Sl.<br />
No<br />
Project Details<br />
Capacity<br />
(MW)<br />
PROJECTS INCLUDED IN 11 TH PLAN<br />
I<br />
PROJECTS UNDER CONSTRUCTION<br />
3<br />
Commissioning Schedule<br />
Original Actual(A)/ As<br />
now Expected<br />
Syn. COD Syn. COD<br />
Barsingsar lignite TPP<br />
(Distt – Bikaner)<br />
250<br />
U-1 125 09/08 12/08 10/09(A) 06/10<br />
11/08 06/10(A)<br />
U-2 125 03/09 06/09 06/10(A) 08/10<br />
05/09 07/10<br />
Date of Sanction 12/04<br />
Sanctioning <strong>Authority</strong> CCEA<br />
Est. Approved Cost: Rs. 111418lakhs<br />
Latest Est.Cost: Rs. 162609 lakhs<br />
Exp.during 2005-06 Rs 9626 lakhs.<br />
Exp.during 2006-07 Rs 19255 lakhs.<br />
Exp.during 2007-08 Rs 44056 lakhs.<br />
Exp.during 2008-09 Rs 42831 lakhs.<br />
Exp.during 2009-10 Rs 25086 lakhs.<br />
Exp.during 2010-11<br />
(upto )<br />
Rs -- lakhs<br />
Type of Fuel Lignite<br />
Fuel linkage 2.10 MTPA from Barsingsar lignite mine<br />
Date of Main Plant Order 29.12.2005 on BHEL<br />
Power Evacuation<br />
- 29 -<br />
Broad Status<br />
M/s Tata Consulting Engineers,<br />
Bangalore, have been selected as the<br />
project consultant.<br />
Unit-1<br />
a) Boiler erection commenced in<br />
March’07.<br />
b) Boiler drum lifted on 21 st Jun’07.<br />
c) Boiler hydro test completed on 11 th<br />
Aug’08.<br />
d) Boiler light-up is completed on 15 th<br />
Sep’09.<br />
e) TG erection commenced in July’08.<br />
f) TG box-up completed on<br />
15.04.09.<br />
g) Unit synchronized on 27 th Oct’09.<br />
h) Lignite firing is completed on<br />
29.12.09 and full load achieved on<br />
28.06.10.<br />
Unit-2<br />
a) Boiler erection commenced in<br />
May’07. 9480 MT boiler &ESP<br />
material erected out of 14555 MT.<br />
b) Boiler drum lifted on 14 th Sept’07.<br />
c) Boiler Hydraulic test completed on<br />
1 st June’09.<br />
d) Boiler light-up completed on<br />
10.02.10.<br />
e) TG box-up completed, oil flushing is<br />
completed. Steam blowing is in<br />
progress.<br />
i) Unit synchronized on 5 th Jun’10.<br />
Critical<br />
Areas