BROAD STATUS OF THERMAL POWER PROJECTS IN DELHI<br />
Commissioning Schedule<br />
Sl.<br />
No.<br />
Project Details Capacity<br />
(MW)<br />
Original Actual(A) / As<br />
now Expected<br />
Broad Status<br />
Syn. COD Syn. COD<br />
(Com.) (Com.)<br />
I. PROJECTS UNDER CONSTRUCTION<br />
STATE SECTOR<br />
1. Pragati III Power 1500<br />
a) LOI issued to BHEL on<br />
Project, Bawana<br />
30.4.08.<br />
Pragati Power Corp.<br />
b) Contract signed on<br />
Ltd.,GENCO, (Delhi)<br />
30.5.08.<br />
Block-I GT-1<br />
03/10<br />
08/10<br />
c) Advance issued on<br />
(3/10)<br />
(8/10)<br />
13.6.08.<br />
GT-2 3x250 750 05/10<br />
(5/10)<br />
09/10<br />
(10/10) 02/11<br />
d) Laying work of gas pipe<br />
line from GAIL is in<br />
progress.<br />
e) Order for civil works has<br />
ST<br />
07/10<br />
02/11<br />
been awarded to M/s Era<br />
(7/10) (02/11)<br />
on 22.10.08.<br />
f) Civil works of raw water<br />
Block-II GT-1<br />
07/10<br />
10/10<br />
reservoir and CW pump<br />
(7/10) (10/10)<br />
house are in progress.<br />
g) GT-1&2 and HRSG<br />
GT-2 3x250 750 09/10<br />
(09/10)<br />
02/11<br />
(02/11) 04/11<br />
foundations<br />
completed.<br />
have been<br />
ST<br />
11/10<br />
04/11<br />
i) GT#1,Gt#2 & GT#3 placed<br />
on foundation<br />
(11/10) (04/11)<br />
Sanctioning <strong>Authority</strong> : Govt. of National Territory of Delhi<br />
Est. approved cost : Rs. 519581 lakhs<br />
Exp. during 2008-09 : Rs. 45238 lakhs<br />
Exp. during 2009-10 : Rs. 4938 lakhs(4/09)<br />
Total Expenditure : 1900 Crores (30/04/10)<br />
Type of fuel : Natural Gas<br />
Gas turbine : GE (9FE)<br />
Fuel Linkage : Gas has been ties up with GAIL, IOC & BPCL<br />
For 2 mmscms by each company .<br />
Date of Main Plant : M/s BHEL (30.5.2008) (Rs.349999 lakhs)<br />
Order (Turn-key)<br />
Power Evacuation System : At 400 KV level from existing Grid station of<br />
DTL.<br />
- 37 -<br />
Critical<br />
Areas<br />
1.D M<br />
plant<br />
erection<br />
2. Control<br />
room<br />
erection<br />
. GT#4 yet<br />
to reach at<br />
site<br />
3. Delayed<br />
Civil Work<br />
in<br />
STG,BOP<br />
and<br />
Module 2<br />
areas