Jun'2010 - Central Electricity Authority

Jun'2010 - Central Electricity Authority

Jun'2010 - Central Electricity Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sl.<br />

No<br />

4<br />

5.<br />

PROJECT DETAILS<br />

Capacity<br />

(MW)<br />

PROJECTS INCLUDED IN 12 TH PLAN<br />

Vallur TPP St-I Ph-II 500<br />

(JV- NTPC-Tamil Nadu<br />

Energy Co., Ltd.), NTECL.<br />

(Distt Thiruvallur ,TN.)<br />

Unit-3<br />

500<br />

Investment Approval<br />

Sanctioning <strong>Authority</strong><br />

Estimated cost<br />

Latest approved cost<br />

Expd. During 2008-2009<br />

Expd. upto 03/10<br />

Expd. During 2010-11<br />

(upto 06/10)<br />

Type of Fuel<br />

Date of Main Plant Order<br />

Zero Date<br />

Fuel Linkage<br />

Asso.Transmission<br />

system<br />

Korba STPP St. III<br />

(Dist. Korba ,<br />

Chhattisgarh)<br />

Syn.<br />

Comm.<br />

09/12<br />

12/12<br />

: 07/2009<br />

: NTECL Board<br />

: Rs 308678 Lakh<br />

: Rs 308678 Lakh<br />

: Rs – Nil -<br />

: Rs 21378 Lakh<br />

: Rs 2148 Lakh<br />

500<br />

Commissioning Schedule<br />

Original Actual (A) /As<br />

now expected<br />

COD Syn.<br />

Comm.<br />

COD<br />

12/12<br />

09/12<br />

12/12<br />

: Coal ( MCL coal fields )<br />

: 28.07.2009 (SG &TG) on M/S BHEL<br />

: 28/ 07/2009<br />

01/13<br />

: In principle clearance received from Min. of<br />

coal For Ph-II<br />

: PGCL is to execute the following<br />

transmission lines through M/s Bajaj<br />

a) VTPP – Almathi 400KV D/C line<br />

b) VTPP – Melakottaiyur 400KV D/C line<br />

TNEB is to execute the following<br />

transmission line :<br />

VTPP – NCTPS ( TNEB ) 400KV D/C line<br />

Unit-7 500 02/10 06/10 08/10<br />

06/10 10/10<br />

Date of TEC : Not required<br />

10/10<br />

Investment Approval : 08/06.<br />

Completed cost. : Rs. 244849 Lakhs<br />

Exp. During 05-06 : Rs. 13006 Lakhs<br />

Exp. During 06-07 : Rs. 16010 Lakhs<br />

Exp. During 07-08 : Rs 53704 Lakhs<br />

Exp. During 08-09 : Rs. 66510 Lakhs<br />

Exp. During 09-10 : Rs. 47003 Lakhs<br />

Exp. During 10-11<br />

(Upto 04/10 )<br />

: Rs. 1000 Lakhs<br />

Total Cumm. Exp. ( up to<br />

04/10 )<br />

: Rs 197333 Lakhs<br />

Type of fuel : Coal<br />

Zero date : 08/06<br />

Date of Main Plant Order : 24.3.06 on M/s BHEL ( B.T.G)<br />

- 18 -<br />

Broad Status<br />

• MOEF Clearance obtained on 03.06.09<br />

• CRZ clearance obtained on 14.07.09<br />

Chimney- 5/6 segments concreting completed<br />

up to June 2010.<br />

• 1909 piles in boiler area completed.<br />

• Blr erection started on 30.06.10<br />

• 221/264 piles in Mills & Bunkers area, ESP<br />

area completed.<br />

• 244/319 piles in Main Plant Power house<br />

area completed.<br />

• 62/64 TG piles completed.<br />

• Boiler -26 Nos. foundation piles completed.<br />

• ESP passes A, B & C raft completed. Pass D<br />

excavation in progress. 105/220 pedestals<br />

completed.<br />

• BOPs are common for ST-1, Ph-I & Ph-<br />

II.<br />

1. Main plant order of Rs. 996 crores<br />

placed on BHEL on 24/3/ 06.<br />

2. Zero date of the project is 08/06.<br />

3. MOE&F clearance received on<br />

31.8.06.<br />

4. Main Plant Civil works ordered in<br />

9/06 by NTPC.<br />

Chimney shell casting completed in<br />

11/08. ESP structural steel work is in<br />

progress.<br />

Boiler<br />

1. Boiler erection started on 17.10.07.<br />

2. Boiler drum lifted on 27.02.08<br />

3.HT completed on 28.01.09<br />

4. Boiler light up completed in 02/10.<br />

5. Steam blowing completion expected<br />

in June,10.<br />

TG<br />

1 TG deck casting completed in 09/10.<br />

2TG erection started on 07.08.09<br />

3. TG Box completed on 31.12.09.<br />

Critic<br />

al<br />

Areas<br />

1)<br />

Completio<br />

n of coal<br />

handling<br />

plant<br />

transfer<br />

tower TP<br />

29 & 30<br />

for duct<br />

erection<br />

bet’n<br />

boiler<br />

&ESP.<br />

2) Delay<br />

in various<br />

civil and<br />

structural<br />

works by<br />

M/s<br />

SPML