (upto 08/09) Rs. 14209 Lakhs<br />

Type of fuel Coal<br />

Fuel Linkage 2.31 MTPA from SECL<br />

Date of main plant Order: 03.03. 2006 on BHEL (BTG) at Rs.<br />

780 Crs<br />

Power evacuation system 400KV Dahra-Bhilwara S/C,<br />

Chhabra-Hinduan S/C, Chhabra<br />

Broad Status<br />

a) Unit synchronized on 26.12.08.<br />

b) Lignite firing completed on 10 th Feb’09.<br />

Unit is running at 80-90 MW with 400<br />

PPM. BHEL and RRVUNL gradually<br />

increased a load of 125 M on 28.6.09.<br />

c) To reduce SOx level from 3800 ppm to<br />

300 ppm at full load of 125 MW, efforts<br />

were continued for increasing lime<br />

dosing as per norms fixed by BHEL.<br />

d) Unit achieved full load on 6.11.2009<br />

with 280 ppm Sox level.<br />

a) M/s Tata Consultancy Engineers have been<br />

appointed as Consultant.<br />

b) CHP: Order has been awarded on M/s Techpro<br />

System Ltd., Chennai on 1.11.06.<br />

c) DM Plant: Order has been awarded on M/s<br />

Thermax, Pune on 26.04.07.<br />

d) Cooling Tower: Order has been awarded to M/s<br />

PCT. 8 cells of Induced Draft cooling tower has<br />

been completed.<br />

e) AHP: Bottom ash hopper is in progress. Dry ash<br />

collection system is nearing completion.<br />

Unit-1<br />

a) Unit synchronised on 16.4.09<br />

b) Coal firing completed in Oct’09 and Unit<br />

commissioned on 30 th Oct’09.<br />

Unit-2<br />

a) Boiler erection started on 21.04.07, drum lifted<br />

on 26 th Nov’07, hydraulic test conducted on 21 st<br />

Apr’09 and light up completed on 31 st Dec’09.<br />

b) Unit synchronized on 31.03.2010.<br />

c) Unit comm. on 04.05.10<br />

Critical<br />

Areas<br />

- Lignite<br />

handling<br />

system<br />

- Excessive<br />

emission<br />

of Sox.<br />

Level.<br />

Readiness of<br />

bunker floor<br />

& inter<br />

connection<br />

between<br />

Unit-1&2<br />

Readiness<br />

of bottom<br />

ash hopper.