BROAD STATUS OF CENTRAL SECTOR THERMAL POWER PROJECTS<br />
(DAMODAR VALLEY CORPORATION)<br />
PROJECT DETAILS<br />
A PROJECTS INCLUDED IN 11 TH PLAN<br />
Capacity<br />
(MW)<br />
Commissioning Schedule<br />
Original Actual(A) / As now<br />
Expected<br />
Syn. COD Syn. COD<br />
(Comm)<br />
(Comm)<br />
I PROJECTS COMMISSIONED. 1000 MW<br />
1.<br />
Mejia TPS Ph-I<br />
(Distt. Bankura, West Bengal)<br />
Unit-5<br />
Unit-6*<br />
500<br />
250<br />
250<br />
11/06<br />
01/07<br />
Investment approval : 18.02.2009 (DVC Board)<br />
Revised Estimated cost : Rs.236663 lakhs<br />
Exp. During 2004-05 : Rs 29883.34 Lakhs<br />
Cumul. Exp. 2004-05 : Rs. 29906.34 Lakhs<br />
Exp. During 2005-06 : Rs 50163 Lakhs<br />
Cumul. Exp. 2005-06 : Rs 80069.34 lakhs<br />
Exp. During 2006-07 : Rs 84979.94 lakhs<br />
Cumul. Exp. 2006-07 : Rs 165049.28 lakhs<br />
Exp. During 2007-08 : Rs 37248 lakhs<br />
Cumul. Exp. 2007-08 : Rs 202297.28 lakhs<br />
Exp. in 2008-09 : Rs 13000 lakhs<br />
Cumul.Exp. in 2008-09 : Rs 215297.28 lakhs<br />
01/07<br />
03/07<br />
Exp. in 2009-10 : Rs 1152.00 lakhs<br />
Cumulative exp. : Rs. 216449.28 lakhs (Jan’10)<br />
Type of fuel : Coal<br />
2.<br />
Date of Main Plant Order: 15.06.04 on M/s BHEL(EPC)<br />
Chandrapura TPS<br />
500<br />
(Distt. Bokaro Jharkhand)<br />
Unit -7<br />
250 11/06<br />
12/06<br />
01/07<br />
Unit -8<br />
250 01/07<br />
02/07<br />
03/07<br />
Investment approval. : 09.06.2004 (DVC Board)<br />
30/03/07 (A)<br />
02/01/08 (A)<br />
01/10/07(A)<br />
22/05/08(A)<br />
06.01.09(A)<br />
04.11.09(A)<br />
30.03.10(A)<br />
31.03.10(A)<br />
- 30 -<br />
29/02/08 (A)<br />
24/09/08 (A)<br />
08/10<br />
09/10<br />
Estimated cost : Rs.206645 lakhs<br />
Revised Estimated cost : Rs.220135 lakhs<br />
Exp. During 2004-05 : Rs 26561.00 Lakhs<br />
Cumul. Exp. 2004-05 : Rs. 26561.00 Lakhs<br />
Exp. During 2005-06 : Rs 39162.00 Lakhs<br />
Cumul. Exp. 2005-06 : Rs 65723.00 lakhs<br />
Exp. During 2006-07 : Rs 58811.00 Lakhs<br />
Cumul. Exp. 2006-07 : Rs 124534.00 lakhs<br />
Exp. During 2007-08 : Rs 46306.00 Lakhs<br />
Cumul. Exp. 2007-08 : Rs 170840.00 lakhs<br />
Exp. During 2008-09 : Rs 29422.00 Lakhs<br />
Cumul. Exp. 2008-09 : Rs 200262.00 Lakhs<br />
Exp. During 2009-10 : Rs 21718.00 Lakhs<br />
Cumul. Exp. 2009-10 : Rs 221980.00 Lakhs (Jan_10)<br />
Date of Main Plant Order : 30.06.04 on M/s BHEL (Turnkey)<br />
Type of fuel : Coal<br />
Power Evacuation System:<br />
1) 220 KV D/C LILO of CTPS-MTPS at Kalyaneshwari CKT-I (89 Ckm) & CKT-<br />
II(90 Ckm).<br />
2) 220 KV D/C LILO of Kalyaneshwari- Pithakyari Line (8 Ckm X 2 ).<br />
Fuel Supply Arrangement:<br />
2.0 MTPA Coal from Gondulpara, CCL, Coal block jointly allocated to TVNL &<br />
DVC on 50:50 basis from 2013-14 and before this CCL will supply 2.08 MTPA coal.<br />
Broad Status<br />
Unit-5:<br />
Unit synchronized on 30.03.07.Coal<br />
firing achieved on 24.11.07, full load<br />
achieved on 2 nd Jan’08 and declared<br />
on commercial operation since 29<br />
Feb’08.<br />
Unit-6*:<br />
Unit Synchronised on<br />
01.10.2007. Coal firing achieved on 30<br />
Mar’08. Full load achieved on<br />
22.05.2008. Unit declared for<br />
commercial operation since 24<br />
Sep’08.<br />
* Unit slipped from 10 th Plan.<br />
Unit-7<br />
Unit synchronized on 06.01.09.Coal<br />
firing was achieved on 15 Sep’09 with<br />
the alternative (contingency) route.<br />
The Unit commissioned (Full load) on<br />
04.11.09 at 17:48 Hrs. Unit COD is<br />
expected in August’10.<br />
Unit-8<br />
BOILER<br />
Boiler Erection commenced on<br />
31.01.2006. Boiler drum was lifted<br />
on 14.08.2006. Hydraulic test<br />
(Drainable) completed on 02 nd<br />
Novomber’07.The Boiler Lightup<br />
done on 29.11.09 at 20.30 Hrs.. SBO<br />
completed on 10 th Mar’10. TG<br />
erection started on 05.08.08 and TG<br />
box up was completed in Nov’09.<br />
Steam rolling was completed in<br />
Mar’10.<br />
Unit was oil synchronised on<br />
30.03.10. Unit achieved coal firing<br />
and full load on 31.03.2010. Unit<br />
COD is expected in Sep’10.<br />
Critical<br />
Areas<br />
Completion<br />
of Coal<br />
Handling<br />
Plant.<br />
Completion<br />
of Heavy<br />
oil & PT<br />
plant.<br />
Repair of<br />
damaged<br />
rotor of<br />
unit-7