Sl. No<br />

PROJECT DETAILS<br />

Capacity<br />

(MW)<br />

Commissioning Schedule<br />

Original Actual(A) / As<br />

now Expected<br />

Syn. COD Syn. COD<br />

(Comm) (Comm)<br />

III. DVC & Tata Power, Joint Venture under Public Private Partnership programme:<br />

1.<br />

Maithon R/B TPP<br />

(MPL – a JV Co. of DVC<br />

& Tata Power), PO-Nirsa<br />

Distt. Dhanbad, Jharkhand<br />

Unit-1<br />

1050<br />

525<br />

09/10<br />

10/10<br />

Unit-2 525 03/11<br />

04/11<br />

Est. cost<br />

(Based on A.P. 07-08)<br />

Type of fuel : Coal<br />

Main Plant Order(EPC) on BHEL : 25.10.2007<br />

12/10<br />

06/11<br />

01/11<br />

03/11<br />

05/11<br />

07/11<br />

: Rs. 445500 lakhs (DVC contr.-34710)<br />

Exp. During 2006-07 : Rs 1649.87 Lakhs<br />

Cumul. Exp. 2006-07 : Rs 1649.87 Lakhs<br />

Exp. During 2007-08 : Rs 35433.96 Lakhs<br />

Cumul. Exp. 2007-08 : Rs 37083.83 lakhs<br />

Exp. During 2008-09 : Rs 68350.00 Lakhs<br />

Cumul. Exp. 2008-09 : Rs 105433.83 Lakhs<br />

Exp. During 2009-10 : Rs 105007.00 Lakhs<br />

Cumul. Exp.2009-10 : Rs 207882.83 Lakhs (Jan_10)<br />

Power Evacuation System:<br />

a) Open access by PGCIL for evacuation and startup power.<br />

Fuel Supply Arrangement:<br />

a) SLC (LT) granted long term linkage for 4.864 MTPA for BCCL.<br />

b) MT(0.5 MT each from Karo OCP & Khasmahal OCP) from CCL<br />

c) MT out of middling from Tata Steel<br />

Zero date of the project : 25.10.2007 (BTG ORDER)<br />

- 36 -<br />

05/11<br />

08/11<br />

Broad Status<br />

(i) DVC Board on 24.03.05 ratified the ownership<br />

pattern of 26% (DVC) and 74% (TPC)<br />

Status:<br />

(i) Boiler erection of unit-1 was started on<br />

08.09.2008 against the schedule of 25.08.2008<br />

and 11477 MT material erected so far. Drum<br />

lifted on 22.03.09. Boiler hydro test completed<br />

on 24th Mar’10. Boiler litup is expected in<br />

Aug’10<br />

(ii) TG deck casting was completed on<br />

21.06.2009.Condenser erection work started on<br />

10.08.09. TG erection started on Dec’09.<br />

Preliminary works for Turbine and Stator<br />

erection are in progress. condenser tube<br />

insertion is in progress. TG boxup is expected<br />

in Sep’10.<br />

(iii) For Unit-2, Boiler erection started in 21 Jan’09<br />

and 7284 MT material erected so far. Drum<br />

lifted on 03.08.09. Boiler hydro test is expected<br />

in Aug’10.<br />

(iv) TG raft casting is completed. Shuttering for<br />

columns is in progress. Deck casting completed<br />

27.12.09.condenser erection work started on<br />

23.06.10.<br />

(v) ESP erection work of unit-1& 2 started and<br />

3381 & 3106 MT material has been erected so<br />

far respectively.<br />

(vi) Power House PH#1 structural work has been<br />

almost completed .erection work of Unit-2<br />

started and 1829 MT materials have been<br />

erected so far.<br />

(vii) Chimney – Flue can erection work is in<br />

progress.<br />

(viii) Cooling Tower(IDCT1) – Trial Run of IDCT1<br />

has been completed. Mechanical equipment<br />

erection and film filling work for IDCT2 is in<br />

progress.<br />

(ix) DM plant has been partially commissioned.<br />

Piping work for pumps & installation of Field<br />

instruments is in progress.<br />

(x) CHP: RCC work at Track hopper is in progress.<br />

Mechanical Erection for Stacker Reclaimer has<br />

commenced. Structural work for Crusher House<br />

has commenced. Junction Tower and Conveyor<br />

Belt related structural erection is in progress.<br />

Manufacturing is in progress for CHS related<br />

equipment.<br />

(xi) Switch yard etc- Testing for 400kV equipment<br />

has been completed. Testing of Control and<br />

relay panel I in progress. Testing of reactors<br />

and Station Transformer is in progress.<br />

Illumination work is in progress at Power House<br />

#1. Earthing Material laying work is in<br />

progress. HVAC equipment installation has<br />

been completed in Switchyard Control Room.<br />

(xii) Project has achieved 81.53% progress.<br />

Critical<br />

Areas<br />

Timely<br />

supply of<br />

turbines.