Sl.<br />

No.<br />

1.<br />

PROJECT<br />

DETAILS<br />

State Sector<br />

Under construction<br />

Hazira CCPP<br />

(Gujarat State<br />

Energy Generation<br />

Limited), Surat<br />

Cap<br />

(MW)<br />

350<br />

Commissioning Schedule<br />

Original Actual(A) / As<br />

now Expected<br />

Syn. Comm Syn) Comm<br />

GT 222 02/10 02/10 02/11 02/11<br />

ST 128 03/10 04/10 02/11 03/11<br />

Org.Est. cost Rs. 115200 Lakhs<br />

Latest cost Rs. 115200 Lakhs<br />

Exp. Upto 03/09 Rs. 35000 Lakhs<br />

Exp. During 09-10 Rs. 20000 Lakhs<br />

Exp. During 10-11<br />

(Upto 04/10<br />

Rs. - Lakhs<br />

Cumm. Exp up to 03/10 : Rs. 55000 Lakhs<br />

Financial closure Achieved on 27.12.07<br />

Type of fuel : Natural Gas<br />

FSA : FSA signed with GSPC<br />

Date of Main Plant Order : 29.12.07 on M/s BHEL (EPC)<br />

Zero date of the project<br />

through ICB route.<br />

: 23.01.08<br />

Power Evacuation System: Existing system sufficient.<br />

- 64 -<br />

Broad Status<br />

1. All statutory clearances are<br />

available.<br />

2. Zero date of the project is<br />

23.01.08.<br />

3. Foundation work in HRSG,<br />

HRSG Stack, STG and GTG<br />

completed.<br />

4. GT/ST building foundation work<br />

is completed. GT/ST building is<br />

in progress.<br />

5. HRSG erection started on<br />

15.04.09. IP&LP drum lifted on<br />

09.11.09 & 16.11.09<br />

respectively. HP drum lifting<br />

completed in 03/10.<br />

6. Cooling tower piling work<br />

completed and foundation RCC<br />

work is in progress.<br />

7. Flange to flange gas turbine has<br />

reached at site from GE USA.<br />

GTG supply from Haridwar now<br />

completed. GT erection started<br />

on 31.03.10.GT FSNL is<br />

expected in 01/11.<br />

8. Steam Turbine is on critical path<br />

& expected to reach at site by<br />

07/10. ST erection start is<br />

expected by 08/10. STG Box up<br />

is expected in 01/11.<br />

9. There is no provision of by pass<br />

stack hence GT can not run in<br />

open cycle.<br />

10. Commissioning in combined<br />

cycle is expected in 02/11.<br />

Critical<br />

Areas<br />

(1)<br />

Steam<br />

Turbine<br />

delivery<br />

is on<br />

critical<br />

path and<br />

BHEL<br />

need to<br />

ensure<br />

timely<br />

delivery.<br />

(2)<br />

Engineer<br />

ing<br />

progress<br />

is not up<br />

to mark<br />

and civil<br />

drawings<br />

need to<br />

be<br />

cleared<br />

quickly<br />

for<br />

making<br />

front<br />

available<br />

at site<br />

(3)<br />

BHEL<br />

site staff<br />

need be<br />

augment<br />

ed with<br />

senior