Sl.<br />
No.<br />
PROJECT DETAILS<br />
PRIVATE SECTOR<br />
Sugen Gas Based<br />
CCPP (Akhakhol)<br />
(Distt:Surat)<br />
M/s TPGL<br />
Capacity<br />
(MW)<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
Syn.<br />
(com.)<br />
now Expected<br />
COD Syn.<br />
(com.)<br />
COD<br />
- 63 -<br />
Broad Status<br />
1.<br />
1128<br />
1. Block-I is synchronised on 20.11.08<br />
(Revised<br />
and attained a load upto 370 MW<br />
To<br />
(20.01.09).Full load operation<br />
1147.5)<br />
achieved on 04.02.09.<br />
Block-I ( 1GT+1ST ) 376 9/07 10/07 11/08(A) 08/09 2. Block-II synchronised (open cycle)<br />
(382.5)<br />
(A) on 29.01.09. Combined cycle<br />
Block-II ( 1GT+1ST ) 376 12/07 1/08 01/09(A)<br />
(382.5)<br />
Block-III( 1GT+1ST ) 376 02/08 3/08 3/09(A)<br />
(382.5)<br />
Date of TEC : Not Required<br />
Date of Approval by State Govt. : 09/2004<br />
Org.Est. cost : Rs.309600 lakhs<br />
08/09<br />
(A)<br />
08/09<br />
(A)<br />
synch.achieved in first week of<br />
May,09. Full load achieved on<br />
07.05.09.<br />
3. The synchronising with grid of<br />
block-III achieved on 27.03.09.Full<br />
load achieved in combined cycle on<br />
08.06.09.<br />
Latest cost ; Rs.321700 Lakhs<br />
Exp. upto 03/08 : Rs.233700 lakhs<br />
Exp. During 08-09<br />
( Up to 12/08)<br />
: Rs.16954 Lakhs<br />
Financial Closure : Achieved on 22.9.04<br />
Type of fuel :Gas<br />
Fuel Linkage :From IOC & Reliance KG Basin<br />
Date of Main Plant Order :EPC Contract awarded to<br />
Consortium led by M/sSiemens<br />
AG,Germany on 17.6.05<br />
(Through ICB route)<br />
Zero date of the project : 17.06.05<br />
Power Evacuation System: Ready<br />
2. Mundra TPP, Ph-I<br />
(Distt:Kutch)<br />
660<br />
Unit-1<br />
M/s Adani Power<br />
Oil synch. achieved on 23.05.09.Coal<br />
Ltd.<br />
firing achieved on 03.07.09.Full load<br />
Unit-1 330 04/09 05/09 05/09(A) 08/09(A) achieved on 04.08.09.<br />
Unit-2 330<br />
07/09<br />
10/09 01/10(A)<br />
Date of TEC : Not Required<br />
Date of Approval by State Govt. : N.A.<br />
Org.Est.Cost : Rs.228000 lakhs<br />
Exp. upto 03/08 : Rs.129193 lakhs<br />
Exp. during 08-09 ( upto-11/08)<br />
: Rs.42568 lakhs<br />
Financial Closure : Achieved on 20.09.06<br />
03/10(A)<br />
Type of fuel : ImportedCoal<br />
Fuel Linkage :Imported coal from Indonesia<br />
Date of Main Plant Order BTG Contract awarded to SCMEC,<br />
(Boiler-Babcock, China) SFPML China on 01.06.06 and<br />
(TG-BSTG,China)<br />
01.09.06 respectively for U-1&2<br />
(Through ICB route)<br />
Zero date of the project : 01.06.06 &01.09.06 respectively<br />
Power Evacuation System: Ready<br />
Unit-2<br />
Oil synch. achieved on 19.01.10.Coal<br />
firing achieved on 25.02.10.Full load<br />
achieved on 17.03.10.<br />
Critic<br />
al<br />
Areas