PROJECT DETAILS<br />

Paras TPS Expansion<br />

(Distt. Akola)<br />

MSPGCL<br />

Uni-2<br />

Capacity<br />

(MW)<br />

250<br />

250<br />

Commissioning Schedule<br />

Original Actual(A) / As<br />

Syn.<br />

(com.)<br />

now Expected<br />

COD Syn.<br />

(com.)<br />

COD<br />

06/09 10/09 11/09(A)<br />

(09/09) 03/10(A)<br />

Date of TEC<br />

: Not Required<br />

Date of Approval by State<br />

Govt.<br />

: 12.05.06<br />

Est.Proj. cost. : 122400 Lakhs<br />

Exp. During 2006-07 : Rs.13670Lakhs<br />

Exp. during 2007-08 : Rs.30670 Lakhs<br />

Exp. during 2008-09 : Rs.54650 Lakhs<br />

Exp. during 2009-10 (Upto<br />

02/10)<br />

: Rs.20069 Lakhs<br />

Total Exp. (Upto 02/10) : Rs. 119059Lakhs<br />

Type of fuel : Coal<br />

- 73 -<br />

07/10<br />

Fuel Linkage : 2.4Million metric tones/ annum<br />

from WCL coal mines at Waghoda<br />

& Durgapur.<br />

Financial closure : Achieved in 3/06<br />

Equity: GO Maharashtra Rs245<br />

crs.<br />

Loan : PFC Rs. 888Crs.<br />

Date of Main Plant Order : M/S BHEL on 31.08.06<br />

(BTG +Electrical)<br />

Power Evacuation System: Existing 400kV line.<br />

New Parli TPP<br />

(Distt. Beed)<br />

MSPGCL<br />

250<br />

Uni-2 250 02/09<br />

03/09<br />

Date of TEC : Not Required<br />

Date of Approval by State<br />

Govt.<br />

: 12.05.06<br />

Est.Proj. cost. : 109100 Lakhs<br />

Exp. During 06-07 : Rs.11670 Lakhs<br />

Exp. During 07-08 : Rs.29480 Lakhs<br />

Exp. During 08-09 :Rs.49100 Lakhs<br />

Exp. During 09-10<br />

(Upto 02/10)<br />

Cumulative Exp.<br />

( Up to 02/10)<br />

Type of fuel :Coal<br />

:Rs.13990 Lakhs<br />

:Rs. 104240 Lakhs<br />

05/09 11/09(A) 07/10<br />

02/10(A)<br />

Financial closure : Achieved on 03.01.06<br />

Equity : GO Maharashtra Rs218<br />

Crs.Loan : PFC Rs. 830Crs.<br />

Zero date : 31.08.06<br />

Date of Main Plant Order<br />

: M/S BHEL on 31.08.06<br />

(BTG +Electrical)<br />

Unit-2<br />

Broad Status<br />

Oil synch. achieved on<br />

30.11.09.Coal firing achieved on<br />

18.02.10.Full load achieved on<br />

27.03.10.<br />

Unit-2<br />

Syn. Achieved on 12.11.09.Coal<br />

firing completed on 02.01.10.Unitcommissioned<br />

on 10.02.10.<br />

Critical<br />

Areas