Nuclear Units Commissioned During 2010-11<br />
Sl.No Project<br />
Name<br />
State Unit<br />
No.<br />
Agency Capacity<br />
(MW)<br />
- 9 -<br />
Anti. Date of<br />
Commissioning<br />
1 Kaiga Karnataka U-4 NPC 220 Dec-10<br />
2 Kudankulam TN U-1 NPC 1000 Mar-11<br />
3.0 10 th PLAN SUMMARY<br />
Total Nuclear for 20100-11 1220<br />
Remarks<br />
3.1 TOTAL CAPACITY ADDITION ( MW) PROGRAMMED DURING 10 TH PLAN ( AS PER<br />
ORIGINAL TARGET)<br />
SECTOR<br />
CENTRAL<br />
STATE<br />
PRIVATE<br />
TOTAL<br />
THERMAL<br />
HYDRO NUCLEAR TOTAL<br />
ORG. T ACHIV. ORG. T ACHIV. ORG. T ACHIV. ORG. T ACHIV.<br />
12790.00 6590.00 8742.00 4495.00 1300.00 1180.00 22832.00 12265.00<br />
6676.00 3553.64 4481.00 2691.00 0.00 0.00 11157.00 6244.64<br />
5951.00 1970.60 1170.00 700.00 0.00 0.00 7121.00 2670.60<br />
25417.00 12114.24 14393.00 7886.00 1300.00 1180.00 41110.00 21180.24<br />
3.2 YEAR-WISE THERMAL CAPACITY ADDITION (MW) INDICATING ORIGINAL TARGETS<br />
VS ACTUAL ACHIEVEMENT DURING 10 TH PLAN.<br />
Year CENTRAL STATE PRIVATE TOTAL<br />
SECTOR SECTOR SECTOR<br />
2002-03 Original Target 920 790.1 1792* 3502.1<br />
Actual Achievement 1210 665.1 348 2223.1<br />
2003-04 Original Target 500 847.5 - 1347.5<br />
Actual Achievement 710 651.6 - 1361.6<br />
2004-05 Original Target 710 1395 1630.6 3735.6<br />
Actual Achievement 2210 653.92 70 2933.92<br />
2005-06 Original Target 3570 885 1309 5764<br />
Actual Achievement 500 428 660.8 1588.8<br />
2006-07 Original Target 7090 2758 1219 11067<br />
Actual Achievement 1960 1155 891.8 4006.8<br />
Total Original Target 12790 6675.6 5950.6 25416.2<br />
Actual Achievement 6590.00 3553.64 1970.60 12114.24<br />
• Includes Dabhol CCGT Ph.-II (1444 MW)