Jun'2010 - Central Electricity Authority

Jun'2010 - Central Electricity Authority

Jun'2010 - Central Electricity Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sl.<br />

No.<br />

3.<br />

4.<br />

PROJECT DETAILS<br />

Bhilai Expn. TPP<br />

(Ms NTPC- SAIL<br />

Power Company Private<br />

Ltd.)<br />

(Distt. Durg,<br />

Chhattisgarh)<br />

Cap<br />

(MW)<br />

500<br />

Commissioning Schedule<br />

Original Actual(A) / As<br />

Syn.<br />

(com.)<br />

now Expected<br />

COD Syn.<br />

(com)<br />

COD<br />

Unit-1 250 02/08 04/08 04/08(A) 04/09(A)<br />

Unit-2 250 08/08 11/08 03/09(A) 10/09(A)<br />

Date of TEC : Not Required<br />

Investment Approval<br />

: 03/2005<br />

Est.Proj. cost. : Rs. 248249lakhs<br />

Latest Cost : Rs. 269050 Lakhs<br />

Exp. Upto 03/08 : Rs 170520 Lakhs<br />

Exp.during 2008-09 : Rs.35980 Lakhs<br />

(Upto 09/08)<br />

Type of fuel : Coal<br />

Fuel Linkage :2.5 MPTA from SECL CHHAL and<br />

BARUD coal blocks<br />

Date of Main Plant Order : M/S BHEL on Turnkey basis on<br />

31.3.2005 (Excluding CHP, Make up<br />

water, Ash Dyke, Switchyard &Associated<br />

Transmission System &MGR)<br />

Power Evacuation System: Already commissioned.<br />

Kahalgaon STPS St.II<br />

Phase-I<br />

(Mega Power Project)<br />

(Distt.Bhagalpur, Bihar)<br />

Unit-5<br />

Unit-6<br />

Date of TEC<br />

Investment Approval<br />

Sanctioning <strong>Authority</strong><br />

Est Present day cost. (TEC)<br />

(For U-5&6)<br />

Org. approved cost by NTPC<br />

Board(For U-5&6)<br />

Org. approved cost by NTPC<br />

Board<br />

Exp during 2006-07<br />

2007-08<br />

2008-09<br />

Exp. Up to 03/09<br />

Budget Estimate (09-10)<br />

Exp. During 09-10<br />

( up to 04/ 09)<br />

Type of Fuel<br />

Date of Main Plant Order<br />

1000<br />

500 11/06 03/07(A)<br />

500 05/07 03/08(A)<br />

: 13.06.2003<br />

: 2/7/2003<br />

: NTPC Board<br />

: US $ 373.548 M + Rs. 211857.7 lakhs<br />

(Exchange rate 1 US$=Rs.48.50)<br />

= Rs.393028.5 lakhs<br />

: Rs. 400227 Lakhs<br />

: Rs. 586838 Lakhs (incl. Unit-7)<br />

:Rs 135082 lakhs (incl U-7)<br />

:Rs 62831 lakhs (incl U-7)<br />

:Rs 61813 lakhs (incl U-7)<br />

: Rs. 480642 Lakhs (incl. Unit-7)<br />

: Rs. 37787 lakhs. (incl. Unit-7)<br />

: Rs 2147 Lakhs (incl. Unit-7)<br />

: Coal<br />

: SG: 18.7.03 on BHEL<br />

TG: 07.08.03<br />

08/08(A)<br />

12/08(A)<br />

- 14 -<br />

Broad Status<br />

Unit-1<br />

Synchronized on 20.04.08.Coal Firing<br />

achieved on 05.01.09. Full load achieved on<br />

18.01.09. Unit was resynchronized. The unit<br />

ran on full load from 12.03.09 to 15.03.09.<br />

COD declared w.e.f.21.04.09.<br />

Unit-2<br />

Synchronized on 28.03.09.Coal Firing<br />

achieved on 28.03.09. Full load achieved on<br />

12.07.09. COD achieved on 21.10.09.<br />

a) TEC accorded by CEA on 13.6.03 for<br />

revised capacity of 2x500 MW under St.II<br />

Ph.-I. Kahalgaon STPP St.-II was earlier<br />

accorded TEC on 23.11.2001 for capacity<br />

of 2x660 MW. Investment approval<br />

accorded by NTPC Board on2/7/2003.<br />

b) Order for boilers was placed on 18.7.03<br />

and that for TGs on 7.8.03 on BHEL.<br />

Unit-5<br />

Unit synchronized on 31. 03 . 07.<br />

Coal firing completed on 02.02.08<br />

Full load achieved on 14.07.08<br />

and declared w.e.f 1 st Aug.’08.<br />

Unit-6:<br />

Unit synchronized on 16.03.08. Coal<br />

Firing completed on 03.11.08. Unit has<br />

achieved full load on 15.12.08. Unit<br />

declared on COD w.e.f 30.12.08.<br />

Critical<br />

Areas<br />

Tie up<br />

for<br />

Balance<br />

50%<br />

coal<br />

require<br />

ment.