2.2 THERMAL UNITS PROGRAMMED FOR COMMISSIONING DURING 2009-10<br />

Sl<br />

No<br />

Project Name/<br />

Unit No.<br />

I COMMISSIONING ASSURED<br />

A CENTRAL SECTOR<br />

1 Kahalgaon STPS-II<br />

(Ph-I & II)<br />

U -7<br />

2<br />

Bhilai Extn. TPP<br />

U-2<br />

3 Chandrapura TPS Extn<br />

U- 7<br />

4 Barsingsar Lignit<br />

U-1<br />

U- 8<br />

5 NCP Project St-II<br />

U-5<br />

B STATE SECTOR<br />

1 Vijaywada TPP –IV<br />

U-1<br />

2 Kutch Lignite Extn<br />

U-4<br />

State/<br />

Impl. Agency<br />

Bihar/ NTPC<br />

Chhattisgarh /<br />

NSPCL<br />

(NTPC & SAIL<br />

JV)<br />

Jharkhand / DVC<br />

Rajasthan/ NLC<br />

Targeted<br />

Cap.<br />

(MW)<br />

500<br />

250<br />

250<br />

250<br />

125<br />

Original<br />

Comm.<br />

Schedule<br />

07/07<br />

10/08<br />

02/07<br />

04/07<br />

12/08<br />

- 5 -<br />

Targeted<br />

Comm.<br />

Date<br />

06/09<br />

06/09<br />

07/09<br />

10/09<br />

10/09<br />

Cap.<br />

(MW)<br />

Achieved/<br />

Anticipated<br />

500<br />

250<br />

250<br />

250<br />

U.P/NTPC<br />

490 08/10 01/10 490<br />

Sub Total (A) 1865 1740<br />

AP/ APGENCO<br />

Gujarat/ GSECL<br />

3 Surat Lignite TPP Extn.<br />

U-3 Gujarat/ GIPCL<br />

4 Utran CCPP Extn<br />

GT<br />

ST<br />

5 Rajiv Gandhi TPS,<br />

Hissar U-1<br />

6 New Parli TPP<br />

U-2<br />

7 Paras TPS Extn.<br />

U-2<br />

8 Chhabra TPS<br />

U-1<br />

9 Giral Lignit- II<br />

U-2<br />

10 Kota TPP<br />

U-7<br />

11 Suratgarh TPP –IV<br />

U-6<br />

12 Bakreshwar TPS-II<br />

U-5<br />

C PRIVATE SECTOR<br />

1 Gautami CCPP<br />

GT -1<br />

GT- 2<br />

ST<br />

2 Konaseema CCPP<br />

GT-1<br />

GT-2<br />

ST<br />

3 Lanco Kondapalli Ext.<br />

Ph-II<br />

GT<br />

ST<br />

4 Lanco Amarkantak<br />

TPS ( Pathadi)<br />

U-1<br />

U-2<br />

Gujarat/ GSECL<br />

Haryana/<br />

HPGCL<br />

Maharastra/MSPGC<br />

L<br />

Maharastra/MSPGC<br />

L<br />

Rajasthan/RRVUNL<br />

Rajasthan/RRVUNL<br />

Rajasthan/RRVUNL<br />

Rajasthan/RRVUNL<br />

500<br />

75<br />

125<br />

240<br />

134<br />

600<br />

250<br />

250<br />

250<br />

125<br />

195<br />

250<br />

12/08<br />

10/06<br />

12/08<br />

06/09<br />

08/09<br />

12/09<br />

07/09<br />

09/09<br />

11/08<br />

08/08<br />

02/09<br />

11/08<br />

06/09<br />

05/09<br />

12/09<br />

09/09<br />

09/09<br />

12/09<br />

10/09<br />

01/10<br />

07/09<br />

05/09<br />

07/09<br />

06/09<br />

500<br />

75<br />

240<br />

134<br />

WB / WBPDCL<br />

210 09/07 06/09 210<br />

Sub Total (B) 3204 3079<br />

AP/ Gautami<br />

Power Ltd.<br />

AP/Konaseema<br />

Gas Power Ltd.<br />

AP/Lanco<br />

Konapalli<br />

Chhattisgarh<br />

/L.A.P. Pvt.Ltd<br />

145<br />

145<br />

174<br />

140<br />

140<br />

165<br />

233<br />

133<br />

300<br />

300<br />

03/06<br />

03/06<br />

12/09<br />

12/09<br />

03/09<br />

07/09<br />

06/09<br />

07/09<br />

12/09<br />

12/09<br />

06/09<br />

12/09<br />

600<br />

250<br />

250<br />

250<br />

125<br />

195<br />

250<br />

145<br />

145<br />

174<br />

140<br />

140<br />

------<br />

233<br />

------<br />

300<br />

300<br />

Anticipated/<br />

Actual Date<br />

of Comm.<br />

31.07.09(A)<br />

12.07.09(A)<br />

04.11.09(A)<br />

31.03.10(A)<br />

04/2010<br />

29.01.10(A)<br />

08.10.09(A)<br />

01.10.09(A)<br />

04/2010<br />

08.08.09(A)<br />

10.10.09(A)<br />

Commissioned<br />

10.02.10(A)<br />

27.03.10(A)<br />

30.10.09(A)<br />

06.11.09(A)<br />

31.08.09(A)<br />

29.08.09(A)<br />

07.06.09(A)<br />

03.05.09(A)<br />

05/09(A)<br />

05/09(A)<br />

04/2010<br />

07.12.09(A)<br />

05/2010<br />

04.06.09(A)<br />

25.03.10(A)<br />

Remarks/<br />

Status<br />

U-1 slipped<br />

to 2010-11<br />

U-3 slipped<br />

to 2010-11<br />

ST :<br />

Slipping to<br />

2010-11<br />

ST :<br />

Slipping to<br />

2010-11