Sl.<br />
Capacity Commissioning Schedule<br />
No. PROJECT DETAILS (MW) Original Actual(A) / As<br />
now Expected<br />
Syn. COD Syn. COD<br />
Comm Comm<br />
II. PROJECTS UNDER CONSTRUCTION<br />
STATE SECTOR<br />
1. Raichur TPP<br />
(M/s KPCL.)<br />
Distt. : Raichur<br />
250<br />
2.<br />
Unit-8 250 07/09 09/09 04/10 (A)<br />
08/09 06/10(A)<br />
Sanctioning <strong>Authority</strong> : State Govt.<br />
Date of Approval by State Govt. : 01.02.2003<br />
06/10<br />
Est. cost : Rs. 92500 Lakh<br />
Latest Cost : Rs. 104 600 Lakh<br />
Exp. during 2003-04 : Rs. 110.05 Lakh<br />
Exp. during 2004-05 : Rs. 5.31 Lakh<br />
Exp .during 2005-06 : Rs. 31.17 Lakh<br />
Exp .during 2006-07 : Rs. 5369.43 Lakh<br />
Exp. During 2007-08 : Rs. 13442.09 Lakh<br />
Exp. During 2008-09 : Rs 54507.47 Lakh<br />
Exp. During 09-10 : Rs. 27449.76 lakhs<br />
Exp. During 10-11 (up to 05/10) : Rs. 62.65 lakhs<br />
Type of fuel :Coal(1.01 MTA from M/s MCL)<br />
Date of Main Plant Order (LOA) : 03.03.07 BHEL (BTG)<br />
Zero Date : 30.03.2007<br />
Bellary TPP St-II<br />
Distt. : Bellary<br />
500<br />
M/s Karnataka Power<br />
Corpn. Ltd<br />
Unit-2 500 11/10<br />
01/11<br />
Date of TEC : NA<br />
02/11 03/11<br />
05/11<br />
Sanctioning <strong>Authority</strong> : State Govt.<br />
Date of Approval by State Govt. : 15.06.2002<br />
Est. cost : Rs.226100 Lakh<br />
Latest Cost : Rs. 226100 Lakh.<br />
Exp .during 2006-07 : Rs.19.87 Lakh<br />
Exp. During 07-08 : Rs. 16773.19 Lakh<br />
Exp. During 08-09 : Rs.37594.43Lakhs<br />
Exp.During 09-10 : Rs. 35229.39 lakhs<br />
Exp.During 10-11 up to 05/10 : Rs. 96.89 lakhs<br />
Financial Closure : -------<br />
Type of fuel : Coal ( CIL/MCL)<br />
Date of Main Plant Order : 31.08.06<br />
Order : BHEL (EPC)<br />
Zero Date : 19.09.2007<br />
06/11<br />
- 94 -<br />
Broad Status<br />
Cooling Tower: Completed.<br />
Chimney: Completed .<br />
CW System: All works completed.<br />
Boiler<br />
-Boiler erection started on 12.12.07. Boiler<br />
drum lifted on 14.08.08.Hydro test<br />
completed on 25.03.09. Light Up<br />
completed on 15.12.09.SBO commenced<br />
on 08.03.10 and completed on 17.03.10.<br />
TG<br />
-Condenser erection started on 05.01.09.<br />
TG erection started on 24.01.09.Box up<br />
completed on 02.12.09.Oil flushing<br />
commenced on 27.01.10 and completed<br />
on 05.03.10. TG put on barring gear on<br />
30.03.10.<br />
- Unit synchronized on oil on 09.04.10 and<br />
coal fired on 22.06.10.<br />
- Unit commissioned i.e. achieved full load on<br />
26.06.10.<br />
CHP: One stream to feed coal to bunkers<br />
commissioned on 22.03.10.<br />
AHP: Work required for synchronization with<br />
coal firing has been completed. Balance works<br />
like pipe laying for disposal wet fly ash, LP<br />
piping in pump house, structural erection of<br />
collector tank in progress.<br />
Reasons for delay:<br />
• Delay in completion of civil works for start of<br />
Condenser & TG erect-ion.<br />
• Late placement of CHP&AHP extension<br />
works.<br />
Availability of Coal<br />
- Boiler erection started on 17.11.08 and in<br />
progress . Drum lifted on 06/04/09. HT<br />
completed on 25 th Jun’10.<br />
- Erection of 4 mills in progress.<br />
- ESP erection started on 19.10.08 and Mills erection<br />
is in progress.<br />
- Foundation work of fans and mills in progress.<br />
-Fabrication & erection of power house, bunker<br />
columns and beams in progress.<br />
- Chimney – Shell concreting completed. Finishing<br />
works are in progress.<br />
- ND Cooling Tower: Shell completed. Erection of<br />
grillage columns in progress.<br />
- Condenser erection commenced on 31.03.10.<br />
- TG erection activities commenced in<br />
Jun’10.<br />
- CW pump house :Staging for pump floor in<br />
progress. Laying and encasement of CW pipe in<br />
progress.<br />
- Clarified water pump house slab concreting is in<br />
progress.<br />
- DM Plant: Roof slab concreting in progress.<br />
- PT Plant: Clarifloculator PCC in progress.<br />
- CHP: Excavation of JT -5&7 in progress. Conveyor<br />
23A/B raft completed, fabrication in progress..<br />
Stacker re-claimer foundation in progress.<br />
- AHP: Ash slurry pump house, Vacuum pump house,<br />
collector tank and silo works are in progress.<br />
- ESP control room & 400 kV Switch yard works in<br />
progress.<br />
- Supply of piping, HPT& LPR by BHEL<br />
Critical<br />
Areas<br />
o Late<br />
receipt<br />
of<br />
boiler<br />
drum<br />
from<br />
BHEL.<br />
o Delay<br />
in<br />
supply<br />
& erection<br />
of<br />
equipm<br />
ent by<br />
BHEL.<br />
o Late<br />
finalizat<br />
ion of<br />
civil &<br />
BOP<br />
package<br />
s by<br />
BHEL<br />
particul<br />
arly<br />
CHP<br />
due to<br />
change<br />
of<br />
scope.