BROAD STATUS OF THERMAL POWER PROJECT IN ASSAM<br />
Project Details Capacity Commissioning Schedule<br />
(MW) Original Actual/As<br />
now expected<br />
Syn COD Syn COD<br />
Com Com<br />
PROJECT UNDER CONSTRUCTION<br />
STATE SECTOR<br />
Lakwa Waste<br />
Heat Recovery<br />
Project<br />
(Assam Power<br />
Generating<br />
Company Ltd.)<br />
Distt. : Sibsagar<br />
(Assam)<br />
APGCL<br />
37.2<br />
ST<br />
37.2 04/08<br />
05/08<br />
Date of TEC : 12/99<br />
06/08 04/10<br />
10/10<br />
Date of sanction : 01/2001<br />
Sanctioning <strong>Authority</strong> : State Govt., ASSAM<br />
Orig. Approved cost : R.16110 lakhs<br />
Latest Approved cost Rs. 23640 lakhs (PIB<br />
Approval)<br />
Expd. during 2006-07 : Rs 4209 Lakhs.<br />
Expd. during 2007-08 : Rs. 6801 Lakhs<br />
Expd. during 2008-09 : Rs. 5296 Lakhs<br />
Expd. during 2009-10 : Rs. 3533 Lakhs<br />
Expd. during 2010-11 Nil<br />
(up to 5/10)<br />
Cumulative Expd up to 5/10 : Rs.19839 Lakhs<br />
Funding : Govt.of Assam / PFC<br />
Type of Fuel : Natural Gas<br />
Source of Fuel : : From existing Plant<br />
(Waste Reheat Plant)<br />
- 106 -<br />
10/10<br />
Date of Main Plant Order : 20.03.06 ( EPC contract on<br />
M/s BHEL)<br />
Power Evacuation : Through Existing 132 kV<br />
Lakwa- Dibrugarh Line<br />
Broad Present Status<br />
• Boiler erection team mobilized at site<br />
in Aug’07. Erection of HRSG-1 & 2<br />
commenced on 15 th Nov’08 and 07 th<br />
February’08 respectively.<br />
• Drum lifting for HRSG-I & II<br />
completed in June’09 and Feb 2009<br />
respectively.<br />
• HRSG-III Erection to start by<br />
6/10.and Drum lifting expected in<br />
07/2010.<br />
• Hydro Test of HRSG I &II is<br />
expected in 06 / 10.<br />
• New Sub-contractor of BHEL “ M/s<br />
Raj shekhar Const. Pvt. Ltd started<br />
balance civil work .<br />
• ST<br />
• Condenser placed in position on<br />
07.11.2009.<br />
• ST erection started in 03/10.<br />
Critical<br />
Areas<br />
Lab our<br />
problem.<br />
Readiness<br />
of DM<br />
plant<br />
Slow<br />
progress of<br />
civil works