BROAD STATUS OF TRIPURA CCPP THERMAL POWER PROJECT<br />
Cap<br />
(MW)<br />
Syn.<br />
comm<br />
II PROJECT UNDER CONSTRUCTION<br />
1.<br />
Tripura CCPP<br />
Village :<br />
Palatana<br />
Distt:Udaipur<br />
(Tripura)<br />
OTPC (JV of<br />
ONGC, Tripura<br />
State and IL&FS)<br />
726.6<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
now Expected<br />
COD Syn.<br />
comm<br />
COD<br />
U#1<br />
363.3 12/11 - 06/12<br />
07/12<br />
U# 2 363.3 03/12 - 11/12<br />
12/12<br />
Date of Approval by State Govt.<br />
15.01.2007<br />
Org. Est. cost :Rs. 342900 lakhs<br />
Latest cost :Rs. 342900 lakhs<br />
Comm. Exp. Upto 03/2009 : Rs 34737 lakhs<br />
Exp. During 2009-10<br />
: Rs 10300 lakhs<br />
( Upto 03/10)<br />
Financial closure : July’09<br />
Type of fuel : Natural Gas(base fuel)<br />
Fuel Source : From ONGC basin through pipeline<br />
26<br />
09/12<br />
02/13<br />
Date of Main Plant Order : 23.06.2008 on M/s BHEL (EPC)<br />
Zero date of the project : 23.06.2008<br />
Power Evacuation 1. 400 kV Pallatana- Silchar D/C line<br />
with twin Lapwing conductor<br />
2. 400 kV Silchar-Bongaigaon D/C line<br />
with twin Lapwing conductor<br />
3. New 2x200 MVA 400/132 kV<br />
substation at Silchar (Assam)<br />
4.Pallatana- Surajmani Nagar 400 kV<br />
DC charges at 132 kV<br />
Broad Status<br />
• Gas Sales & Purchase<br />
Agreement (GSPA)<br />
executed between OTPC<br />
and ONGC.<br />
• BHEL appointed M/s<br />
SNC Power Corp. (P)<br />
Ltd., as civil contractor<br />
for the project.<br />
• LOI for Logistics has<br />
been placed on M/s ABC<br />
India Ltd on 17.3.10.<br />
• Major long lead items<br />
ordered namely GT,<br />
Rotor forgings, STG etc.<br />
Critical Areas<br />
• Transportatio<br />
n of heavy<br />
equipments<br />
to site.<br />
• Placement of<br />
order for<br />
BOPs.<br />
• Transmission<br />
Lines/Power<br />
Evacuation.