Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Sl.<br />
No.<br />
2.<br />
PROJECT<br />
DETAILS<br />
Capacity<br />
(MW)<br />
Bhusawal TPS 1000<br />
Expansion Project<br />
(Distt. Jalgaon)<br />
MSPGCL<br />
Uni-4 500<br />
Uni-5 500<br />
Commissioning Schedule<br />
Original Actual(A) /<br />
As<br />
Expected<br />
now<br />
Syn. Com. Syn. Com.<br />
05/10<br />
09/10<br />
09/10 12/10<br />
01/11<br />
Date of TEC : Not Required<br />
Date of Approval by State Govt.<br />
: 12.05.06<br />
Est.Proj. cost. : 412400 Lakhs<br />
Exp. during 2006-07 : Rs. 15800 Lakhs<br />
Exp. during 2007-08 : Rs. 34610 Lakhs<br />
Exp. during 2008-09 : Rs. 114500Lakhs<br />
Exp. during 2009-10 : Rs. 279278 Lakhs<br />
Exp. during 2009-10 (Upto<br />
04/10)<br />
: Rs. - Lakhs<br />
Total Exp.(Upto 03/10) : Rs 444188Lakhs<br />
Type of fuel :Coal<br />
03/11<br />
- 75 -<br />
03/11<br />
06/11<br />
Fuel Linkage :2.4MTPA from MCLcoal mines<br />
at Talcher/IB.<br />
Financial closure : Achieved on 27.07.06<br />
Equity : GO Maharashtra Rs825<br />
crs. Loan : PFC Rs. 3693Crs.<br />
Date of Main Plant Order : M/S BHEL on 23.01.07<br />
(BTG +Electrical)<br />
Power Evacuation System: Existing 400kV/220 kV lines.<br />
Broad Status<br />
1. Zero date of the project is<br />
23.01.07.<br />
2. All required clearances are<br />
available.<br />
3. Financial closure achieved on<br />
27.07.06.<br />
4. Orders for all BOPs on EPC<br />
basis are placed on M/s TPL on<br />
05.11.07.<br />
Unit-4<br />
Boiler<br />
1. Out of total 33200MT of Boiler<br />
& ESP material 30161MT<br />
received at site upto 03/10.<br />
2. Boiler Foundation handed over<br />
on 10.03.08.<br />
3. Boiler erection started on<br />
26.03.08.<br />
4. Boiler Drum lifted on 09.01.09.<br />
5. Boiler HT completed on<br />
31.03.10.<br />
6. BLU expected in 08/10.<br />
TG<br />
1. Condenser erection started on<br />
14.03.09.<br />
2. TG erection started on 30.04.09.<br />
3. TG box up is expected in 09/10.<br />
Unit-5<br />
Boiler<br />
1. Out of total 33200MT of Boiler<br />
& ESP material 26232MT<br />
received at site upto 03/10.<br />
2. Boiler Foundation handed over<br />
on 26.05.08.<br />
3. Boiler erection started on<br />
03.08.08.<br />
4. Boiler drum lifted on 20.04.09.<br />
5. Boiler HT expected in 07/10.<br />
6. BLU expected in 10/10.<br />
TG<br />
1. Condenser erection work is in<br />
progress.<br />
2. TG box up is expected in 12/10.<br />
Critical<br />
Areas<br />
Supply of<br />
LP rotor<br />
is now<br />
expected<br />
by 07/10<br />
from<br />
BHEL.<br />
Supply of<br />
HPT, LP<br />
rotor, IPT,<br />
CC<br />
pumps<br />
&Gen by<br />
BHEL.