PROJECT DETAILS<br />
Capacity<br />
(MW)<br />
Surat Lignite TPP Exp.<br />
Ph.II (Mangrol)<br />
(Distt. Surat)<br />
GIPCL<br />
250<br />
Uni-3 125 09/08<br />
Unit-4 125 01/09<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
now Expected<br />
Syn. Com. Syn. com.<br />
12/08 11/09(A)<br />
03/09 03/10(A)<br />
Date of TEC : Not Required<br />
Est. cost : Rs145585 Lakhs.<br />
Exp. Upto 03/09 : Rs. 118077Lakhs<br />
Exp. During 09-10<br />
: Rs 21186Lakhs<br />
(Upto 03/10)<br />
Type of fuel : Lignite<br />
Fuel Linkage : GIPCL own Captive Mines<br />
Financial Closure : Achieved on 24.11.06<br />
Date of Main Plant Order 31.3.06 on M/s BHEL (EPC)<br />
Power Evacuation System: Evacuating in the existing lines.<br />
UtranCCPP<br />
Distt. Surat<br />
GSECL<br />
GT<br />
374.571<br />
240<br />
06/09<br />
ST 134 08/09<br />
06/09<br />
08/09<br />
Org.Estd.Cost : Rs. 121,500Lakhs<br />
Latest cost : Rs. 126300 Lakhs<br />
Exp. During 07-08 Rs 29573.56 Lakhs<br />
Exp. During 08-09 Rs 72184.88 Lakhs<br />
Exp During 09-10<br />
(Upto12/09)<br />
Rs 23987.30 Lakhs<br />
Cumulative Exp. Rs.125745.74Crores<br />
(Upto 12/09)<br />
10.07.09(A)<br />
10.10.09(A)<br />
- 62 -<br />
12.04.10<br />
(A)<br />
04/10(A)<br />
08/09(A)<br />
10/09(A)<br />
Financial closure : 11.05.07<br />
Type of fuel : Natural Gas (base fuel)/LNG<br />
Source of Fuel : Gas Supply agreement with GSPC<br />
through pipeline<br />
Date of Main Plant Order : 27.4.07 on M/s Alstom (Switzerland)<br />
Ltd., through ICB route.<br />
Zero date of the project : 25.05.07<br />
Power Evacuation : Through existing<br />
1. 220 kV Utran-Kim line and<br />
2. 66 k V Utran- Surat line<br />
Broad Status<br />
Unit-3<br />
Oil synchn. achieved on<br />
29.11.09.Lignite firing achieved on<br />
29.11.09.Full load achieved on<br />
12.04.10.<br />
Unit-4<br />
Oil synchn. achieved on<br />
25.03.10.Lignite firing achieved on<br />
25.03.10.Full load achieved on<br />
23.04.10.<br />
Both the units declared COD in<br />
05/10.<br />
GT: Gas turbine first firing done on<br />
29.06.09.GT synchronized in<br />
open cycle on 10.07.09. Full load<br />
on GT was taken on 07.08.09.<br />
ST:<br />
synchronization achieved on<br />
10.10.09.CCPP base load achieved<br />
on 10.10.09.<br />
Critical<br />
Areas