Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Jun'2010 - Central Electricity Authority
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Sl.<br />
No.<br />
1.<br />
PROJECT<br />
DETAILS<br />
Capacity<br />
(MW)<br />
PRIVATE SECTOR<br />
JSW Energy(<br />
Ratnagiri)<br />
Limited, TPP at<br />
Jaigad<br />
(Distt. Ratnagiri)<br />
JSW Energy(<br />
Ratnagiri)<br />
Limited<br />
1200<br />
Unit - 1 300 12/09<br />
Unit - 2 300 02/10<br />
Unit - 3 300 04/10<br />
Unit - 4 300 06/10<br />
Commissioning<br />
Schedule<br />
Original Actual(A) /<br />
As now<br />
Expected<br />
Syn. Com. Syn. Com.<br />
03/10 06/10(A) 07/10<br />
05/10 08/10<br />
07/10 09/10<br />
09/10 11/10<br />
Date of TEC : Not Required<br />
Date of Approval by State<br />
Govt.<br />
: 10.06.05<br />
Original Est. cost. : Rs- 450000 Lakhs<br />
Latest Cost : Rs. 450000 Lakhs<br />
Exp. During 07-08 : Rs. 52200 Lakhs<br />
Exp. During 08-09 : Rs. 97200 Lakhs.<br />
Exp.During 09-10 :Rs.250600 Lakhs<br />
Exp.During 10-11 :Rs.<br />
Type of fuel : Imported Coal<br />
09/10<br />
11/10<br />
01/11<br />
Fuel Linkage Imported Coal (very low<br />
Sulphur & Ash content)<br />
Financial closure : Achieved on 02.08.07<br />
Date of Main Plant Order : M/sShanghai Electric Power<br />
Generation Company, China on<br />
04.07.07 (BTG) under –ICB<br />
route<br />
BOP contract awarded to SEW-<br />
ABB-EDAC consortium with<br />
EDAC as lead partner.<br />
Power Evacuation System: There are two 400kV lines :<br />
(1) New KOYNA Line<br />
(2) KARAD Line.<br />
Order for both the lines placed on M/s L&T on 02.07.08. The<br />
work is lagging behind the schedule.<br />
- 78 -<br />
Broad Status<br />
1. All required clearances are available.<br />
2. Zero date of the project is 04.07.07.<br />
3. Order for all the BOPs have been placed.<br />
4. Mega Power status is yet to be received.<br />
5. chimney # 1: Flue -1 ready for operation.<br />
6. Chimney # 2: Outer shell completed in 03/09.<br />
Structural fabrication and erection completed.<br />
Flue and brick lining work is in progress.<br />
7. IDCT # 1- 4: all civil works completed.<br />
8. 92% overall material for 4 units received at site<br />
upto 12/09.<br />
9. Start up power received on 17.04.10<br />
Unit-1<br />
Boiler<br />
1. A total of 87% material erected upto 12/09<br />
2. Boiler erection started on 22.05.08<br />
3. Boiler drum lifted on 01.11.08.<br />
4. Boiler HT completed on 06.07.09.<br />
5. Boiler light up completed on 31.01.10.<br />
6. Chemical cleaning completed in 02/10.<br />
7. SBO started on 01/05/10 and completed on<br />
16.05.10.<br />
8. Synchronised on 21.06.10.<br />
TG<br />
1. TG erection started in 03/09.<br />
2. TG box up completed in 12/09.<br />
3. Oil flushing completed.<br />
4. TG put on Barring Gear.<br />
Unit-2<br />
Boiler<br />
1. A total of 74% material erected upto 12/09.<br />
2. Boiler erection started on 15.07.08.<br />
3. Boiler drum lifted on 12.01.09.<br />
4. Boiler HT completed in 10/09.<br />
5. BLU expected in 07/10.<br />
TG<br />
1. TG erection started in 05/09.<br />
2. TG box up completed on 10/.05/10.<br />
Unit-3<br />
Boiler<br />
1. A total of 55% material erected upto 12/09.<br />
2. Boiler erection started in12/08.<br />
3. Boiler HT completed in 03/10.<br />
4. BLU expected in 08/10.<br />
TG<br />
1. TG piling completed in 12/08.<br />
2. TG erection started on 31. 07.09.<br />
3. TG box up is expected in 05/10.<br />
Unit-4<br />
Boiler<br />
1. A total of 31% material erected upto 12/09.<br />
2. Boiler erection started in 03/09.<br />
3. Boiler drum lifted in 08/09.<br />
4. Boiler HT expected in 10/`10.<br />
TG<br />
1. TG erection started in 12/09.<br />
2. TG box up is expected in 07/10.<br />
Non<br />
Critical<br />
Areas<br />
availability<br />
of SEC<br />
(Chinese)<br />
supervision<br />
team at site<br />
due to visa<br />
problem is<br />
hampering<br />
project<br />
schedule.