BROAD STATUS OF THERMAL POWER PROJECTS IN DELHI<br />

Commissioning Schedule<br />

Sl.<br />

No.<br />

Project Details Capacity<br />

(MW)<br />

Original Actual(A) / As<br />

now Expected<br />

Broad Status<br />

Syn. COD Syn. COD<br />

(Com.) (Com.)<br />

I. PROJECTS UNDER CONSTRUCTION<br />

STATE SECTOR<br />

1. Pragati III Power 1500<br />

a) LOI issued to BHEL on<br />

Project, Bawana<br />

30.4.08.<br />

Pragati Power Corp.<br />

b) Contract signed on<br />

Ltd.,GENCO, (Delhi)<br />

30.5.08.<br />

Block-I GT-1<br />

03/10<br />

08/10<br />

c) Advance issued on<br />

(3/10)<br />

(8/10)<br />

13.6.08.<br />

GT-2 3x250 750 05/10<br />

(5/10)<br />

09/10<br />

(10/10) 02/11<br />

d) Laying work of gas pipe<br />

line from GAIL is in<br />

progress.<br />

e) Order for civil works has<br />

ST<br />

07/10<br />

02/11<br />

been awarded to M/s Era<br />

(7/10) (02/11)<br />

on 22.10.08.<br />

f) Civil works of raw water<br />

Block-II GT-1<br />

07/10<br />

10/10<br />

reservoir and CW pump<br />

(7/10) (10/10)<br />

house are in progress.<br />

g) GT-1&2 and HRSG<br />

GT-2 3x250 750 09/10<br />

(09/10)<br />

02/11<br />

(02/11) 04/11<br />

foundations<br />

completed.<br />

have been<br />

ST<br />

11/10<br />

04/11<br />

i) GT#1,Gt#2 & GT#3 placed<br />

on foundation<br />

(11/10) (04/11)<br />

Sanctioning <strong>Authority</strong> : Govt. of National Territory of Delhi<br />

Est. approved cost : Rs. 519581 lakhs<br />

Exp. during 2008-09 : Rs. 45238 lakhs<br />

Exp. during 2009-10 : Rs. 4938 lakhs(4/09)<br />

Total Expenditure : 1900 Crores (30/04/10)<br />

Type of fuel : Natural Gas<br />

Gas turbine : GE (9FE)<br />

Fuel Linkage : Gas has been ties up with GAIL, IOC & BPCL<br />

For 2 mmscms by each company .<br />

Date of Main Plant : M/s BHEL (30.5.2008) (Rs.349999 lakhs)<br />

Order (Turn-key)<br />

Power Evacuation System : At 400 KV level from existing Grid station of<br />

DTL.<br />

- 37 -<br />

Critical<br />

Areas<br />

1.D M<br />

plant<br />

erection<br />

2. Control<br />

room<br />

erection<br />

. GT#4 yet<br />

to reach at<br />

site<br />

3. Delayed<br />

Civil Work<br />

in<br />

STG,BOP<br />

and<br />

Module 2<br />

areas