Sl.<br />

No.<br />

1.<br />

BROAD STATUS OF THERMAL POWER PROJECT IN ASSAM<br />

Project Details Capacity Commissioning Schedule<br />

(MW) Original Actual/As<br />

now expected<br />

Syn COD Syn COD<br />

Com Com<br />

PROJECT UNDER CONSTRUCTION<br />

STATE SECTOR<br />

Lakwa Waste<br />

Heat Recovery<br />

Project<br />

(Assam Power<br />

Generating<br />

Company Ltd.)<br />

Distt. : Sibsagar<br />

(Assam)<br />

APGCL<br />

37.2<br />

ST<br />

37.2 04/08<br />

05/08<br />

Date of TEC : 12/99<br />

06/08 04/10<br />

10/10<br />

Date of sanction : 01/2001<br />

Sanctioning <strong>Authority</strong> : State Govt., ASSAM<br />

Orig. Approved cost : R.16110 lakhs<br />

Latest Approved cost Rs. 23640 lakhs (PIB<br />

Approval)<br />

Expd. during 2006-07 : Rs 4209 Lakhs.<br />

Expd. during 2007-08 : Rs. 6801 Lakhs<br />

Expd. during 2008-09 : Rs. 5296 Lakhs<br />

Expd. during 2009-10 : Rs. 3533 Lakhs<br />

Expd. during 2010-11 Nil<br />

(up to 5/10)<br />

Cumulative Expd up to 5/10 : Rs.19839 Lakhs<br />

Funding : Govt.of Assam / PFC<br />

Type of Fuel : Natural Gas<br />

Source of Fuel : : From existing Plant<br />

(Waste Reheat Plant)<br />

- 106 -<br />

10/10<br />

Date of Main Plant Order : 20.03.06 ( EPC contract on<br />

M/s BHEL)<br />

Power Evacuation : Through Existing 132 kV<br />

Lakwa- Dibrugarh Line<br />

Broad Present Status<br />

• Boiler erection team mobilized at site<br />

in Aug’07. Erection of HRSG-1 & 2<br />

commenced on 15 th Nov’08 and 07 th<br />

February’08 respectively.<br />

• Drum lifting for HRSG-I & II<br />

completed in June’09 and Feb 2009<br />

respectively.<br />

• HRSG-III Erection to start by<br />

6/10.and Drum lifting expected in<br />

07/2010.<br />

• Hydro Test of HRSG I &II is<br />

expected in 06 / 10.<br />

• New Sub-contractor of BHEL “ M/s<br />

Raj shekhar Const. Pvt. Ltd started<br />

balance civil work .<br />

• ST<br />

• Condenser placed in position on<br />

07.11.2009.<br />

• ST erection started in 03/10.<br />

Critical<br />

Areas<br />

Lab our<br />

problem.<br />

Readiness<br />

of DM<br />

plant<br />

Slow<br />

progress of<br />

civil works