PROJECT<br />
DETAILS<br />
GEPL Thermal<br />
Power Project,Ph-I<br />
(Distt. Chandrapur)<br />
M/s Gupta Energy<br />
Pvt.Limited (GEPL)<br />
Capacity<br />
(MW)<br />
120<br />
Unit - 1 60 11/10<br />
Unit - 2 60 12/10<br />
Commissioning Schedule<br />
Original Actual(A) /<br />
As now<br />
Expected<br />
Syn. Comm Syn. Comm.<br />
11/10 11/10<br />
12/10 12/10<br />
Original Est. cost. : Rs- 65649 Lakhs<br />
Latest Cost : Rs. 65649Lakhs<br />
Exp. Upto 03/10 : Rs. 30316 lakhs<br />
Exp. During 10-11<br />
(upto 04/10 )<br />
Type of fuel : Coal<br />
: Rs. Lakhs<br />
Fuel Linkage :in process<br />
FSA : in progress.<br />
11/10<br />
12/10<br />
Financial closure : Achieved<br />
Date of Main Plant Order : Placed on M/s Thyssenkrupp<br />
Industries India Pvt.Ltd. (Boiler)<br />
in 04/09 and China National<br />
Automotive Industries<br />
International Cooperation (TG) in<br />
03/09.<br />
Power Evacuation System:<br />
- 81 -<br />
Broad Status<br />
1. All required clearances are available.<br />
2. Order for all the BOPs have been placed<br />
and work is in progress.<br />
Unit-1<br />
Boiler<br />
1. Boiler erection started on 02.09.09.<br />
2. Boiler Drum lifted on 14.01.10.<br />
3. Boiler HT expected in 08/10.<br />
TG<br />
1. Condenser erection started on 05.03.10.<br />
2. TG erection start is expected on<br />
16.04.10.<br />
Critical<br />
Areas