Sl.<br />

No.<br />

3.<br />

Project Details<br />

Capacity<br />

(MW)<br />

Commissioning Schedule<br />

Original Actual (A) / As<br />

Syn.<br />

(Com.)<br />

now Expected<br />

COD Syn.<br />

(Com.)<br />

COD<br />

Anpara ‘C’TPS<br />

UPRVUNL/<br />

Lanco Anpara Power<br />

Ltd.<br />

(Dist: Sonebhadra)<br />

1200<br />

Unit-1<br />

600 11/10 03/11 11/10<br />

(02/11) (01/11)<br />

Unit-2<br />

600 03/11 07/11 03/11<br />

(06/11) (05/11)<br />

Date of TEC Not Required<br />

Date of approval by State Govt. NA<br />

03/1<br />

1<br />

07/1<br />

1<br />

Est. approved cost Rs. 411480 lakhs<br />

Latest Est. Cost Rs. 411480 lakhs<br />

Exp Upto 31.03.2008 Rs. 48900 lakhs.<br />

Exp Upto 31.03.2009 Rs. 84700 lakhs<br />

Exp Upto 31.03.2010 Rs. 162700 lakhs<br />

Total Exp. Upto 31.03.2010 Rs. 296300 lakhs<br />

Total Exp. May, 2010 Rs. 313400 lakhs<br />

Financial Closure Achieved on 24th Nov’07 with<br />

REC.<br />

Type of fuel Coal<br />

Coal Linkage Yet to be finalized with CIL/NCL<br />

Date of main plant order EPC contract on M/s Lanco<br />

Infratech Ltd.(LIL) on<br />

15.11.07.<br />

BTG supply package contract<br />

placed on M/s Dongfang Electric<br />

Co., China in Nov’07.<br />

Zero date 23 rd Nov’07.<br />

Power Evacuation system 400KV & 765 KV Transmission<br />

system<br />

- 52 -<br />

Broad Status<br />

a) Letter of acceptance placed on M/s<br />

Lanco Anpara Power Pvt .Ltd. by<br />

UPRVUNL on 27.09.2006 for<br />

2x500 MW.<br />

b) The project has achieved financial<br />

closure on 24 th Nov’07 with REC.<br />

c) MOE&F clearance obtained on 26.11.07.<br />

d) EPC contract for 2x600 MW was<br />

awarded on 15 th Nov’07 to M/s Lanco<br />

Infratech Ltd.(LIL).<br />

e) Switchyard: Consultancy contracts<br />

awarded on RITES for civil works of<br />

Switchyard and MGR system.<br />

Equipment.<br />

f) 400 kV Switchyard equipment erection<br />

completed. 765 kV Switchyard<br />

foundation & structure & equipment<br />

erection in progress.<br />

g) Chimney: RCC shell casting completed<br />

& Flue can fabrication under progress.<br />

h) CHP: Track hopper RCC work is in<br />

progress. TP# 1& 2 & Crusher house<br />

Structure fabrication & erection is in<br />

progress.<br />

i) MGR civil works under progress<br />

j) AHP: AW and Ash slurry pump house,<br />

RCC work is in progress.<br />

k) ID Cooling Tower: Mechanical rection in<br />

progress.<br />

l) CW Pump house: RCC & CW duct<br />

erection work is in progress.<br />

m) DM plan- 1 st stream commissioned in<br />

04/10<br />

Unit-1<br />

a) Boiler erection started on 20 th Dec.08.<br />

b) Boiler drum lifing completed on<br />

18.08.09.<br />

c) HT completed on 27.03.10<br />

d) Condenser erection started on 30.09.09.<br />

e) TG: Erection started on 15.12.09.<br />

f) Generator Stator placed in position.<br />

Unit-2<br />

a) Boiler erection started on 25.2.09.<br />

b) 5 th tier erection is in progress.<br />

c) Structural steel fabrication started and<br />

150MT is under dispatch.<br />

d) Boiler drum lifting completed on 23 rd<br />

September, 09<br />

e) Condenser erection commenced 28.04.10<br />

TG erection commenced on 27.04.10<br />

Critical<br />

Areas<br />

• Completion<br />

of 765 kV<br />

switchyard<br />

at Unnao<br />

by UPPCL