Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Sl.<br />
No.<br />
2<br />
3.<br />
PROJECT<br />
DETAILS<br />
Pipavav CCPP ,Ph-<br />
I, GSPC PIPAVAV<br />
Power Company<br />
Limited<br />
Distt: Amreli<br />
GPPC<br />
Cap<br />
(MW)<br />
702<br />
Commissioning Schedule<br />
Original Actual(A) / As<br />
now Expected<br />
Syn. Comm Syn) Comm<br />
Block-I 351 07/10 09/10 12/10 02/11<br />
Block-II 351 10/10 11/10 03/11 05/11<br />
Date of TEC : Not Required<br />
Org.Est. cost : Rs.235429 Lakhs<br />
Latest cost : Rs.249834 Lakhs<br />
Exp. Upto 03/08 : Rs. 23213 Lakhs<br />
Exp. During 08-09<br />
: Rs. 1890 Lakhs<br />
(Upto 07/08)<br />
Financial closure : 24/01/08<br />
Type of fuel : Natural Gas(base fuel)/LNG (3.2<br />
mcmd gas from GSPC)<br />
Source and supply of Fuel : Gas supply agreement with M/s<br />
GSPC and Gas transportation<br />
agreement with M/s GSPL<br />
Date of Main Plant Order : LOA on 27 /12 /07 , BHEL<br />
(actual order in March 08)<br />
Zero date of the project : 29/03/08<br />
Notice To Proceed(NTP) :29.03.08<br />
Power Evacuation : 3 Double Ckt 220 kV line to be<br />
erected by GETCO:<br />
1. Pipavav- Saverkundla line<br />
2. Pipavav- Dhokabada line<br />
3. Pipavav- Mahuva line<br />
Sikka TPS Extn.<br />
Distt.<br />
GSECL,Gujarat<br />
Unit-3<br />
500<br />
250 01/10<br />
03/10<br />
Unit-4 250 05/10<br />
07/10<br />
Date of TEC<br />
Date of Approval by State Govt.<br />
: Not Required<br />
: N.A.<br />
03/10<br />
07/10<br />
02/12<br />
06/12<br />
06/12<br />
08/12<br />
Org.Est. cost : Rs.193700 Lakhs<br />
Latest cost (10/08) : Rs. 228200 Lakhs<br />
Exp. During 07-08 : Rs.15500 Lakhs<br />
Exp. During 08-09 : Rs.23661.18 Lakhs<br />
Exp. During 09-10(up to12/09) : Rs. 24367.24 Lakhs<br />
Cumulative Exp( up to 12/09) : Rs 63528.42 Lakhs<br />
Financial Closure : 22.05.07<br />
Type of fuel : Imported Coal<br />
Date of Main Plant Order : 10.04.07 .on M/s BHEL (EPC)<br />
- 65 -<br />
06/12<br />
08/12<br />
Zero Date of the Project :22.05.07 (Advance Paid to BHEL)<br />
(To be re-defined in view of pending<br />
compliance of MoEF clearance<br />
condition for project execution)<br />
Broad Status<br />
1. All required clearances are available.<br />
2. Site mobilized in Nov.08 and Civil<br />
works started in Dec.08.<br />
3. On 08.08.09, truck carrying GT-1<br />
from Mnudra port to Pipavav site<br />
fell into river due to collapse of 3 rd<br />
span slab of the bridge over<br />
Shetrunji river near Bhavnagar<br />
(about 100 km from site). CMD,<br />
BHEL confirmed that new GT will<br />
be supplied to the site.<br />
4. HRSG-1&2: HRSG supply already<br />
started & completion is expected by<br />
06/10. HRSG -1 erection started on<br />
24.11.09.Foundation RCC columns<br />
work in progress for HRSG-2<br />
5. GT-1&2: GT-1 erection start is<br />
expected in 09/10. Reinforcement<br />
steel placing in progress for GT-2.<br />
6. GTG& STG building: yet to be<br />
made ready.<br />
7. Supply of GTs is expected by 08/10.<br />
8. STs supply is expected by 09/10.<br />
9. ST erection is expected from<br />
01.10.10.<br />
1. MOE&F clearance received on<br />
24.05.05 with conditions of forest<br />
land utilization for hot & cold water<br />
channel for existing plant .<br />
2. Zero date of the project is 22.05.07.<br />
3. M/s TCE appointed as project<br />
Consultant..<br />
4. Imported Coal long term<br />
arrangement is under process.<br />
9.Unit No.3 & 4 Boiler drums received<br />
at site .<br />
10. After opening of Tech. bids, List of<br />
6 vendors for boiler erection sent to<br />
GSECL for approval on 26.03.09.<br />
11. EPC progress is 13%.<br />
12. The proposal for diversion 96.5Ha.<br />
forest land is submitted by GoG to<br />
MOEF. The query raised by MOEF on<br />
21.07.09 is replied by GoG on<br />
29.07.09. The matter was discussed in<br />
the MOEF Forest Advisory Committee<br />
during its meeting on 20.08.09.<br />
13. Erection work held up due to MOEF<br />
clearance.<br />
Critical<br />
Areas<br />
BHEL/<br />
BJCL<br />
is slow<br />
in<br />
executi<br />
on of<br />
civil<br />
works.<br />
Constructi<br />
on work<br />
held up<br />
due to<br />
conditiona<br />
l<br />
Environm<br />
ent<br />
Clearance<br />
by MOEF<br />
regarding<br />
Forest<br />
land<br />
utilized<br />
for hot and<br />
cold water<br />
channel<br />
and ash<br />
dyke for<br />
the<br />
existing<br />
plant is<br />
necessary<br />
before<br />
starting<br />
the<br />
project.<br />
2) Long<br />
term tie up<br />
for<br />
imported<br />
coal.