Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Sl.<br />
No.<br />
1.<br />
PROJECT<br />
DETAILS<br />
State Sector<br />
Under construction<br />
Hazira CCPP<br />
(Gujarat State<br />
Energy Generation<br />
Limited), Surat<br />
Cap<br />
(MW)<br />
350<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
now Expected<br />
Syn. Comm Syn) Comm<br />
GT 222 02/10 02/10 02/11 02/11<br />
ST 128 03/10 04/10 02/11 03/11<br />
Org.Est. cost Rs. 115200 Lakhs<br />
Latest cost Rs. 115200 Lakhs<br />
Exp. Upto 03/09 Rs. 35000 Lakhs<br />
Exp. During 09-10 Rs. 20000 Lakhs<br />
Exp. During 10-11<br />
(Upto 04/10<br />
Rs. - Lakhs<br />
Cumm. Exp up to 03/10 : Rs. 55000 Lakhs<br />
Financial closure Achieved on 27.12.07<br />
Type of fuel : Natural Gas<br />
FSA : FSA signed with GSPC<br />
Date of Main Plant Order : 29.12.07 on M/s BHEL (EPC)<br />
Zero date of the project<br />
through ICB route.<br />
: 23.01.08<br />
Power Evacuation System: Existing system sufficient.<br />
- 64 -<br />
Broad Status<br />
1. All statutory clearances are<br />
available.<br />
2. Zero date of the project is<br />
23.01.08.<br />
3. Foundation work in HRSG,<br />
HRSG Stack, STG and GTG<br />
completed.<br />
4. GT/ST building foundation work<br />
is completed. GT/ST building is<br />
in progress.<br />
5. HRSG erection started on<br />
15.04.09. IP&LP drum lifted on<br />
09.11.09 & 16.11.09<br />
respectively. HP drum lifting<br />
completed in 03/10.<br />
6. Cooling tower piling work<br />
completed and foundation RCC<br />
work is in progress.<br />
7. Flange to flange gas turbine has<br />
reached at site from GE USA.<br />
GTG supply from Haridwar now<br />
completed. GT erection started<br />
on 31.03.10.GT FSNL is<br />
expected in 01/11.<br />
8. Steam Turbine is on critical path<br />
& expected to reach at site by<br />
07/10. ST erection start is<br />
expected by 08/10. STG Box up<br />
is expected in 01/11.<br />
9. There is no provision of by pass<br />
stack hence GT can not run in<br />
open cycle.<br />
10. Commissioning in combined<br />
cycle is expected in 02/11.<br />
Critical<br />
Areas<br />
(1)<br />
Steam<br />
Turbine<br />
delivery<br />
is on<br />
critical<br />
path and<br />
BHEL<br />
need to<br />
ensure<br />
timely<br />
delivery.<br />
(2)<br />
Engineer<br />
ing<br />
progress<br />
is not up<br />
to mark<br />
and civil<br />
drawings<br />
need to<br />
be<br />
cleared<br />
quickly<br />
for<br />
making<br />
front<br />
available<br />
at site<br />
(3)<br />
BHEL<br />
site staff<br />
need be<br />
augment<br />
ed with<br />
senior