Sl.<br />

No.<br />

6.<br />

PROJECT<br />

DETAILS<br />

GEPL Thermal<br />

Power Project,Ph-I<br />

(Distt. Chandrapur)<br />

M/s Gupta Energy<br />

Pvt.Limited (GEPL)<br />

Capacity<br />

(MW)<br />

120<br />

Unit - 1 60 11/10<br />

Unit - 2 60 12/10<br />

Commissioning Schedule<br />

Original Actual(A) /<br />

As now<br />

Expected<br />

Syn. Comm Syn. Comm.<br />

11/10 11/10<br />

12/10 12/10<br />

Original Est. cost. : Rs- 65649 Lakhs<br />

Latest Cost : Rs. 65649Lakhs<br />

Exp. Upto 03/10 : Rs. 30316 lakhs<br />

Exp. During 10-11<br />

(upto 04/10 )<br />

Type of fuel : Coal<br />

: Rs. Lakhs<br />

Fuel Linkage :in process<br />

FSA : in progress.<br />

11/10<br />

12/10<br />

Financial closure : Achieved<br />

Date of Main Plant Order : Placed on M/s Thyssenkrupp<br />

Industries India Pvt.Ltd. (Boiler)<br />

in 04/09 and China National<br />

Automotive Industries<br />

International Cooperation (TG) in<br />

03/09.<br />

Power Evacuation System:<br />

- 81 -<br />

Broad Status<br />

1. All required clearances are available.<br />

2. Order for all the BOPs have been placed<br />

and work is in progress.<br />

Unit-1<br />

Boiler<br />

1. Boiler erection started on 02.09.09.<br />

2. Boiler Drum lifted on 14.01.10.<br />

3. Boiler HT expected in 08/10.<br />

TG<br />

1. Condenser erection started on 05.03.10.<br />

2. TG erection start is expected on<br />

16.04.10.<br />

Critical<br />

Areas