Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Sl.<br />
No.<br />
PROJECT DETAILS<br />
Capacity<br />
(MW)<br />
II. PROJECTS UNDER CONSTRUCTION<br />
1.<br />
Mejia TPS Ph-II,<br />
Units-1&2<br />
(Distt. Bankura, West<br />
Bengal)<br />
Unit-1<br />
2x500<br />
500<br />
Commissioning Schedule<br />
Original<br />
Actual(A) / As now<br />
Expected<br />
Syn.<br />
(Comm)<br />
COD<br />
Syn.<br />
(Comm)<br />
COD<br />
10/09<br />
11/09<br />
12/09<br />
Unit-2 500<br />
01/10<br />
03/10<br />
02/10<br />
Investment approval. : 26.8.2006 (DVC Board)<br />
Orig. Est. completed cost : Rs.467689 lakhs<br />
Revised Estimated cost : Rs.528627 lakhs<br />
Exp. During 2006-07 : Rs. 39746.32 lakhs<br />
Cumulative Exp.2006-07 : Rs 39746.32 lakhs<br />
Exp. During 2007-08 : Rs. 66322.00 lakhs<br />
Cumulative Exp. 2007-08 : Rs. 106068.32 lakhs<br />
Exp. in 2008-09 : Rs. 159785.00 lakhs<br />
Cumulative Exp. 2008-09 : Rs 265853.32 lakhs<br />
Exp. in 2009-10 : Rs. 122702.00 lakhs<br />
Cumulative Exp. 2009-10 : Rs 388555.32 lakhs(Mar_10)<br />
Type of fuel: Coal<br />
Date of Main Plant Order: 12/12/06 on M/s BHEL(EPC)<br />
08.01.07 (LOA Date)<br />
12.04/10(A)<br />
0910<br />
10/10<br />
01/11<br />
Power Evacuation System:<br />
a) 400 KV D/C Maithon-Jamshedpur (PG) Line S/C LILO at Mejia –(90 Ckm) to<br />
meet the startup power of MTPS Ph-II.-commissioned on 02/10.<br />
b) 400 KV D/C Mejia-Maithon (PG) Line 114 Ckm for the power evacuation of<br />
MTPS Ph-II.<br />
Fuel Supply Arrangement:<br />
a) Barjora (North) & Khagra-Jaydev for 3 MT each, Coal block was allocated to<br />
DVC with proposed use of MTPS PH-II .<br />
b) Before the development of above blocks, DVC has applied for tapering<br />
linkage@2.5 MTPA to MoC with the recommendation of CEA & MoP.<br />
Project Zero date: 31.12.06<br />
- 31 -<br />
09/10<br />
03/11<br />
Broad Status<br />
• LOA (EPC) was placed on BHEL<br />
on 08.01.07.<br />
Unit-1:<br />
Boiler erection started on 26.09.2007.<br />
Drum lifting was done on 29.03.08.<br />
Boiler hydro test was conducted on<br />
9 th April’09. The BLU was completed<br />
on 31 Dec’09. EDTA completed on<br />
21.02.2010. SBO completed in<br />
Mar’10.<br />
Condenser erection started on<br />
26.09.08. TG erection was started from<br />
01.12.08. Turbine Box Up completed<br />
on 09 th Nov’09.Unit synchronised on<br />
12 th April’10 at 01:30 Hrs. with 35<br />
MW Load and commissioning is<br />
expected in Sept’10.<br />
Unit-2<br />
• Boiler erection started on<br />
30.12.2007. Drum lifting was done<br />
on 08.07.2008. Boiler hydro test<br />
was conducted on 27 th July’09. The<br />
BLU completed on 1 st July’10.<br />
• TG deck casting completed on<br />
08.11.08. Condenser erection<br />
started in 10 th Jan.09. TG box up<br />
expected in 07/10. Unit<br />
synchronisation expected in Oct’10<br />
and commissioning in Jan’10.<br />
Critical<br />
Areas<br />
Unit-1:<br />
Readiness<br />
of CHP<br />
priority<br />
route and<br />
LHS<br />
tripper and<br />
conveyor<br />
etc. by<br />
ELECON.<br />
Unit-2<br />
Delay in<br />
giving<br />
front to<br />
M/s<br />
ELECON<br />
for<br />
structural<br />
erection of<br />
TP-108 by<br />
BHEL<br />
Readiness<br />
of RHS<br />
bunkers,<br />
Mills,<br />
Bunker<br />
Floor by<br />
BHEL.<br />
Commissio<br />
ning of<br />
balance<br />
CW<br />
Pumps.<br />
Slow<br />
progress of<br />
structural<br />
erection of<br />
TP-107 &<br />
Gallery<br />
support by<br />
M/s<br />
ELECON.