PROJECT DETAILS<br />
12 th Plan Projects<br />
Muzaffarpur TPP Exp<br />
(Distt: Muzaffarpur,<br />
Capacity<br />
(MW)<br />
2x195<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
Syn.<br />
(com.)<br />
Bihar)<br />
U#1 195 09/12<br />
10/12<br />
U#2 195 12/12<br />
01/13<br />
Type of fuel : Coal<br />
Date of Main Plant Order : on 21.04.10<br />
Mauda TPP<br />
(Dist. Nagpur,<br />
Maharashtra)<br />
1000<br />
now Expected<br />
COD Syn.<br />
(com)<br />
COD<br />
09/12<br />
10/12<br />
12/12<br />
01/13<br />
Unit-1 500 02/12 07/12 01/12<br />
(06/12) (03/12)<br />
Unit-2 500 08/12 01/13 08/12<br />
(12/12<br />
)<br />
(10/12)<br />
Date of TEC : Not required<br />
Investment Approval : 11/07<br />
Est. approved cost : Rs. 545928 Lakhs<br />
Exp. Upto 03/09 : Rs. 45520 Lakhs<br />
Exp. During 09-10 : Rs 59540Lakhs<br />
Exp. During 10-11<br />
(Upto 04/10)<br />
: Rs 2400 Lakhs<br />
Type of fuel : Coal<br />
Fuel Linkage : Available<br />
Date of Main Plant<br />
Order<br />
: 11/08 on M/s BHEL(BTG)<br />
Power Evacuation System:<br />
Vindhyachal STPP<br />
St-IV,Unit-11 &12<br />
(Dist. Sidhi)<br />
NTPC<br />
1000<br />
Unit-11 500 04/12 09/12 01/12<br />
08/12<br />
03/12<br />
Unit-12 500 10/12 03/13 03/12*<br />
State Govt. approval<br />
02/13<br />
06/12<br />
Org Est. approved cost : Rs. 591500 Lakhs<br />
Latest Cost : Rs. 591500 Lakhs<br />
Exp.(up to 3/09) : Rs. 28980 Lakhs<br />
Exp. During 09-10 : Rs 43288 Lakhs<br />
Exp. 2010-11 (up to<br />
5/10)<br />
Cumulative Exp<br />
(up to 5/10)<br />
Type of fuel : Coal<br />
Date of Main Plant<br />
Order<br />
: Rs. 6084 lakhs<br />
: Rs. 78364 lakhs<br />
04/12<br />
11/12<br />
04/12<br />
07/12<br />
SG & Aux. awarded in 1/09 & TG &Aux<br />
awarded in 2/09 on M/s BHEL<br />
- 24 -<br />
Broad Status<br />
Order placed in 04/10 on BHEL<br />
1. Main plant order (BTG) placed on<br />
BHEL in 11/08.<br />
2. Zero Date of the project is 11/08.<br />
3. All clearances are available.<br />
4. Site leveling work commenced on<br />
11.12.08 and completed in 02/09.<br />
Unit-1<br />
Boiler<br />
1. Boiler erection started in 08/09.<br />
2. ESP erection started in 12/09.<br />
3. Boiler drum lifting completed on<br />
02.06.10.<br />
Unit-2<br />
Boiler<br />
1. Commencement of fdn. Work started<br />
in 11/09.<br />
2. Boiler erection started on 30. 04.10.<br />
• BTG awarded on BHEL<br />
• CHP award is yet to be placed.<br />
• Chimney- Piling work completed.<br />
• Coolin Tower package order placed<br />
on NBCC in 1/10.<br />
Unit-11<br />
• Foundation work is under progress in<br />
boiler area.<br />
• Boiler erection started in 03/10.<br />
• Boiler drum lifted in 6/10.<br />
• TG erection is expected to start in<br />
10/10<br />
Unit-12<br />
• Boiler piling work completed in 3/10.<br />
• Boiler erection started in 06/10.<br />
• Boiler drum lifting is expected by<br />
10/10.<br />
• TG erection is expected to start in<br />
12/10<br />
Critical<br />
Areas<br />
Supply of<br />
Drum<br />
delayed<br />
drum<br />
lifting.