Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Sl<br />
No<br />
Project Name/<br />
Unit No.<br />
State/<br />
Impl. Agency<br />
5 Mundra TPP Ph-1<br />
U-1<br />
U-2<br />
Gujarat/<br />
Adani Power Ltd<br />
6. Sugen CCPP<br />
Gujarat /Torrent<br />
Block-2<br />
Block-3<br />
Power Gen. Ltd.<br />
7 Torangallu Extn.<br />
U-1<br />
U-2<br />
Karnataka/ JSW<br />
Energy Ltd<br />
8 Sterlite TPP<br />
Orissa/ Sterlite<br />
U-1 Energy Ltd.<br />
9 Jallipa-Kapurdi TPP Rajasthan/ Raj West<br />
U-1<br />
U-2<br />
U-3<br />
U-4<br />
Power Ltd ( JSW)<br />
Targeted<br />
Cap.<br />
(MW)<br />
330<br />
330<br />
382.5<br />
382.5<br />
300<br />
300<br />
600<br />
135<br />
135<br />
135<br />
135<br />
Original<br />
Comm.<br />
Schedule<br />
07/09<br />
10/09<br />
-<br />
02/08<br />
-<br />
01/09<br />
- 6 -<br />
07/09<br />
09/09<br />
01/10<br />
03/10<br />
05/10<br />
Targeted<br />
Comm.<br />
Date<br />
08/09<br />
10/09<br />
05/09<br />
06/09<br />
04/09<br />
12/09<br />
12/09<br />
06/09<br />
09/09<br />
11/09<br />
12/09<br />
Cap.<br />
(MW)<br />
Achieved<br />
330<br />
330<br />
382.5<br />
382.5<br />
300<br />
300<br />
1577<br />
135<br />
------<br />
-------<br />
------<br />
10 Budge- Budge-III WB/ CESC<br />
U-3<br />
250 07/09 08/09 250<br />
Sub Total (C) 5290 3987/<br />
TOTAL ASSURED (A+B+C) 10359 7956/<br />
9056<br />
II COMMISSIONING WITH EFFORTS<br />
A CENTRAL SECTOR<br />
1 Barsingsar Lignite<br />
U-2 Rajasthan/ NLC 125 06/09 01/10 ----<br />
2 Mejia Extn.<br />
W.B/DVC<br />
U-1<br />
500 02/2010 02/10 ----<br />
Sub Total (A) 625 ----/-----<br />
B STATE SECTOR<br />
1 Kakatiya TPP<br />
U-1<br />
AP/ APGENCO<br />
500 05/09 03/10 -----<br />
2 Surat Lignit TPP Extn.<br />
U-4<br />
Gujarat/ GIPCL<br />
125 04/09 03/10<br />
3 Rajiv Gandhi TPS, Hissar Haryana/ HPGCL<br />
U-2<br />
600 03/10 03/10 ------<br />
4 Chhabra TPS<br />
Rajasthan/<br />
U-2 RRVUNL<br />
250 02/09 03/10<br />
Sub Total (B) 1475 ----/----<br />
C PRIVATE SECTOR<br />
1 Rithala CCPP<br />
Delhi/ NDPL<br />
GT1<br />
35.75 07/09 01/10 -----<br />
GT2 Delhi/ NDPL<br />
35.75 07/09 01/10 ------<br />
ST Delhi/ NDPL<br />
36.50 07/09 01/10 ------<br />
2 Jallipa-Kapurdi TPP Rajasthan/ Raj West<br />
U-5 Power Ltd ( JSW) 135 07/10 02/10 ------<br />
3 Rosa TPP Ph-I UP/ Rosa Power<br />
U-1 supply Co. Ltd.<br />
(Reliance Energy)<br />
300 03/10 03/10 300<br />
Sub Total ( C ) 543 300<br />
TOTAL COMMISSIONING WITH<br />
EFFORTS (A+B+C)<br />
2643 300<br />
TOTAL ( ASSURED+ WITH EFFORTS) 13002 9106<br />
Anticipated/A<br />
ctual Date of<br />
Comm.<br />
04.08.09(A)<br />
17.03.10(A)<br />
07.05.09(A)<br />
08.06.09(A)<br />
27.04.09(A)<br />
24.08.09(A)<br />
04/2010<br />
16.10.09(A)<br />
04/2010<br />
05/2010<br />
07/2010<br />
29.09.09(A)<br />
05/2010<br />
07/10<br />
05/2010<br />
04/2010<br />
07/2010<br />
05/2010<br />
05/2010<br />
06/2010<br />
07/2010<br />
09/2010<br />
10.02.2010(A)<br />
Remarks/<br />
Status<br />
Slipping to<br />
2010-11<br />
U-2,U-3 & U-<br />
4 Slipping to<br />
2010-11<br />
Slipping to<br />
2010-11<br />
Slipping to<br />
2010-11<br />
Slipping to<br />
2010-11<br />
Slipping to<br />
2010-11<br />
Slipping to<br />
2010-11<br />
Slipping to<br />
2010-11<br />
Slipping to<br />
2010-11<br />
Slipping to<br />
2010-11<br />
Slipping to<br />
2010-11<br />
Slipping to<br />
2010-11