Sl.<br />

No.<br />

1.<br />

Project Details<br />

Private Sector<br />

Rithala CCPP,<br />

North Delhi Power Ltd.,<br />

(Delhi)<br />

GT-1&2<br />

ST<br />

Sanctioning <strong>Authority</strong><br />

:<br />

Est. approved cost<br />

: Expenditure<br />

(upto 17/09/08)<br />

:<br />

Type of fuel<br />

:<br />

Fuel Linkage :<br />

Date of Main Plant<br />

:<br />

Order<br />

Power Evacuation<br />

:<br />

Capacity<br />

(MW)<br />

108<br />

108<br />

Commissioning Schedule<br />

Original Actual(A) / As<br />

Syn.<br />

(Com.)<br />

06/09<br />

07/09<br />

08/09<br />

NA<br />

Rs 25648 lakhs.<br />

now Expected<br />

COD Syn.<br />

(Com.)<br />

COD<br />

08/09<br />

31/07/10<br />

(08/10)<br />

31/08/09<br />

(09/10)<br />

31/09/10<br />

(10/10)<br />

- 38 -<br />

10/10<br />

Rs 15000 lakhs.<br />

Natural Gas<br />

0.6 MMSCMD of Natural gas from KG<br />

basin by RIL<br />

Dismantled power station Equipment<br />

received at site.<br />

Broad Status<br />

• NDPL has procured a 108<br />

MW CCPP of European<br />

manufacturer from Chongqing,<br />

China which has been<br />

dismantled and relocated at<br />

Delhi site.<br />

• MOE&F clearance obtained<br />

from SEIAA, NCT of Delhi on<br />

24.04.09.<br />

• Gas transportation agreement<br />

signed with GAIL on 8.9.08 to<br />

supply gas from Ankot to<br />

project site. GTA with RIL to<br />

transport gas from KG basin to<br />

Ankot is yet to be signed.<br />

• Orders for piling, civil works,<br />

Mechanical, Electrical & C&I<br />

equipment erection have been<br />

placed. Contractor mobilized.<br />

• Piling in IDCT area completed.<br />

Piling in GTG area & in STG<br />

area is in progress.<br />

• 1 st GT foundation completed,<br />

2 nd GT foundation is to be cast.<br />

• Erection of GTs planned in<br />

July’09.<br />

• STG bldg., STG foundations<br />

and WHRB foundations are<br />

expected to be ready by<br />

Aug’09.<br />

Critical<br />

Areas<br />

Folow up<br />

of Rotor<br />

refurbishm<br />

ent.