Sl.<br />

No.<br />

PROJECT DETAILS<br />

Capacity<br />

(MW)<br />

II. PROJECTS UNDER CONSTRUCTION<br />

1.<br />

Mejia TPS Ph-II,<br />

Units-1&2<br />

(Distt. Bankura, West<br />

Bengal)<br />

Unit-1<br />

2x500<br />

500<br />

Commissioning Schedule<br />

Original<br />

Actual(A) / As now<br />

Expected<br />

Syn.<br />

(Comm)<br />

COD<br />

Syn.<br />

(Comm)<br />

COD<br />

10/09<br />

11/09<br />

12/09<br />

Unit-2 500<br />

01/10<br />

03/10<br />

02/10<br />

Investment approval. : 26.8.2006 (DVC Board)<br />

Orig. Est. completed cost : Rs.467689 lakhs<br />

Revised Estimated cost : Rs.528627 lakhs<br />

Exp. During 2006-07 : Rs. 39746.32 lakhs<br />

Cumulative Exp.2006-07 : Rs 39746.32 lakhs<br />

Exp. During 2007-08 : Rs. 66322.00 lakhs<br />

Cumulative Exp. 2007-08 : Rs. 106068.32 lakhs<br />

Exp. in 2008-09 : Rs. 159785.00 lakhs<br />

Cumulative Exp. 2008-09 : Rs 265853.32 lakhs<br />

Exp. in 2009-10 : Rs. 122702.00 lakhs<br />

Cumulative Exp. 2009-10 : Rs 388555.32 lakhs(Mar_10)<br />

Type of fuel: Coal<br />

Date of Main Plant Order: 12/12/06 on M/s BHEL(EPC)<br />

08.01.07 (LOA Date)<br />

12.04/10(A)<br />

0910<br />

10/10<br />

01/11<br />

Power Evacuation System:<br />

a) 400 KV D/C Maithon-Jamshedpur (PG) Line S/C LILO at Mejia –(90 Ckm) to<br />

meet the startup power of MTPS Ph-II.-commissioned on 02/10.<br />

b) 400 KV D/C Mejia-Maithon (PG) Line 114 Ckm for the power evacuation of<br />

MTPS Ph-II.<br />

Fuel Supply Arrangement:<br />

a) Barjora (North) & Khagra-Jaydev for 3 MT each, Coal block was allocated to<br />

DVC with proposed use of MTPS PH-II .<br />

b) Before the development of above blocks, DVC has applied for tapering<br />

linkage@2.5 MTPA to MoC with the recommendation of CEA & MoP.<br />

Project Zero date: 31.12.06<br />

- 31 -<br />

09/10<br />

03/11<br />

Broad Status<br />

• LOA (EPC) was placed on BHEL<br />

on 08.01.07.<br />

Unit-1:<br />

Boiler erection started on 26.09.2007.<br />

Drum lifting was done on 29.03.08.<br />

Boiler hydro test was conducted on<br />

9 th April’09. The BLU was completed<br />

on 31 Dec’09. EDTA completed on<br />

21.02.2010. SBO completed in<br />

Mar’10.<br />

Condenser erection started on<br />

26.09.08. TG erection was started from<br />

01.12.08. Turbine Box Up completed<br />

on 09 th Nov’09.Unit synchronised on<br />

12 th April’10 at 01:30 Hrs. with 35<br />

MW Load and commissioning is<br />

expected in Sept’10.<br />

Unit-2<br />

• Boiler erection started on<br />

30.12.2007. Drum lifting was done<br />

on 08.07.2008. Boiler hydro test<br />

was conducted on 27 th July’09. The<br />

BLU completed on 1 st July’10.<br />

• TG deck casting completed on<br />

08.11.08. Condenser erection<br />

started in 10 th Jan.09. TG box up<br />

expected in 07/10. Unit<br />

synchronisation expected in Oct’10<br />

and commissioning in Jan’10.<br />

Critical<br />

Areas<br />

Unit-1:<br />

Readiness<br />

of CHP<br />

priority<br />

route and<br />

LHS<br />

tripper and<br />

conveyor<br />

etc. by<br />

ELECON.<br />

Unit-2<br />

Delay in<br />

giving<br />

front to<br />

M/s<br />

ELECON<br />

for<br />

structural<br />

erection of<br />

TP-108 by<br />

BHEL<br />

Readiness<br />

of RHS<br />

bunkers,<br />

Mills,<br />

Bunker<br />

Floor by<br />

BHEL.<br />

Commissio<br />

ning of<br />

balance<br />

CW<br />

Pumps.<br />

Slow<br />

progress of<br />

structural<br />

erection of<br />

TP-107 &<br />

Gallery<br />

support by<br />

M/s<br />

ELECON.