Project Details<br />
Giral Lignite TPS<br />
Stage-II,<br />
RRVUNL<br />
Distt. Barmer<br />
U-2<br />
Capacity<br />
(MW)<br />
125<br />
Commissioning Schedule<br />
Original Actual (A) /As<br />
Syn.<br />
(Com.)<br />
125 6/08<br />
(8/08)<br />
Date of approval by State Govt. 05.01.2006<br />
Original Est. cost Rs. 61800 Lakhs<br />
Latest Est. Cost Rs. 65000 lakhs<br />
now expected<br />
COD Syn.<br />
(Com.)<br />
COD<br />
09/08 12/08(A)<br />
11/09(A)<br />
- 44 -<br />
09/09<br />
Exp. Upto 3/2009 Rs. 70388 Lakhs<br />
Exp. During 2009-10(upto 8/09) Rs. 3094 Lakhs<br />
Type of fuel Lignite<br />
Fuel Linkage<br />
Date of main plant order 30.11.2005 on BHEL (BTG) at Rs.<br />
531.30 Crs.<br />
Power Evacuation system 220 KV Giral TPS- Barmer-<br />
Dhorimanna- Bhinmal S/C, LILO of<br />
Chhabra TPP<br />
RRVUNL (Distt. Baran)<br />
U-1<br />
Mada<br />
500<br />
250<br />
09/08<br />
(11/08)<br />
12/08 4/09(A)<br />
10/09(A)<br />
12/09<br />
U-2<br />
250 12/08 03/09 03/10(A) 06/10<br />
(2/09) 5/10(A)<br />
Date of approval by State Cleared<br />
Original Est. cost Rs. 175000 lakhs<br />
Latest Est. cost Rs. 235000 lakhs<br />
Exp. Upto 3/2009 Rs. 217188 lakhs<br />
Exp.During 2009-10 (upto 08/09) Rs. 14209 Lakhs<br />
Type of fuel Coal<br />
Fuel Linkage 2.31 MTPA from SECL<br />
Date of main plant Order: 03.03. 2006 on BHEL (BTG) at Rs.<br />
780 Crs<br />
Power evacuation system 400KV Dahra-Bhilwara S/C,<br />
Chhabra-Hinduan S/C, Chhabra<br />
Broad Status<br />
a) Unit synchronized on 26.12.08.<br />
b) Lignite firing completed on 10 th Feb’09.<br />
Unit is running at 80-90 MW with 400<br />
PPM. BHEL and RRVUNL gradually<br />
increased a load of 125 M on 28.6.09.<br />
c) To reduce SOx level from 3800 ppm to<br />
300 ppm at full load of 125 MW, efforts<br />
were continued for increasing lime<br />
dosing as per norms fixed by BHEL.<br />
d) Unit achieved full load on 6.11.2009<br />
with 280 ppm Sox level.<br />
a) M/s Tata Consultancy Engineers have been<br />
appointed as Consultant.<br />
b) CHP: Order has been awarded on M/s Techpro<br />
System Ltd., Chennai on 1.11.06.<br />
c) DM Plant: Order has been awarded on M/s<br />
Thermax, Pune on 26.04.07.<br />
d) Cooling Tower: Order has been awarded to M/s<br />
PCT. 8 cells of Induced Draft cooling tower has<br />
been completed.<br />
e) AHP: Bottom ash hopper is in progress. Dry ash<br />
collection system is nearing completion.<br />
Unit-1<br />
a) Unit synchronised on 16.4.09<br />
b) Coal firing completed in Oct’09 and Unit<br />
commissioned on 30 th Oct’09.<br />
Unit-2<br />
a) Boiler erection started on 21.04.07, drum lifted<br />
on 26 th Nov’07, hydraulic test conducted on 21 st<br />
Apr’09 and light up completed on 31 st Dec’09.<br />
b) Unit synchronized on 31.03.2010.<br />
c) Unit comm. on 04.05.10<br />
Critical<br />
Areas<br />
- Lignite<br />
handling<br />
system<br />
- Excessive<br />
emission<br />
of Sox.<br />
Level.<br />
Readiness of<br />
bunker floor<br />
& inter<br />
connection<br />
between<br />
Unit-1&2<br />
Readiness<br />
of bottom<br />
ash hopper.