BROAD STATUS OF THERMAL POWER PROJECTS IN MAHARASHTRA<br />

Sl.<br />

Capacity Commissioning Schedule<br />

No. PROJECT DETAILS (MW) Original Actual(A) / As<br />

now Expected<br />

Syn. COD Syn. COD<br />

(com.)<br />

PROJECTS INCLUDED IN 11<br />

(com.)<br />

TH PLAN<br />

I. PROJECTS COMMISSIONED<br />

1. Paras TPP Expn.*<br />

(Distt. Akola)<br />

MSPGCL<br />

250<br />

2.<br />

Uni-1*<br />

250<br />

11/06<br />

01/07<br />

Date of TEC<br />

: 13.06.2003<br />

Date of Appl. by State Govt. : 9.9.2003<br />

Org.Est.Proj.Cost : Rs. 102670lakhs<br />

Latest Cost of Proj. : Rs. 146840akhs<br />

Exp. Upto 03/06 : Rs.6459.04 lakhs<br />

Exp. During 06-07(upto3/07) : Rs 44103 lakhs<br />

Exp.During 7-08((Upto 7/07) : Rs.1788 lakhs<br />

Cumulative Exp.(01/08) : Rs. 132856 Lakhs<br />

Type of fuel :Coal<br />

05/07(A) 03/08(A)<br />

Financial closure : Achieved on Jan.04<br />

Equity: GOMaharashtra Rs.<br />

190.24 Crs.<br />

Loan: PFC Rs. 820 Crs.<br />

Date of Main Plant Order : M/S BHEL on 25.5.04<br />

(BTG)<br />

* Slipped from 10 TH Plan<br />

TrombayTPS<br />

Extension<br />

(Distt. Mumbai)<br />

TPCL<br />

250<br />

Unit - 8 250 08/08 10/08 01/09(A)<br />

(09/08) (03/09)<br />

Date of TEC : Not Required<br />

Date of Approval by State Govt.<br />

: N.A.<br />

Original Est. cost. : Rs. 99000 lakhs<br />

Latest Cost : Rs.106600 Lakhs<br />

Exp. Upto 03/07 : Rs. 9900 Lakhs<br />

Exp. During 07-08<br />

(Upto 03/08)<br />

: Rs.48700 Lakhs.<br />

Type of fuel : Imported Coal (very low<br />

Sulphur & Ash content)<br />

Fuel Linkage Imported Coal (very low<br />

Sulphur & Ash content)<br />

Financial closure : 27.9.06<br />

Date of Main Plant Order : M/S BHEL on 05.06.06<br />

(EPC Basis)<br />

Power Evacuation System: Existing 400kV line.<br />

- 72 -<br />

03/09<br />

(A)<br />

Broad Status<br />

Unit synchronized on 31.5.07.<br />

Coal Firing completed on 18.10.07.<br />

Full load operation completed on<br />

10.03.08. Third mill was made ready<br />

in the last week of March08. COD<br />

achieved on 31.03.08.<br />

Unit-8 :<br />

Synchronised on 14.01.09. Coal<br />

firing achieved on 07.03.09. Full<br />

load achieved 26.03.09. FGD<br />

commissioned in 03/09. COD<br />

achieved on 29.03.09<br />

Critical<br />

Areas