PROJECT DETAILS<br />
Capacity<br />
(MW)<br />
PROJECTS INCLUDED IN 12 TH PLAN<br />
Vallur TPP St-I Ph-II 500<br />
(JV- NTPC-Tamil Nadu<br />
Energy Co., Ltd.), NTECL.<br />
(Distt Thiruvallur ,TN.)<br />
Unit-3<br />
500<br />
Investment Approval<br />
Sanctioning <strong>Authority</strong><br />
Estimated cost<br />
Latest approved cost<br />
Expd. During 2008-2009<br />
Expd. upto 03/10<br />
Expd. During 2010-11<br />
(upto 06/10)<br />
Type of Fuel<br />
Date of Main Plant Order<br />
Zero Date<br />
Fuel Linkage<br />
Asso.Transmission<br />
system<br />
Korba STPP St. III<br />
(Dist. Korba ,<br />
Chhattisgarh)<br />
Syn.<br />
Comm.<br />
09/12<br />
12/12<br />
: 07/2009<br />
: NTECL Board<br />
: Rs 308678 Lakh<br />
: Rs 308678 Lakh<br />
: Rs – Nil -<br />
: Rs 21378 Lakh<br />
: Rs 2148 Lakh<br />
500<br />
Commissioning Schedule<br />
Original Actual (A) /As<br />
now expected<br />
COD Syn.<br />
Comm.<br />
COD<br />
12/12<br />
09/12<br />
12/12<br />
: Coal ( MCL coal fields )<br />
: 28.07.2009 (SG &TG) on M/S BHEL<br />
: 28/ 07/2009<br />
01/13<br />
: In principle clearance received from Min. of<br />
coal For Ph-II<br />
: PGCL is to execute the following<br />
transmission lines through M/s Bajaj<br />
a) VTPP – Almathi 400KV D/C line<br />
b) VTPP – Melakottaiyur 400KV D/C line<br />
TNEB is to execute the following<br />
transmission line :<br />
VTPP – NCTPS ( TNEB ) 400KV D/C line<br />
Unit-7 500 02/10 06/10 08/10<br />
06/10 10/10<br />
Date of TEC : Not required<br />
10/10<br />
Investment Approval : 08/06.<br />
Completed cost. : Rs. 244849 Lakhs<br />
Exp. During 05-06 : Rs. 13006 Lakhs<br />
Exp. During 06-07 : Rs. 16010 Lakhs<br />
Exp. During 07-08 : Rs 53704 Lakhs<br />
Exp. During 08-09 : Rs. 66510 Lakhs<br />
Exp. During 09-10 : Rs. 47003 Lakhs<br />
Exp. During 10-11<br />
(Upto 04/10 )<br />
: Rs. 1000 Lakhs<br />
Total Cumm. Exp. ( up to<br />
04/10 )<br />
: Rs 197333 Lakhs<br />
Type of fuel : Coal<br />
Zero date : 08/06<br />
Date of Main Plant Order : 24.3.06 on M/s BHEL ( B.T.G)<br />
- 18 -<br />
Broad Status<br />
• MOEF Clearance obtained on 03.06.09<br />
• CRZ clearance obtained on 14.07.09<br />
Chimney- 5/6 segments concreting completed<br />
up to June 2010.<br />
• 1909 piles in boiler area completed.<br />
• Blr erection started on 30.06.10<br />
• 221/264 piles in Mills & Bunkers area, ESP<br />
area completed.<br />
• 244/319 piles in Main Plant Power house<br />
area completed.<br />
• 62/64 TG piles completed.<br />
• Boiler -26 Nos. foundation piles completed.<br />
• ESP passes A, B & C raft completed. Pass D<br />
excavation in progress. 105/220 pedestals<br />
completed.<br />
• BOPs are common for ST-1, Ph-I & Ph-<br />
II.<br />
1. Main plant order of Rs. 996 crores<br />
placed on BHEL on 24/3/ 06.<br />
2. Zero date of the project is 08/06.<br />
3. MOE&F clearance received on<br />
31.8.06.<br />
4. Main Plant Civil works ordered in<br />
9/06 by NTPC.<br />
Chimney shell casting completed in<br />
11/08. ESP structural steel work is in<br />
progress.<br />
Boiler<br />
1. Boiler erection started on 17.10.07.<br />
2. Boiler drum lifted on 27.02.08<br />
3.HT completed on 28.01.09<br />
4. Boiler light up completed in 02/10.<br />
5. Steam blowing completion expected<br />
in June,10.<br />
TG<br />
1 TG deck casting completed in 09/10.<br />
2TG erection started on 07.08.09<br />
3. TG Box completed on 31.12.09.<br />
Critic<br />
al<br />
Areas<br />
1)<br />
Completio<br />
n of coal<br />
handling<br />
plant<br />
transfer<br />
tower TP<br />
29 & 30<br />
for duct<br />
erection<br />
bet’n<br />
boiler<br />
&ESP.<br />
2) Delay<br />
in various<br />
civil and<br />
structural<br />
works by<br />
M/s<br />
SPML