Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Sl.<br />
No.<br />
Project Details<br />
C Private Sector<br />
1<br />
Jallipa Kapurdi TPP<br />
Raj West power ltd.<br />
(Distt. Barmer)<br />
Capacity<br />
(MW)<br />
1080<br />
Syn.<br />
(Com.)<br />
U –1 135 09/09<br />
(10/09)<br />
U-2 135 10/09<br />
(11/09)<br />
U-3 135 12/09<br />
(01/10)<br />
U-4 135 02/10<br />
(03/10)<br />
U-5 135 05/10<br />
(07/10)<br />
U-6 135 07/10<br />
(08/10)<br />
U-7 135 08/10<br />
(09/10)<br />
U-8 135 11/10<br />
(12/10)<br />
Est. approved cost Rs. 507500 lakhs<br />
Revised cost Rs. 507500 lakhs<br />
Exp. During 2007-08 Rs. 105496 lakhs<br />
Exp. During 2008-09 Rs. 236408 lakhs<br />
Exp. Upto 2009-10(upto 9/09) Rs. 48862 lakhs<br />
Exp.During 2010-11 Rs. -- Lakhs<br />
Type of fuel Lignite<br />
Commissioning Schedule<br />
Original Actual (A) /As<br />
now expected<br />
COD Syn.<br />
(Com.)<br />
COD<br />
10/09 08/09(A)<br />
10/09(A)<br />
11/09 6/10(A)<br />
7/10(A)<br />
01/10 08/10<br />
(09/10)<br />
03/10 09/10<br />
(10/10)<br />
07/10 11/10<br />
(12/10)<br />
08/10 01/11<br />
(02/11)<br />
09/10 02/11<br />
(03/11)<br />
12/10 05/11<br />
(06/11)<br />
Fuel Linkage Captive coal mines from Jallipa &<br />
Kapurdi, 40,000 MT coal from<br />
Indonesia.<br />
Date of main plant Order<br />
3/07 on M/s Dongfang<br />
- 46 -<br />
11/09<br />
(A)<br />
08/10<br />
10/10<br />
11/10<br />
01/11<br />
03/11<br />
04/11<br />
07/11<br />
Power evacuation system 400 KV Jhodpur - 1nos. and Barmer<br />
– 2 nos.<br />
200KV, Dohrimanna – 2 nos. &<br />
Barmer – 1nos.<br />
Broad Status<br />
BOPs<br />
a) 6.6kV/440V two dry type transformers<br />
and turbine MCC charged<br />
b) 183 km of RW pipeline laid.<br />
Unit-1<br />
Unit synchronized on 17.08.09,<br />
commissioned on 16.10.09 and COD<br />
achieved on 26 th Nov. 09.<br />
Unit-2<br />
Unit synchronized on 16 th June’10 and<br />
achieved full load on 8.7.10.<br />
Unit-3<br />
a) Boiler drum lifted on 19.3.08. Boiler<br />
structure 89% completed.. APH99% and<br />
pressure parts erection 93% completed.<br />
b) Common chimney for Unit- 3&4 shell<br />
casting completed.<br />
c) ESP erection 99% completed. Collecting<br />
plate alignment is in progress.<br />
d) Boiler H/T completed on 12 th Jun’10 and<br />
BLU is expected in Aug’10.<br />
e) Unit synchronization is expected in 08/10.<br />
Unit-4<br />
a) Drum lifting completed on 2.6.08. Boiler<br />
structure erection 90% completed. APH<br />
98% and pressure part erection 97%<br />
completed.<br />
b) ESP erection 93% completed. Collecting<br />
plate alignment is in progress.<br />
Unit-5<br />
a) Boiler drum lifted on 4.8.08, boiler<br />
structure work 86% completed. APH<br />
erection 89% and pressure part erection<br />
54% completed.<br />
b) Common chimney for Unit- 5&6 shell<br />
casting completed.<br />
c) ESP erection 92% completed.<br />
Unit-6<br />
a) Boiler structure work 82% completed.<br />
b) ESP structure work 87% completed. APH<br />
erection 81% completed and pressure part<br />
erection 56% completed.<br />
c) Chimney for Unit 5&6 completed.<br />
Unit-7&8<br />
a) Boiler structure work for Unit 7&8 is 27%<br />
&30% completed respectively.<br />
b) ESP for U-7 77% completed & U-8 7%<br />
completed.<br />
c) Common chimney for Unit-7&8<br />
completed.<br />
d) Ash cooler, startup burners, ignition &<br />
fuel oil system shipped from China.<br />
Critical<br />
Areas