Sl.<br />
No.<br />
3.<br />
4.<br />
PROJECT DETAILS<br />
Bhilai Expn. TPP<br />
(Ms NTPC- SAIL<br />
Power Company Private<br />
Ltd.)<br />
(Distt. Durg,<br />
Chhattisgarh)<br />
Cap<br />
(MW)<br />
500<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
Syn.<br />
(com.)<br />
now Expected<br />
COD Syn.<br />
(com)<br />
COD<br />
Unit-1 250 02/08 04/08 04/08(A) 04/09(A)<br />
Unit-2 250 08/08 11/08 03/09(A) 10/09(A)<br />
Date of TEC : Not Required<br />
Investment Approval<br />
: 03/2005<br />
Est.Proj. cost. : Rs. 248249lakhs<br />
Latest Cost : Rs. 269050 Lakhs<br />
Exp. Upto 03/08 : Rs 170520 Lakhs<br />
Exp.during 2008-09 : Rs.35980 Lakhs<br />
(Upto 09/08)<br />
Type of fuel : Coal<br />
Fuel Linkage :2.5 MPTA from SECL CHHAL and<br />
BARUD coal blocks<br />
Date of Main Plant Order : M/S BHEL on Turnkey basis on<br />
31.3.2005 (Excluding CHP, Make up<br />
water, Ash Dyke, Switchyard &Associated<br />
Transmission System &MGR)<br />
Power Evacuation System: Already commissioned.<br />
Kahalgaon STPS St.II<br />
Phase-I<br />
(Mega Power Project)<br />
(Distt.Bhagalpur, Bihar)<br />
Unit-5<br />
Unit-6<br />
Date of TEC<br />
Investment Approval<br />
Sanctioning <strong>Authority</strong><br />
Est Present day cost. (TEC)<br />
(For U-5&6)<br />
Org. approved cost by NTPC<br />
Board(For U-5&6)<br />
Org. approved cost by NTPC<br />
Board<br />
Exp during 2006-07<br />
2007-08<br />
2008-09<br />
Exp. Up to 03/09<br />
Budget Estimate (09-10)<br />
Exp. During 09-10<br />
( up to 04/ 09)<br />
Type of Fuel<br />
Date of Main Plant Order<br />
1000<br />
500 11/06 03/07(A)<br />
500 05/07 03/08(A)<br />
: 13.06.2003<br />
: 2/7/2003<br />
: NTPC Board<br />
: US $ 373.548 M + Rs. 211857.7 lakhs<br />
(Exchange rate 1 US$=Rs.48.50)<br />
= Rs.393028.5 lakhs<br />
: Rs. 400227 Lakhs<br />
: Rs. 586838 Lakhs (incl. Unit-7)<br />
:Rs 135082 lakhs (incl U-7)<br />
:Rs 62831 lakhs (incl U-7)<br />
:Rs 61813 lakhs (incl U-7)<br />
: Rs. 480642 Lakhs (incl. Unit-7)<br />
: Rs. 37787 lakhs. (incl. Unit-7)<br />
: Rs 2147 Lakhs (incl. Unit-7)<br />
: Coal<br />
: SG: 18.7.03 on BHEL<br />
TG: 07.08.03<br />
08/08(A)<br />
12/08(A)<br />
- 14 -<br />
Broad Status<br />
Unit-1<br />
Synchronized on 20.04.08.Coal Firing<br />
achieved on 05.01.09. Full load achieved on<br />
18.01.09. Unit was resynchronized. The unit<br />
ran on full load from 12.03.09 to 15.03.09.<br />
COD declared w.e.f.21.04.09.<br />
Unit-2<br />
Synchronized on 28.03.09.Coal Firing<br />
achieved on 28.03.09. Full load achieved on<br />
12.07.09. COD achieved on 21.10.09.<br />
a) TEC accorded by CEA on 13.6.03 for<br />
revised capacity of 2x500 MW under St.II<br />
Ph.-I. Kahalgaon STPP St.-II was earlier<br />
accorded TEC on 23.11.2001 for capacity<br />
of 2x660 MW. Investment approval<br />
accorded by NTPC Board on2/7/2003.<br />
b) Order for boilers was placed on 18.7.03<br />
and that for TGs on 7.8.03 on BHEL.<br />
Unit-5<br />
Unit synchronized on 31. 03 . 07.<br />
Coal firing completed on 02.02.08<br />
Full load achieved on 14.07.08<br />
and declared w.e.f 1 st Aug.’08.<br />
Unit-6:<br />
Unit synchronized on 16.03.08. Coal<br />
Firing completed on 03.11.08. Unit has<br />
achieved full load on 15.12.08. Unit<br />
declared on COD w.e.f 30.12.08.<br />
Critical<br />
Areas<br />
Tie up<br />
for<br />
Balance<br />
50%<br />
coal<br />
require<br />
ment.