Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Sl.<br />
No.<br />
4.<br />
5.<br />
PROJECT<br />
DETAILS<br />
Capacity<br />
(MW)<br />
Bela Thermal<br />
Power Project<br />
(Distt. Nagpur)<br />
M/s Ideal Energy<br />
ProjectsLimited<br />
(IEPL)<br />
270<br />
Unit - 1 270 10/11<br />
Date of Approval by<br />
State Govt.<br />
: N.A.<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
now Expected<br />
Syn. Com. Syn. Com.<br />
12/11 10/11<br />
Original Est. cost. : Rs- 147700 Lakhs<br />
Latest Cost : Rs. 147700 Lakhs<br />
Exp. Upto 03/09 : Rs. 7200 lakhs<br />
Exp. During 09-10 : Rs. 12749Lakhs.<br />
Exp. During 10-11<br />
(upto 04/10 )<br />
Type of fuel : Coal<br />
: Rs. 3851 Lakhs<br />
Fuel Linkage :From WCL and MCL<br />
FSA : FSA with SECL in progress.<br />
Financial closure : Achieved in 10/09<br />
Date of Main Plant<br />
Order<br />
Power Evacuation System: yet to start<br />
Amravati TPP ,<br />
(Distt: Amravati)<br />
M/s Indiabulls<br />
Power<br />
Ltd.(Formermerly<br />
known as Sophia<br />
Power Ltd.)<br />
Unit-1<br />
1320<br />
12/11<br />
: Placed on M/s BHEL on 26.12.08<br />
for BTG.<br />
660 06/11 11/11 06/11 11/11<br />
Unit-2 660 09/11 02/12 09/11 02/12<br />
Date of Approval by State<br />
Govt.<br />
: N.A.<br />
Org.Est. cost : Rs.688800 lakhs<br />
Exp. upto 03/09 : Nil<br />
Exp. During 09-10<br />
( Up to 08/09)<br />
: Rs. 15582 Lakhs<br />
Financial Closure : Achieved in10/09.<br />
Type of fuel :Coal<br />
FSA : With WCL on 13.06.09<br />
Fuel Linkage : From SECL on 06.06.09.<br />
Date of Main Plant Order :EPCContract awarded to<br />
SEPCO Electric Power<br />
Construction Corp. ( China)<br />
in 07/09.<br />
Zero date of the project : 07/09<br />
Power Evacuation System: yet to start<br />
- 80 -<br />
Broad Status<br />
1. All required clearances are available.<br />
2. Zero date of the project is 260.12.08.<br />
3. Order for all the BOPs have been placed<br />
on 29.07.09 on M/s Mcnally Bharat<br />
Engg. Co.Ltd. Kolkata(MBE) on EPC<br />
basis.<br />
4. FSA with SECL is in progress.<br />
5. BHEL have opened site office on<br />
16.08.09 and site mobilization activities<br />
are in full swing.<br />
6. M/s MBE have mobilized site on<br />
22.09.09.<br />
7. Area grading started on 16.10.09.<br />
8. Seven Nos.RCC footings completed.<br />
9. Design & Engineering is in progress.<br />
Unit-1<br />
Boiler<br />
1. Boiler foundation work completed.<br />
2. Boiler front handed over to BHEL by<br />
MBE.<br />
3. Boiler material supply started from<br />
29.11.09.<br />
4. Boiler erection started on 06.03.10<br />
against the original schedule of<br />
26.12.09.<br />
TG<br />
1. TG deck casting completed.<br />
2. TG erection start is expected in 07/10.<br />
1. All clearances are available.<br />
2. Zero date of the project is 07/09.<br />
3. Mega status requested for the project<br />
applied on 12.09.08.<br />
4. Design & Engineering is in progress.<br />
5. All the BOPs are in the scope of EPC<br />
contractor.<br />
6. The orders for main plant civil &<br />
Structural work, Cooling Tower and<br />
Chimney have already been place by<br />
EPC contractor on Elena Power and<br />
Infrastructure Limited. The process of<br />
order placement for other BOPs is in<br />
progress.<br />
Critical<br />
Areas<br />
Accordance<br />
of Mega<br />
Status