Jun'2010 - Central Electricity Authority

Jun'2010 - Central Electricity Authority

Jun'2010 - Central Electricity Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sl.<br />

No.<br />

PROJECT DETAILS<br />

PRIVATE SECTOR<br />

Sugen Gas Based<br />

CCPP (Akhakhol)<br />

(Distt:Surat)<br />

M/s TPGL<br />

Capacity<br />

(MW)<br />

Commissioning Schedule<br />

Original Actual(A) / As<br />

Syn.<br />

(com.)<br />

now Expected<br />

COD Syn.<br />

(com.)<br />

COD<br />

- 63 -<br />

Broad Status<br />

1.<br />

1128<br />

1. Block-I is synchronised on 20.11.08<br />

(Revised<br />

and attained a load upto 370 MW<br />

To<br />

(20.01.09).Full load operation<br />

1147.5)<br />

achieved on 04.02.09.<br />

Block-I ( 1GT+1ST ) 376 9/07 10/07 11/08(A) 08/09 2. Block-II synchronised (open cycle)<br />

(382.5)<br />

(A) on 29.01.09. Combined cycle<br />

Block-II ( 1GT+1ST ) 376 12/07 1/08 01/09(A)<br />

(382.5)<br />

Block-III( 1GT+1ST ) 376 02/08 3/08 3/09(A)<br />

(382.5)<br />

Date of TEC : Not Required<br />

Date of Approval by State Govt. : 09/2004<br />

Org.Est. cost : Rs.309600 lakhs<br />

08/09<br />

(A)<br />

08/09<br />

(A)<br />

synch.achieved in first week of<br />

May,09. Full load achieved on<br />

07.05.09.<br />

3. The synchronising with grid of<br />

block-III achieved on 27.03.09.Full<br />

load achieved in combined cycle on<br />

08.06.09.<br />

Latest cost ; Rs.321700 Lakhs<br />

Exp. upto 03/08 : Rs.233700 lakhs<br />

Exp. During 08-09<br />

( Up to 12/08)<br />

: Rs.16954 Lakhs<br />

Financial Closure : Achieved on 22.9.04<br />

Type of fuel :Gas<br />

Fuel Linkage :From IOC & Reliance KG Basin<br />

Date of Main Plant Order :EPC Contract awarded to<br />

Consortium led by M/sSiemens<br />

AG,Germany on 17.6.05<br />

(Through ICB route)<br />

Zero date of the project : 17.06.05<br />

Power Evacuation System: Ready<br />

2. Mundra TPP, Ph-I<br />

(Distt:Kutch)<br />

660<br />

Unit-1<br />

M/s Adani Power<br />

Oil synch. achieved on 23.05.09.Coal<br />

Ltd.<br />

firing achieved on 03.07.09.Full load<br />

Unit-1 330 04/09 05/09 05/09(A) 08/09(A) achieved on 04.08.09.<br />

Unit-2 330<br />

07/09<br />

10/09 01/10(A)<br />

Date of TEC : Not Required<br />

Date of Approval by State Govt. : N.A.<br />

Org.Est.Cost : Rs.228000 lakhs<br />

Exp. upto 03/08 : Rs.129193 lakhs<br />

Exp. during 08-09 ( upto-11/08)<br />

: Rs.42568 lakhs<br />

Financial Closure : Achieved on 20.09.06<br />

03/10(A)<br />

Type of fuel : ImportedCoal<br />

Fuel Linkage :Imported coal from Indonesia<br />

Date of Main Plant Order BTG Contract awarded to SCMEC,<br />

(Boiler-Babcock, China) SFPML China on 01.06.06 and<br />

(TG-BSTG,China)<br />

01.09.06 respectively for U-1&2<br />

(Through ICB route)<br />

Zero date of the project : 01.06.06 &01.09.06 respectively<br />

Power Evacuation System: Ready<br />

Unit-2<br />

Oil synch. achieved on 19.01.10.Coal<br />

firing achieved on 25.02.10.Full load<br />

achieved on 17.03.10.<br />