Project Details<br />
Private Sector<br />
Rithala CCPP,<br />
North Delhi Power Ltd.,<br />
(Delhi)<br />
GT-1&2<br />
ST<br />
Sanctioning <strong>Authority</strong><br />
:<br />
Est. approved cost<br />
: Expenditure<br />
(upto 17/09/08)<br />
:<br />
Type of fuel<br />
:<br />
Fuel Linkage :<br />
Date of Main Plant<br />
:<br />
Order<br />
Power Evacuation<br />
:<br />
Capacity<br />
(MW)<br />
108<br />
108<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
Syn.<br />
(Com.)<br />
06/09<br />
07/09<br />
08/09<br />
NA<br />
Rs 25648 lakhs.<br />
now Expected<br />
COD Syn.<br />
(Com.)<br />
COD<br />
08/09<br />
31/07/10<br />
(08/10)<br />
31/08/09<br />
(09/10)<br />
31/09/10<br />
(10/10)<br />
- 38 -<br />
10/10<br />
Rs 15000 lakhs.<br />
Natural Gas<br />
0.6 MMSCMD of Natural gas from KG<br />
basin by RIL<br />
Dismantled power station Equipment<br />
received at site.<br />
Broad Status<br />
• NDPL has procured a 108<br />
MW CCPP of European<br />
manufacturer from Chongqing,<br />
China which has been<br />
dismantled and relocated at<br />
Delhi site.<br />
• MOE&F clearance obtained<br />
from SEIAA, NCT of Delhi on<br />
24.04.09.<br />
• Gas transportation agreement<br />
signed with GAIL on 8.9.08 to<br />
supply gas from Ankot to<br />
project site. GTA with RIL to<br />
transport gas from KG basin to<br />
Ankot is yet to be signed.<br />
• Orders for piling, civil works,<br />
Mechanical, Electrical & C&I<br />
equipment erection have been<br />
placed. Contractor mobilized.<br />
• Piling in IDCT area completed.<br />
Piling in GTG area & in STG<br />
area is in progress.<br />
• 1 st GT foundation completed,<br />
2 nd GT foundation is to be cast.<br />
• Erection of GTs planned in<br />
July’09.<br />
• STG bldg., STG foundations<br />
and WHRB foundations are<br />
expected to be ready by<br />
Aug’09.<br />
Critical<br />
Areas<br />
Folow up<br />
of Rotor<br />
refurbishm<br />
ent.