Sl.<br />

No.<br />

1.<br />

PROJECT<br />

DETAILS<br />

Capacity<br />

(MW)<br />

PRIVATE SECTOR<br />

JSW Energy(<br />

Ratnagiri)<br />

Limited, TPP at<br />

Jaigad<br />

(Distt. Ratnagiri)<br />

JSW Energy(<br />

Ratnagiri)<br />

Limited<br />

1200<br />

Unit - 1 300 12/09<br />

Unit - 2 300 02/10<br />

Unit - 3 300 04/10<br />

Unit - 4 300 06/10<br />

Commissioning<br />

Schedule<br />

Original Actual(A) /<br />

As now<br />

Expected<br />

Syn. Com. Syn. Com.<br />

03/10 06/10(A) 07/10<br />

05/10 08/10<br />

07/10 09/10<br />

09/10 11/10<br />

Date of TEC : Not Required<br />

Date of Approval by State<br />

Govt.<br />

: 10.06.05<br />

Original Est. cost. : Rs- 450000 Lakhs<br />

Latest Cost : Rs. 450000 Lakhs<br />

Exp. During 07-08 : Rs. 52200 Lakhs<br />

Exp. During 08-09 : Rs. 97200 Lakhs.<br />

Exp.During 09-10 :Rs.250600 Lakhs<br />

Exp.During 10-11 :Rs.<br />

Type of fuel : Imported Coal<br />

09/10<br />

11/10<br />

01/11<br />

Fuel Linkage Imported Coal (very low<br />

Sulphur & Ash content)<br />

Financial closure : Achieved on 02.08.07<br />

Date of Main Plant Order : M/sShanghai Electric Power<br />

Generation Company, China on<br />

04.07.07 (BTG) under –ICB<br />

route<br />

BOP contract awarded to SEW-<br />

ABB-EDAC consortium with<br />

EDAC as lead partner.<br />

Power Evacuation System: There are two 400kV lines :<br />

(1) New KOYNA Line<br />

(2) KARAD Line.<br />

Order for both the lines placed on M/s L&T on 02.07.08. The<br />

work is lagging behind the schedule.<br />

- 78 -<br />

Broad Status<br />

1. All required clearances are available.<br />

2. Zero date of the project is 04.07.07.<br />

3. Order for all the BOPs have been placed.<br />

4. Mega Power status is yet to be received.<br />

5. chimney # 1: Flue -1 ready for operation.<br />

6. Chimney # 2: Outer shell completed in 03/09.<br />

Structural fabrication and erection completed.<br />

Flue and brick lining work is in progress.<br />

7. IDCT # 1- 4: all civil works completed.<br />

8. 92% overall material for 4 units received at site<br />

upto 12/09.<br />

9. Start up power received on 17.04.10<br />

Unit-1<br />

Boiler<br />

1. A total of 87% material erected upto 12/09<br />

2. Boiler erection started on 22.05.08<br />

3. Boiler drum lifted on 01.11.08.<br />

4. Boiler HT completed on 06.07.09.<br />

5. Boiler light up completed on 31.01.10.<br />

6. Chemical cleaning completed in 02/10.<br />

7. SBO started on 01/05/10 and completed on<br />

16.05.10.<br />

8. Synchronised on 21.06.10.<br />

TG<br />

1. TG erection started in 03/09.<br />

2. TG box up completed in 12/09.<br />

3. Oil flushing completed.<br />

4. TG put on Barring Gear.<br />

Unit-2<br />

Boiler<br />

1. A total of 74% material erected upto 12/09.<br />

2. Boiler erection started on 15.07.08.<br />

3. Boiler drum lifted on 12.01.09.<br />

4. Boiler HT completed in 10/09.<br />

5. BLU expected in 07/10.<br />

TG<br />

1. TG erection started in 05/09.<br />

2. TG box up completed on 10/.05/10.<br />

Unit-3<br />

Boiler<br />

1. A total of 55% material erected upto 12/09.<br />

2. Boiler erection started in12/08.<br />

3. Boiler HT completed in 03/10.<br />

4. BLU expected in 08/10.<br />

TG<br />

1. TG piling completed in 12/08.<br />

2. TG erection started on 31. 07.09.<br />

3. TG box up is expected in 05/10.<br />

Unit-4<br />

Boiler<br />

1. A total of 31% material erected upto 12/09.<br />

2. Boiler erection started in 03/09.<br />

3. Boiler drum lifted in 08/09.<br />

4. Boiler HT expected in 10/`10.<br />

TG<br />

1. TG erection started in 12/09.<br />

2. TG box up is expected in 07/10.<br />

Non<br />

Critical<br />

Areas<br />

availability<br />

of SEC<br />

(Chinese)<br />

supervision<br />

team at site<br />

due to visa<br />

problem is<br />

hampering<br />

project<br />

schedule.