11/00713/F - Borough Council of King's Lynn & West Norfolk
11/00713/F - Borough Council of King's Lynn & West Norfolk
11/00713/F - Borough Council of King's Lynn & West Norfolk
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1 Reason To comply with Section 91 <strong>of</strong> the Town and Country Planning Act, 1990, as<br />
amended by Section 51 <strong>of</strong> the Planning and Compulsory Purchase Act, 2004.<br />
2 Condition Notwithstanding the provision <strong>of</strong> Class A <strong>of</strong> Schedule 2, Part 2 <strong>of</strong> the Town<br />
and Country Planning (General Permitted Development) Order 1995, (or any Order<br />
revoking, amending or re-enacting that Order) no gates shall be erected across the<br />
approved access unless details have first been submitted to and approved in writing by<br />
the Local Planning Authority.<br />
2 Reason In the interests <strong>of</strong> highway safety in accordance with PPG13.<br />
3 Condition The visibility splay shown on the approved plans and laid out on site shall be<br />
maintained free from any obstruction exceeding 0.6 metres above the level <strong>of</strong> the<br />
adjacent highway carriageway.<br />
3 Reason To ensure that lines <strong>of</strong> vision are available in the interests <strong>of</strong> highway safety in<br />
accordance with PPG13.<br />
4 Condition Prior to the first occupation or use <strong>of</strong> the golf clubhouse, leisure club and spa<br />
building and block D, E and F hereby permitted the associated on-site parking,<br />
servicing, loading and unloading areas shall be laid out, constructed, surfaced and<br />
drained in accordance with the approved plans and retained thereafter available for<br />
that specific use.<br />
4 Reason To ensure that parking and servicing facilities will be available to serve the<br />
development in accordance with PPG13.<br />
5 Condition The Travel Plan submitted to discharge condition 6 attached to consent<br />
reference 07/00437/FM shall be implemented in accordance with the timetable set out<br />
therein and monitored in accordance with details to be agreed in writing by the Local<br />
Planning Authority so long as any part <strong>of</strong> the development is occupied.<br />
5 Reason To ensure that the development is sustainable in accordance with PPG13.<br />
6 Condition No further development shall take place pursuant to this consent until full<br />
details <strong>of</strong> the foul and surface water drainage arrangements for the site have been<br />
submitted to and approved in writing by the Local Planning Authority. The drainage<br />
details shall be constructed as approved before any further part <strong>of</strong> the development<br />
hereby permitted is brought into use.<br />
6 Reason To ensure that there is a satisfactory means <strong>of</strong> drainage in accordance with<br />
PPS23 and PPS25.<br />
7 Condition The ground floor levels <strong>of</strong> the buildings to be either constructed or converted<br />
as part <strong>of</strong> the development hereby approved shall be set no lower than 6.55m above<br />
Ordnance Datum Newlyn.<br />
7 Reason To protect the development from flooding in extreme circumstances in<br />
accordance with PPS25.<br />
8 Condition The floodplain area <strong>of</strong> the Ringstead River and the Heacham River as<br />
defined in drawing 50580/IPER/102 and in Appendix C <strong>of</strong> the Faber Maunsell<br />
Modelling Report submitted with application 07/00437/FM shall remain sterile and no<br />
development, including any buildings, fencing, walls and/or ground raising shall take<br />
place in this area.<br />
<strong>11</strong>/00302/F Development Control Board<br />
25 July 20<strong>11</strong><br />
107